Post Job Free
Sign in

Project Manager

Location:
Miami, FL, 33172
Posted:
March 09, 2010

Contact this candidate

Resume:

Srinivasa Kommasani

Email: ******************@*****.***

Phone: (786) 566 - 1873

OBJECTIVE:

To secure a challenging position in the area of Construction Management,

utilizing all my experience and knowledge to the fullest.

SUMMARY:

. 5+ years of experience in Project Cost Engineering & Management.

. Completed Master of Science in Construction Management.

. Good knowledge on MS Projects, Primavera, Timberline & Impact (Project

Management Software).

. Excellent communication and analytical skills.

. Tenacity to Execute with "Get it done" disposition.

. Well versed knowledge of Planning, Organizing, and Managing the overall

residential and light construction development for the largest

construction companies.

. Expertise in design and blueprint review and analysis of projects,

preparation of construction documents, bidding, negotiations, sub

contractor selection, material purchasing, scheduling, project budget,

building code compliance, project development, and quality control.

EDUCATION:

. Master's in Construction Management (Florida International

University,Miami,FL)

Graduated: April 2007 (2005 fall to 2007 spring)

GPA:

3.56/4.0

. Bachelor in Mechanical Engineering (University of Madras, TN,

India)

Graduated: May 2004

GPA : 4.00/4.0

PROFESSIONAL EXPERIENCE:

KM - PLAZA Construction Services (Miami, FL)

Present

Assistant Project Manager (Major Duties)

Preparing daily construction logs for ongoing projects and monthly

cost reports.

Provide overall project cost, schedule, estimate, progress

measurement, and change management leadership and expertise.

Participate in kick-off meetings with the EPC contractor(s) and PMT to

ensure common understanding of cost, estimate, progress measurement,

and change management requirements Conduct briefing sessions for

project team members with respect to project control requirements and

processes.

Develop and document Control Estimates, and Budgets (annual and multi-

year), and ensuring that these products reflect the approved project

design/execution scope.

Assist PMT / sub-project management in developing/reviewing cost

corrective actions and recovery plans, and making sure needed

actions/plans are implemented.

Executing of the Project according to the given Structural Design,

control of quality of materials being used, supervising the quality of

work, and Erection .Certified and undergone training from OSHA.

Review and process all shop drawings, Submittals and RFI's in

reference to building systems.

Prepare, expedite, and monitor logs for tracking shop drawings,

contract documents, submittals, request for information, change

orders, material delivery logs and other as determined necessary for

project coordinating filed activities with design changes and internal

scheduling.

Provide quick response time to field operations to maintain the

integrity of overall project working on all change orders & monthly

requisitions simultaneously like a chief engineer.

Effectively negotiate owner change orders with all proper supportive

change documentation and have been working like a cost engineer

dealing with project costs more than $ 200 million.

TATA Projects Limited, India

May 2004 - August 2005

Construction Manager/Staff Engineer

Supervised site work for subdivision build outs. Typical Power plant

erecting various accessories and structures (Sheet Metal

Manufacturing).

Prepared Daily Reports and Field Inspection Reports for planning board

review.

Meet inspectors on site to keep development process proactive according to

instructions of Project Managers.

Value Engineering for cost reduction and quality.

Interface / Co-ordinate with Design Consultants, Optimization of

Engineering Design through critical review.

Optimization of cost for equipment.

System packages. Timely Technical Support to Internal Customers.

Preparation of Technical Evaluation Report with ASME standards (Review

drawings submitted by technical consultant and review consultant).

Participating in all the project initiatives from time to time.

Erecting and commissioning of all HVAC parts and accessories in the

plant. Undergone training in all kinds of power projects like thermal,

Hydal, nuclear and gas power plants.

Bachmann Industries Limited,India

May 2001 - Jan 2004

Intern, Software Applications

Verifying field measurements of survey team for final designs.

Drafting of various Mechanical parts and assemblies for Power plant

projects.

Responsible for survey crew training and scheduling.

Exposure to primarily office and undergone Training in Larsen & Turbo

as a QA/QC inspector in Welding and Metal Cutting.

Trained as an ASNT Level II inspector in MT, UT and PT in welding

technology.

SKILLS:

. Application Tools: AutoCAD, Primavera, and Impact 2007(Web based

Project management software)

. Tools: MS Office (Word, Excel, Power point, Access, Projects).

PROFESSIONAL MEMBERSHIPS & AWARDS:

. Member of ASME (American Society of Mechanical Engineers) USA

. Awarded as best graduate research Assistant, Florida International

University, Miami.

. Member of ISME (Indian Society of Mechanical Engineers) USA.

. Member of USGBC as a LEED AP.

. Outstanding Undergraduate student with University rank with a GPA

of 4.0/4.0 for the year 2003-2004 in Department of Mechanical

Engineering, University of Madras, India.

PS: Project details explained in the next page

References: Will be provided upon request

PROJECTS:

Marquis, [pic]

KM Plaza Marquis

Marquis preconstruction is a 66 story gorgeous

residential tower, with a small boutique

style hotel having vast views of Biscayne Bay.

Marquis condos have 300 units of

residential condominium and 50 room's boutique hotel.

Condominium will have an infinity-edge heated pool,

9000sqft. Fitness/spa, restaurant, retail shops,

covered parking and a long list of amenities.

W Hotel, [pic]

KM Plaza

The W South Beach Hotel & Residences is a five-star, W Hotel

luxury condo hotel located in exciting South Beach.

It is 21 stories high and will consist of 511

studios, one- and two-bedroom units.

With 300 feet of ocean frontage, the W South Beach

offers private beach access.

Konaseema Power Generation, [pic]

Tata Projects Limited

Konaseema Power Generation

The 460 Mw gas-based plant started generating 100 Mw

of power with limited quantities of natural gas made

available by the state government, and fed into the

state grid through its dedicated 400 KV transmission

system of APTransco.

The plant is located close to the landfall point of

RIL, within a radius of 15 km from the KG Basin,

India



Contact this candidate