Bernard B. Carlisle
P.O. Box #* Cell 559-***-****
Senecaville, OH 43780
************@*****.***
SUMMARY
Achieved significant bottom line results, manufacturing cost reductions,
injection molding, blow mold, extrusion equipment and performance
improvements, processing commercial and engineering resins, high speed/high
volume, mold cavitation improvements, machine performance improvements,
machine and facility productive maintenance improvements, scrap reduction,
process improvements, develop/execute cost controls, implemented numerous
product quality improvements, drives continuous improvement.
EXPERIENCE
Jet Plastica Industries, Fowler, CA 5/02 -
5/08
Plant Manager
Increased capacity (30%) and redeveloped Western extrusion/injection
molding division. (disposable cutlery and straws) Directed performance
turnaround of high speed, high volume, injection molding MFG (Philadelphia
facility) with 47 injection machines, 24/7. Improved safety, quality and
output from 17.7 cs/dl to 32.7cs/dl. Improved division Food Related HACCP
scores, product quality and safety.
. Reduced direct and indirect labor with productivity gains of 50%
. Improved output with focus on manufacturing disciplines and GMP's
. Completed numerous capital cost reduction projects at ($250k
savings annually)
. Improved employee safety, developed systems and facility
improvements
. Improved product quality and output with mold and machine
improvements
. Improved equipment reliability with Productive Maintenance and
CMMS.
. Developed and implemented scrap recovery process.
Lear Corporation, Lebanon, VA 1/00 - 8/00
Facilities/Maintenance Manager
Facilitated $14mm Facility (Lean) restructure and expansion (automotive
door panels). Implemented MP2, maintenance management system and annual
training agenda. Rebuilt molding machines, reduced machine downtime,
installed new equipment.
. Redesigned facility to eliminate waste of materials movement
. Relocated all primary and secondary manufacturing equipment
. Participated in company Six-Sigma development program
. Built 10,000 sq. ft. expansion
. Implemented CMMS and preventive maintenance program
Tamor Corporation, Chicago, IL 8/98 - 4/99
Director of Operations
Planned and executed seamless transition of acquired product line(s)
(rolling storage carts)
between Tenex and Tamor. Renovated existing facility with 32 new and used
injection molding machines. ($10mm) Built 100,000 sq. ft. warehouse to
existing 180,000 sq. ft. manufacturing center. Implemented cellular
manufacturing to Rolling Storage Product line. Hired operations staff to
manage 280,000 sq. ft. facility 24/7.
. Reduced budgeted workforce 25% by incorporating work cells.
. Incorporated SPC, Kanban, cycle counting, GMP's
. Established labor and raw material cost controls
Zeta Consumer Products Corp. Kingman, AZ 2/97 -
7/98
Plant Manager
Directed plant turnaround. (Housewares) 750k sq. ft. facility with 28
injection and 3 large blow mold machines, 350 to 1500 tons, 24/7.
Implemented productive maintenance, safety motivational programs, quality
assurance and inventory cycle counting.
. Established labor and raw material cost controls.
. Implemented quality assurance process and personnel.
. Implemented workplace disciplines, GMP's and OSHA compliance.
Ekco Consumer Plastics, Inc. Phoenix, AZ 3/93 -
1/97
Plant Manager
Built 100,000 sq. ft. State-of-the-Art, Housewares' manufacturing facility.
($6mm) Selection and purchase of primary and secondary equipment.
Established and maintained annual zero based budget to achieve established
margins.
. Completed building ahead of schedule and under budget.
. Selected, hired and developed staff to manage 24/7 operations (8
direct reports)
. Shipped customer orders 99% complete and on-time (4 years).
. Established quality SPC program and GMP's with all employees.
. Developed safety motivational programs and cross-trained all MFG
personnel.
Rubbermaid, Inc. Goodyear, AZ 12/88 - 2/93
Technical Manager
Developed technical and maintenance personnel (5 direct, 60 indirect
reports) to effectively manage 390k sq. ft. facility, 24/7, world class
injection molding. Increased capacity from 17 to 27 machines. Rebuilt and
modified blow molding machinery for efficiency gains and scrap reduction.
. Directed material usage improvements to achieve 120% positive
varience.
. Directed projects to reduce scrap 50% and increase utilization 13%.
. Generated $700k annual cost savings with SPC, SMED and GMP's .
. Developed annual training programs to provide 80 hours per
technical employee.
Duracell, USA Cleveland, TN 5/86 - 12/88
Plastics Process Engineer
Started-up 24/7 injection molding operation to produce close tolerance
battery components. Installed and set-up machinery, performed process
start-up, troubleshooting and training for all manufacturing personnel.
Established quality inspection criteria, managed quality department,
developed specifications for process and plastic material selection.
. Improved utilization from 75% to 92%, reduced scrap from 7% to
0.5%.
. Developed mold/machine preventive maintenance procedures.
. Implemented product/process improvements to reduce product defects.
Pliant Plastics. Muskegon, MI 11/81 -
3/86
Plastics Manager
Managed custom injection molding operations with 18 machines, purchased
equipment, resins, colorants, performed r & d, process development, worked
with customers on new products from concept thru production. Implemented
technical training and quality controls lab.
. Consolidated vendors to reduce raw materials cost 17%.
. Injection molding processing, troubleshooting and process
efficiency.
. Started-up new tools, sampled new resins, provided technical
training.
. Performed mold/machine/maintenance, troubleshooting and cost
reductions.