**** ***.**.**, *******, Oh. 45840419-***-**** (H) 567-***-****
(M)(***********@***.***
Jeff Holdman
Objective
I am seeking a challenging position that utilizes my interpersonal
skills along with over twenty years of operations management
experience while providing an opportunity for advancement and reward.
Experience
April 2009 to Endres Processing Ohio Upper Sandusky,
Present Ohio
Operations Manager
Responsibilities: This position is responsible for implementing
procedures, providing leadership and guidance with the goal of
developing and sustaining a safe and effective manufacturing process.
This position is directly accountable for production and maintenance
operations utilizing 1 Facilities Engineer, 2 Group Leaders, 4 Control
Room Operators along with 30 indirect hourly reports including,
Material Handling and Maintenance personnel.
Responsible for sustaining plant operating systems through the use of
tools such as standardized work practices and supporting metrics that
have achieved operational efficiency improvements of more than 40% in
period of 6 months.
Implemented continuous improvement methodology such as 5S and TPM that
improved the overall efficiency of the preventative maintenance
program and maintenance window events by more than 25%.
Reduced spare parts inventories by over 50% while reducing lead time
on critical spares by more than 30% on average.
Achieved an average of better than 85% for weekly schedule attainment
in 2009.
October 2001 to Continental Structural Plastics Carey, Ohio
April 2009
Production Manager:
Responsibilities: Production leadership position responsible for a
three shift compression molding operation producing exterior body
panels for the OEM automotive market. Direct reports were 3 Shift
Superintendents, 3 Mold Engineers and 10 Production Supervisors. This
position was directly responsible for manufacturing quality, safety
and schedule attainment along with developing continuous improvement
teams and implementing Lean methodology such as Value Stream Mapping,
TPM, Kanban, Visual Factory and 5S.
Reduced overall direct labor variance to standard by 30 % through
improved work cell labor efficiency, continuous improvement and task
combinations.
Increased output efficiency by 20 % overall through improved work cell
flow.
Reduced scrap dollars by 30 % over a nine month period through
employee involvement and cross functional teams.
Championed plant wide 5S implementation along with developing the
strategy to deploy and maintain the process through employee
awareness, training, accountability, monthly audits and team meetings.
Conducted a Value Mapping event that focused on a single product line
the result of which yielded a monthly 75K + savings of inventory
dollars along with implementing a Kanban system to maintain inventory
control.
July 1998 to Philips Display Components Ottawa, Ohio
October 2001
Shift Manager
Responsibilities: This position was directly responsible for the
manufacturing of cathode ray picture tubes. Each department was
operated as a business unit and this position was directly responsible
for individual shift performance by reporting out daily to the
department leadership on safety, quality, schedule attainment,
maintenance, technical issues and continuous improvement activities.
Directly responsible for the daily output of the shift and
approximately 140 hourly employees. In additional, to control of
material flow into and within the department.
Directly responsible to ensure all policies, safety regulations, EPA
regulations and housekeeping is enforced on shift.
Initiate, facilitate and support any activities related to improvement
actions, TPM, and autonomous maintenance.
Direct and support Technical Leader in activities related to the
identification and execution of training of the production workforce.
Establish and communicate departmental goals.
Organize, support and participate in work cell teams.
1983 to 1998 Findlay Industries, Inc., Molded Findlay, OH
Products Division
Supervisor / Superintendent /Production Manager: I began my career as
a Production Supervisor and was promoted twice over a 15 year period
along with assignments at three different locations in the
corporation.
Directly responsible for the daily functions of a three shift
manufacturing operation with an hourly workforce of approximately 130
employees.
Review of production schedules to evaluate manning and overtime
requirements
Review of all labor reports to determine the root cause of scrap,
rework, downtime, indirect labor, etc. and the implementation of
corrective actions.
Implementation and coordination of Production Accountability meetings
with production personnel and the management staff.
Work in conjunction with the Materials Manager to reduce inventory
variance of raw material.
Education / Training
1981 -1983 A.T.I Branch of O.S.U. Wooster, OH
Associate Degree of Applied Science
Agricultural Business Management and Marketing
Training
Over the past 20 + years of my management career I have completed over
200 hours of training in the areas of APQP, PFMEA, Quality Gates, ISO
Audits, 8D Problem Solving, Error Proofing, 5S, TPM, Value Stream
Mapping along with multiple leadership courses in Safety, Situational
Leadership etc. I have certificates available upon request.
References: Available on Request.