PAUL E. GOZAR
**** *. **** ******, ****** Grove, I L 60053 847-***-**** ******@***.***
PROFESSIONAL SUMMARY
Accomplished construction management professional skilled in team leadership, architectural
design and subcontractor relations. Committed to exceeding customer expectations using well-
rounded knowledge of the design-build industry. Recognized for adept handling of challenging
development projects and the ability to meet difficult deadlines and financially manage projects.
Successfully implemented numerous projects of all sizes throughout the Chicagoland area with a
variety of contractors and resources.
PROFESSIONAL Walsh Construction Company of Illinois Chicago, IL
EXPERIENCE A $4 billion family-owned business with a national presence specializing in general contracting, construction
management and design-build services.
Project Manager
Sept 2000 –
Responsible for providing comprehensive project leadership in all trade areas
May 2009
for a variety of small and large commercial and residential buildings
• Prepared scopes of work of all trades, reviewed bids/proposals during the bidding
process, hired subcontractors, and prepared subcontractor agreements.
• Created and offered value engineering options to owners for additional cost savings.
• Met overall project budgets by analyzing all buyouts and controlling costs
• Managed workflow and direction of subcontractors, including the creation of the
master schedule and 3-week lookahead schedules using Suretrack 3.0 to track
progress and meet construction milestones.
• Initiated solutions for a wide range of preconstruction plans, materials delivery, and
means and methods of installation
• Coordinated all subcontractor shop drawings between each other and the
construction drawings.
• Handled required documentation such as RFI’s, PCO’s, pay applications, permits,
hoisting plans, and JHAs.
• Managed subcontractors on a daily basis as to the timely release of material
fabrication and adequate manpower and crews.
• Built necessary relationships with community members such as onsite city or village
task force inspectors to obtain Temporary Certificate of Occupancy
• Created and completed all punchlist items and prepared project close-out documents
which included as-builts, owner’s manuals, onsite training and warranties.
• Recognized for valuable expertise in construction, safety, and scopes of work for all
trades
Wight & Company Downer’s Grove, IL
Project Architect/Construction Field Representative
Responsible for all phases of construction development from schematic to final
Jan 1998 –
• Produced construction documents to meet zoning and building code specifications for
Sept 1999
educational facilities and CDB projects
• Resolved various engineering issues with contractors by developing detailed project
schedules and CPM charts
• Coordinated solutions with clients, technical staff, and specialized contractors
surrounding architectural aspects of projects
• Conducted pre-bid and bid opening meetings to improve communication flow
• Worked closely with Project Managers to ensure budgets and deadlines were met
• Served as on-site field consultant for General Contractor/Owner
Matocha Associates Oak Brook Terrace, IL
June 1996 –
Staff Architect/Job Captain & Material Resource Manager
Dec 1997
Provided expertise and direction for all phases of health care facilities and retail
projects
• Prepared C.M and G.C. construction documents and specifications and all project
addendums/bulletins
• Selected materials and prepared presentation drawings and color renderings for client
meetings
• Researched office library needs and met with Sales Representatives to update
resources
• Approved contractor shop drawings and worked directly with in-house construction
managers for client deliverables
Held various seasonal positions in the Architectural and Construction industries
Summers
to learn hands-on skill in residential projects, cost estimating, color
1992 – 1996
renderings, and site surveying
EDUCATION &
University of Illinois Urbana-Champaign, IL
TRAINING
Master of Science, Civil Engineering-Construction Management Option,
1995
Master of Architecture-Practice and Technology Option, 1995
Bachelor of Science, Architectural Studies, 1993
Third year completed in Versailles, France (L’Ecole d’Architecture)
Earned Numerous Dean’s List, Scholarships, and Awards during college
Registered/Licensed Architect, NCARB Certified, AIA
PAUL E. GOZAR
7634 W. Lake Street, Morton Grove, I L 60053 847-***-**** ******@***.***
SIGNIFICANT PROJECTS COMPLETED
CONSTRUCTION
Blue Cross Blue Shield Corporate Headquarters – Chicago, IL.
(Millennium Park)
Project Manager for a 24 story new addition to an existing 31 story office building
along the Chicago lakefront and Millennium Park skyline. This unique project will
double BCBS’s corporate office space. The 24 floor structural steel addition included
16 new elevators, 2 floors of cafeteria, new conference area, and new curtain wall and
custom metal stairs to match the existing. Extensive logistic planning was done for
the 2 tower crane assembly and disassembly, air flow studies for the existing cooling
tower to be operational during construction, and overall safety of the 4,000 employees
directly below the construction site. Total construction cost of approximately
$245,000,000.
Riverwalk North Apartments – Buffalo Grove, IL.
Assistant Project Manager for an 8 story new construction masonry load bearing
precast plank condominium midrise on a 16 acre site along the Des Plaines River.
Midrise consisted of 90 units, 2 levels of indoor heated garage, exercise room,
community room, and an outdoor terrace. Total construction cost of approximately
$18,500,000.
Park Shore Townhomes, Clubhouse, & Midrise M1 & M2 –
St. Francis, WI. (South Milwaukee)
Assistant Project Manager for a 1 mile lakefront property that consisted of 30 new 3
story townhomes, 2 new 5 story midrise buildings, and a clubhouse in the south
suburb of Milwaukee. Each midrise consisted of 32 condos constructed of masonry
veneer, wood prefabricated panels atop precast planks. The clubhouse consisted of a
2 story community room with kitchenette, exercise room, and business/conference
room. Total construction cost of approximately $19,500,000.
Wells Street Tower – Chicago, IL. (South Loop)
Assistant Project Manager for a 34 story new construction concrete condominium high
rise in Printer’s Row which consisted of 170 units, indoor heated garage, exercise
room, business/conference room, party room, library, bike storage, and retail space.
Total construction cost of approximately $34,500,000.
ARCHITECTURE
Triton College LRC Library Renovation - River Grove, IL.
Project Architect & Construction Field Representative for the renovation of an existing
36,200 SF college library into a state-of-the-art library facility which includes a new
elevator, technology room, internet instruction & use room, 5 new quiet study rooms,
& 2 new offices. Total construction costs of approximately $1,300,000.
Multiple High End Custom Residential Homes – North & Western Chicago
Suburbs
Job Captain for multiple custom residential houses ranging from 2,000 SF to 35,000
SF in the Northshore and western suburbs of Chicago. Total construction costs from
$250,000 to $15,000,000.