LARRY A. TOLER
WATERLOO, IL *****
Qualifications
Offer expertise in the field of process piping, material handling
equipment, structural steel and re-inforced concrete design and detail,
utilizing MicroStation V8 (8.9) XM and Bentley I/RAS B.
September 2006 to January 2009
CH2MHILL on Site at Anheuser Busch
St. Louis Brewery (Contractor)
I was employed as a senior designer in the mechanical section of CH2MHILL
Company Engineering located on site at Anheuser Busch, St. Louis. My work
experience involved piping assemblies, manifolds, and modules for Brewery
Operations Technology. Power
piping to boilers of Biogas (BERS, 70%-90% Methane) and Land Fill Gas with
valve trains. Controlled Environment Warehouse piping refrigeration
systems with refrigerant condensing and evaporator units. Air Handling
Units for office and brewery operation buildings. Scoping projects for
estimating and funding. Plumbing design drawings for brewery operations.
Design of pipe supports with respect to company standards, which includes
seismic pipe supports. About 50% of my work has been in other Anheuser
Busch brewery locations. I have traveled to Jacksonville FL., Houston TX.
Williamsburg VA., and Fairfield CA. I worked with the project mechanical
engineer to collect field data and return to St. Louis to complete the
project design package. Fire Protection Mechanical Equipment Arrangement &
Piping. Other experience includes: P&ID, Photo Drawings & PDF Files. On
11-11-08 I successfully completed an OSHA course in Construction Safety and
Health.
February 2006 to May 2006
American Electric Power
Columbus, OH
Think Resources, Inc. (Contractor)
Assigned to the Civil and Mining Engineering Division in the Structural
Engineering Section as a Structural Designer. Work experience involves
design and detail of access platforms and Monorails. Design and detail of
re-inforced concrete for foundations, slabs, and repair for spalled
concrete.
December 1983 to May 2004
Solutia - Previously Monsanto, Sauget, IL
W. G. Krummrich Plant
H. L. Yoh (Contractor)
Assigned to the Engineering Services Group as a Mechanical Designer. Work
experience involved process piping and Material Handling equipment for
chemical manufacturing. This experience includes; jacketed piping,
insulated piping, lined piping, cast iron piping, plastic piping, and
underground piping, tunneling and trenches. ASME coded vessels, boilers,
reactors, heat exchangers, pumps, conveyors, elevators, and mixers. Also
included in this experience; ISO standards and specifications for loading
docks used for isotainers, tank cars and tank trucks. Duct work and sheet
metal design and detail. Structural design and detail for pipe supports and
equipment. Mechanical and Machine design for dry test equipment. Field
surveying.
January 1990 to March 1990
Anglin Engineering Co. (nights & weekends)
St. Louis, MO
Assigned to work at the construction site for a major brewery upgrade.
Work involved spooling pipe for fabrication and installation. Dimensions
taken from field survey, prime contractor's plans, section elevations, and
scaled model. Field walk thru to incorporate any necessary revisions.
August 1989 to December 1989
Anglin Engineering Co. (nights & weekends)
St. Louis, MO
Assigned to work as Piping Designer on a new pharmaceutical plant project.
Working from P&ID's and structural plans and elevations to install process
equipment and instrumentation for purified water piping and glycol
generation piping.
September 1983 to October 1983
General Dynamics, Electric Boat, Groton, CT
Continental Technical Services, Atlanta, GA (Contractor)
Contractor assigned to Material Arrangement Group as a structural designer
for equipment and miscellaneous structures on a United Kingdom version of a
United States fast attach nuclear submarine. Received confidential
clearance.
May 1983 to July 1983
ACF Industries, Earth City, MO
H. L. Yoh (Contractor)
Contractor assigned as a structural designer on a six to eight week
contract agreement. Work involved design and drafting on the five-car unit
brake arrangement, model 6/5 hitch, and 2600-gallon tank car change system
modifications. Welding assemblies for fabrication.
July 1979 to May 1983
Monsanto/William G. Krummrich Plant, Sauget, IL
H. L. Yoh (Contractor)
Assigned to the Technical Services Department as a Mechanical Drafter.
Reference Solutia assignment Dec. 1983 thru May 2004. Work experience
involved process and utility piping, firewater protection piping,
structural, and material handling for chemical manufacturing. Some of the
projects I worked on were," Burn Hydrogen and Natural Gas in Coal Fired
Boilers". I received Commendation for my work on "Sulphuric Acid Cross
Country Transfer Pipe Line" from my Supervisor, Dec. 1980.
August 1975 to June 1979
National Zinc Co., Bartlesville, OK
Kirk-Mayer Inc (Contractor)
Work experience involved piping for material handling equipment,
(conveyors, ball or
Rod mills for mixing and grinding), for the Zinc process production.
Reinforced concrete design and detail, structural design and detail, HVAC
sheet metal duct work design and detail, civil, surveying, mechanical,
machine, electrical, instrumentation and controls.
February 1974 to July 1975
Industrial Furnace Designers Inc., St. Louis, MO
Process heating equipment for commercial and military use. Sheet metal
weldments and
Assemblies for equipment fabrication. Mechanical, electrical, refractory,
and piping.
November 1972 to February 1974
Marion-Cook Consulting Engineers, St. Charles, MO
Job site engineering representative. Work experience involved site
development layout, grading plans and profiles, cut and fill elevations,
transmission and supply lines, drainage, water mains, storm and sanitary
sewers. Sub-division and light industrial centers, plan and topography,
working from field surveyor notes. Mechanical, electrical, structural and
storm sewer piping.
May 1968 to March 1972
McDonnell-Douglas, St. Louis & St. Charles, MO
Began as detailer, promoted thru four pay grades of draftsman. Received
commendation as lead draftsman on F4 Mobile Test Benches. Electro-
mechanical, sheet metal parts and
Assemblies. Electrical schematics and diagrams, printed circuit boards, and
wiring harness assemblies. Received confidential clearance.
EDUCATION
Linn Technical College, Linn, Missouri
Associate of Technology, Major in Drafting and Design
Honor roll January 68 and May 68
REFERENCES
The following are professional references:
Richard Fleschner Solutia / W.G. Krummrich Plant
Ron Schrenker Solutia / W.G. Krummrich Plant
Drew Cunningham Solutia / W.G. Krummrich Plant
Richard Nelson Solutia/ W.G. Krummrich Plant
(Retired) 618-***-****, home phone
Bill Hoelzer IPM Services at Murphy Mechanical
Contractor
Home Phone 636-***-****
Cell Phone 314-***-****
Robert McFarland Formally with Anheuser-Busch/Inbev
Project Mechanical Engineer
314-***-**** Home Phone
Michael Wellman CH2MHILL Co. Project Manager
314-***-**** Cell Phone
618-***-**** Home Phone