Lew Kuritz
908-***-**** *******@*****.*** *** Cedar Ave Ridgewood NJ 07450
Education:
M.B.A., Rutgers University Executive MBA 1999 GPA 3.8
B.S.E.E., West Virginia University 1988 GPA 3.7
Career Highlights: 14 years with Kraft/Nabisco including 9 years in
Engineering and 5 years in Operations Management. Most recently spent 1.5
years hands on integration for the Pharmaceutical industry while employed
by Glatt Air. Past history includes the production of technical training
videos as a successful entrepreneur, and employment with the US Navy and
Army.
Work History:
Glatt Air Techniques (Market Leader of Fluid Bed Systems) 3/1/2008 -
10/1/2009. Automation Systems Engineer / Programmer Programming Allen
Bradley PLC's (Rockwell Software RSLogix), SCADA systems using Wonderware
Intouch, Visual Basic, Crystal Reports, CTC Interact, RSView, and
Integration of Microsoft SQL Server. Project management and execution of
all phases of engineering from scheduling, estimating, and scope
development. Manage activities of designers, commissioning team,
installation contractors, and validation engineers. Responsibilities
include P&ID's, panel design and schematics, instrumentation selection,
functional descriptions, procurement, installation, systems integration and
programming.
Learning Kurv Enterprises (Sole Proprietor) 7/1/2005 - 2/15/2008.
Production, marketing, and sales of software training video tapes for
Wonderware Intouch, and software products. Advertised in Control
Engineering, Intech, and Video Maker magazines. Products Developed,
Created, Marketed, and Sold included Video producers Teleprompter Software
and Software Training Videos for Wonderware Intouch. Some contract work
with a laser cutting company using Visual Basic.
Kraft / Nabisco 1991 - 2005
6/1/2001 - 7/1/2005 Progressive roles starting as a Program Manager, then
a Manufacturing Business Team Leader, and ending with Operations Business
Manager. Responsible to the division for all aspects of operations
including cost, quality, and delivery. Provided leadership of a cross-
functional management team of Contract Manufacturing, R&D, Finance,
Packaging, Quality, Procurement, Product Supply, and Graphics whose staff
executed projects. Duties included central point of contact to marketing
business teams, project prioritization, driving the business agendas for
growth, creating the productivity agenda, and program championship.
6/1/1999 - 6/1/2001 Manager, Operations Planning. In support of operations
leadership, provided strategic and financial guidance to ensure that
initiatives of operating companies were aligned with the overall strategic
plans. Created presentations and financial analysis of projects, sourcing
opportunities, growth, and plant closures. Developed strategies to optimize
the utilization of assets and human resources. Pursued operational cost
cutting opportunities. Provide rigor during the capital planning process
and budget reviews to maximize the return on invested capital. Liaison
between contract management and business units.
2/1/1991 - 6/1/1999 Progressive roles from a Process Controls Engineer,
advancing to Senior then Supervisory along with increasing
responsibilities. Contributed in varying capacities to the Installation of
21 New Process and Packaging Lines from ingredient delivery, mixing,
baking, packaging equipment, palletizing equipment, and storage and
retrieval equipment. All projects started early or on time, with lower than
estimated cost exceeding company objectives of expansions and
rationalizations. Capital on each project from $8m to $30m, savings on each
project from $2.5m to $8m. Managed activities of engineers, designers,
mechanics, electricians, numerous programmers, contractors, and vendors on
multiple large and mid size projects from $1m-$30m capital. Responsibility
ranged from hands on programming, design and installation as a disciplined
focus to overall project management including, schedule, scope and budgets.
Projects involved estimating, scope development, equipment selection,
purchases, design, installation, startup, and training of process,
packaging, and distribution center equipment.
Lakehurst Naval Air Engineering Center 12/15/1988 - 01/15/1991 Electronics
Engineer. Design work on arrestment control and information systems.
Contributed to Aircraft Carrier modernization program. Designed systems,
instrumentation, software and hardware. Conducted and managed test
following strict protocols.
Picatinny Arsenal Army RD&C Center Ft Dix 5/20/1984 - 9/01/1984 Engineering
Aid/Test Director. Assisted testing of military weapons including
handguns, machine guns, and large detonation systems.
New Jersey Institute of Technology 1995 - 1998 Adjunct Instructor. Taught 4
credit required course plus lab on Control Systems and PLC's for seniors in
the Mechanical Engineering Technology program. Developed entire course, and
secured 6 sets of lab controllers from Allen Bradley. Extremely high
student evaluations.
