Post Job Free
Sign in

Project Manager Quality Control

Location:
Fremont, CA, 94536
Posted:
March 10, 2010

Contact this candidate

Resume:

Rodney Rees

510-***-**** - home

510-***-**** - cell

*******@*****.***

Summary of Qualifications:

. 6 plus years of experience as a project manager with extensive experience

in municipal projects such as wastewater, underground piping, valves,

pumps and layout

. Field supervisory experience overseeing crews of up to fifteen. Strong

team builder with the ability to work with others and focus on results

. Excellent computer skills in Word, Excel, Outlook, Adobe Acrobat.

Familiarity in MS Project and PowerPoint with some AutoCAD

Experience:

March 2009 - March 2010 Corey Delta Constructors

Project Engineer

Estimating - Main Office

. Estimated different aspects of various civil and mechanical jobs

. Gathered job information through job walks and client interface

Project Engineer - Evergreen Oil Newark Expansion Project

. Developed Project schedule, incorporating numerous client

subcontractors and vendors

. Material procurement, direct contact between Corey Delta Constructors

and EOI (client)

. Request Information(RFI), researched, and developed documentation for

the RFI process

. Document Control - Maintained job information

August 2003 - December 2008 Anderson Pacific Engineering Construction Inc.

Project Manager

. Field measurement and layout of pumps, piping, electrical conduits,

etc. for all aspects of constructing pump stations and sewage lift

stations.

. Write subcontracts, manage subcontractors and develop schedules.

. Process construction purchase and change orders, request for

information (RFI), submittals and progress payments.

. Developed budgets, managed budget throughout project and conduct

financial projections.

. Financially accountable for projects including monthly invoicing and

project closeout.

. Manage and lead a team of field personnel as well as supervising

construction and conducting weekly safety meetings.

. Oversaw all facets of project design, construction and occupancy of

project.

. Liaison between the building department, architects, structural

engineers, owners and construction managers.

Projects:

Recycled Water Pump Station Upgrades, Regional Water Quality Control Plant

- City of Palo Alto

. Upgrades to the recycled water pumping systems, including demolition

and installation of pumps, piping, valves, motors and controls.

CPA Flowmeter Replacement, Regional Water Quality Control Plant - City of

Palo Alto

. Replacement of exist 36" flow meter, bypassing an approximate 4000 GPM

flow rate during a one night shutdown

Auxiliary Disinfection System, Regional Water Quality Control Plant- City

of Palo Alto

. Install liquid sodium hypochlorite and sodium bisulfite and associated

equipment including owner furnished tanks and pumps, small diameter

piping, valves, controls and power supply

Illinois Pump Station - West Bay Sanitary District

. Construction of new sewage lift station, including new precast wet

well, concrete valve vault, new 12" PVC gravity line, new pumps,

motors, controls, and emergency generator.

South Bay Water Recycling Program - Reliability Project - City of San Jose

. Installation of 2 new standby power generators and associated

electrical work, installation of new building enclosure including

lighting, overhead crane, restroom facility, and HVAC system, and

installation of new recycled water recirculation line.

District Wide Mechanical Improvements - East Bay Regional Parks District

. Construction of new sewage lift station, replacement of wet well,

pumps, motor control center, valves, and associated piping.

Phase 1 Distribution System Improvements - City of Palo Alto

. Modifications to 5 booster pump station, 4 water reservoirs, and 3

emergency water wells, including repair and reconstruction of existing

system.

December 1995 - August 2003 FedEx, Oakland, CA

Ramp Agent

Education:

. Bachelor of Science in Civil Engineering with an emphasis in Water

Resources, San Jose State, San Jose, CA

. Engineering in Training (EIT), State Board of Professional Engineers,

completed

. Currently preparing to take my Professional Engineering (PE) in Oct

2010

Computer Skills: MS Word, Excel, Outlook, Project, PowerPoint, Adobe

Acrobat



Contact this candidate