Selected Career Accomplishments - Engineering Roles
. Executed Fluid Bed, Pancoater, and Air Handler validated projects for
Pfizer, Wyeth, Elite Labs, Shire, and Others.
. Provided customer support, troubleshooting, and system testing for Watson
Labs, Elite Labs, and Astellas.
. Created In House Training Program and Taught Cross Functional Groups on
PLC programming.
. Led 5 network programs installing standard equipment across multiple
sites and multiple lines, all within budget and time frame resulting in
significant labor reductions, raw material savings, and packaging material
savings.
. Engineering on 5 developmental machinery efforts all of which were
implemented resulting in significant savings.
. Chair on standard packaging equipment vendors selection committee
resulting in capital purchase volume discounts of $5m.
. Created standards for servos, level II, packaging machinery,
documentation, training, and safety reducing maintenance inventory,
downtime, training cost, contract maintenance cost, and safety incidence
rates.
. Designed specialized tracking system allowing project implementation
within hurdle rates.
. Designed weight control system for packaging lines, which reduced raw
material waste by 10%.
. Developed line accumulation and reject strategy reducing downtime and
loss by 8.8%
. Created speed control algorithms smoothing production line surges
increasing throughputs and reducing maintenance cost.
. Developed work efficiency tools; estimating database, specification
program, resource allocation program increasing accuracy and reducing task
time by 50%.
. Assisted testing of military weapons including handguns, machine guns,
and large detonation systems.
. Designed Aircraft Arrestment System Controls.
. Introduced commercial PLC controllers to surface ship division.
. Completed Original Charles Demming TQM - Total Quality Management Course,
Continuous Improvement Training, V/V+ Programming, Advanced Visual Basic,
Java, Several AB Courses for Servo and PLC, Wonderware's Intouch Interface
Programming. Studied industry standard guidelines including OSHA, cGMP,
NEC, and CSE (Confined Space Entry).
. Programmed and installed Aircraft landing equipment Preventative
Maintenance System.
. Performed research and development programming and testing of Aircraft
recognition system.
Selected Career Accomplishments - Business Roles
. Achieved Customer Service Levels of 98.5%, reduced customer complaints by
4%, and successfully completed Trans fat reduction against 395 sku's.
. Over delivered on productivity at 4.5% Cost of Goods versus "World Class"
benchmark of 4%.
. Initiated and executed cost cutting strategies as a drive against
Platforms of harmonization, rationalization, repatriations, cross border
sourcing, network best practices, inventory balance, and waste stream
capture.
. Sponsored 24 product commercialization efforts driving top line growth of
$30M for the FS Division.
. Introduced and drove 155 unique productivity initiatives returning $14M
productivity and OCC growth.
. Added operations processes and rigor to the organization via process
enhancements including capital budgeting, strategic decision metrics,
capacity planning, and cost drivers awareness plans.
. Improved workflow and communications via establishment of hurdles for
prioritization, development of a steering committee, asset awareness
growth, and solidification of a formal commercialization process.
. Developed employees via establishment of team leadership roles
independent of functional charge to aid employees in "cross functional"
education.
. Transitioned supply chain warehouse system transition from Nabisco to
Kraft closing 5 facilities.
. Managed through reorganization and significant staff loss without
business interruption or plan delays.
. Created capacity models, EOQ drive, and took leadership role in
forecasting consensus and demand planning.
. Held or improved against all metrics for inventory, supply, distressed,
forecasting, quality, and time to market.
. Led Continuous Improvement Site Manager's efforts achieving productivity
and many safety improvements.
. Implemented web based Best Practice system across multiple divisions
driving savings.
. Created Best in Class measures and analysis driving new opportunities
direction providing $4m in opportunity.
. Developed network wide logistics supply chain analysis including
benchmarked competition cost, asset utilization and period seasonality
loading models, forecast, inventory level, and key performance indicators
all used as basis for strategic rationalization, new product site
selection, and plant closures resulting in savings of $35m.
. Initiated Quality Cost Delivery Employee Empowerment Program and reduced
union grievances, increased efficiency.
. Conducted ATKearny's Operational Performance Improvement Assessment
returning metrics and future savings of $10m.
. Drove numerous projects from concept to approval including savings
development, capital estimates, financial investment models, strategic fit
analysis, presentations, and executive alignment.