Post Job Free
Sign in

Project Manager Engineer

Location:
Monument, CO, 80132
Posted:
March 18, 2010

Contact this candidate

Resume:

SCOTT R. WERNER

*** **** ****** *** 719-***-**** (h) 719-***-**** (c)

Monument, CO 80132 *****.*.******@*****.***

SUMMARY

Highly motivated, results-driven leader with more than 15 years experience

in Engineering and Operations Management building and maintaining high

performance teams in a high-tech manufacturing environment. Skilled in

planning and directing people, projects and groups to achieve tangible

results including driving lasting performance improvements. Major

strengths include analytical problem solving and decision making along with

team leadership and development. Skills include:

Analytical Problem Collaborative Leadership Factory

Solving Start-up/Expansions

Project Management Vendor & Supplier Capacity Planning

Management

Productivity Microsoft Office Fluent TPM / 5S experience

Improvement

Lean Manufacturing Lean 6 Sigma / DMAIC International Mfg

experience

Process/Equip SPC and Automated Quality Process Simulation and

Engineering Control Control

PROFESSIONAL EXPERIENCE

Photo Stencil, LLC, Colorado 2009 - Present

Springs, CO

Director of Operations

Lead and manage all operations including production management,

engineering, maintenance, procurement and logistics to include all related

functions. Plan, develop and implement tactical and strategic initiatives

to meet organizational performance targets within approved budgets and

timelines. Develop, train, mentor and manage performance of multiple

direct reports (>50% of the company).

. Stabilized production operations resulting in substantially improved

revenue variability (from more than 25% week to week to less than 4% w-w)

while increasing average weekly revenue shipments by over 14% in less

than 6 months.

. Created policies and standardization in business processes for

manufacturing operations, resulting in reduced operator tardiness and

absenteeism.

. Implemented tactical supply chain reviews and process changes resulting

in reduction of production impacts due to materials shortfalls.

. Drove training plans, tactics, and execution resulting in a "no related

findings" in ISO9001 audit.

Intel Corporation, Colorado Springs, 2000 - 2009

CO

Engineering Group Leader 2003 - 2009

Lead high performing teams of 20 to 90 engineers and technicians

responsible for wide variety of processing equipment in multiple functional

areas. Responsible for implementing the vision, staffing, training,

developing employees and managing their performance. Identify and

implement quality, equipment reliability, technician productivity and cost

improvements. Lead and collaborate with cross functional teams.

. Drove coordinated efforts across the factory that reduced defects in the

front end of the line by 34% while reducing the measure rate by 75% and

test wafer usage by more than 50%.

. Led a demo team to complete all work on time with no incidents or

injuries while accommodating a schedule pull-in of nearly 30% (from 7

months to approximately 5 months).

. Developed and managed an annual area budget of over $18M including

monthly/quarterly reconciliation and quarterly/yearly forecasting

including hitting or surpassing all key budget and cost reduction

measures.

. Led Lean manufacturing and Total Productive Maintenance (TPM) area

efforts which resulted in a > 70% reduction in cycle time and a 50%

reduction in die cost across the factory and a 42% increase in tool

capacity across 7 major tool types.

. Led a kaizen that reduced cycle time 28% in one process area and, with

replication, reduced overall line cycle time by over 7%.

. Earned multiple Plant Recognition Awards for Outstanding Area Performance

(sole area to achieve PCS goals, defect reduction results, equipment

performance results).

. Managed the area through a difficult transitional time during which the

factory was being shutdown while maintaining area and factory performance

metrics at record levels.

. Developed and delivered training for a Non-Electrical Hot Work (NEHW)

permitting process that reduced typical turnaround time for a NEHW permit

from >24 hrs to approximately 15 minutes while maintaining safety

standards.

. Earned Divisional Recognition Award for staffing processes and results.

. Promoted twice over 5 years with rankings in top 15% of peers 3 of those

5 years.

Senior Process Engineer 2000 - 2003

Process engineer for 13 tools running various semiconductor fabrication

processes. Sustain the equipment performance on a day-to-day basis,

develop and drive continuous improvement projects, and develop and mentor

the area technicians and junior engineers.

. Completed process improvements that increased capacity by over 50% and

resulted in cost avoidance of more than $3M.

. Volunteered to rescue a floundering project and within 2 weeks produced

results that delivered $360K annual cost savings and then went on to

drive continuous improvement projects resulting in an additional cost

savings of $200K yearly.

. Selected to lead multiple world-wide engineering teams across 4 factories

in 3 different countries that drove more than 30 improvement projects

resulting in a 4% capacity improvement worldwide while reducing commodity

costs by almost 60% and labor content by more than 10%.

SHELDAHL CORPORATION - Longmont, CO 1999 - 2000

Manufacturer of flexible circuit boards and flip chip packaging substrates

in ISO 9001 certified plant with between 50 and 150 employees.

Principle Engineer

Engineering owner for laser equipment used to drill/ablate patterns in

polyimide roll to roll manufacturing line. Develop, optimize and improve

the process, design and develop phase-shift masks (PSM) for new products;

sustain the equipment performance, write technical specifications and

mentor area technicians. Qualified DARPA DUV excimer laser ablation

equipment 2 months ahead of schedule, eliminating the capacity limiter and

generating incremental revenue 1 quarter ahead of expectations.

TEXAS INSTRUMENTS CORPORATION - 1992 - 1999

Dallas, TX, Taiwan, and Italy

Project manager and internal consultant that planned and executed 5

manufacturing line startups, directly accountable for performance of more

than $175M of equipment while meeting aggressive schedules in both

international and domestic locations. Supervised and directed daily tasks

and development of 7 engineers and technicians.

EDUCATION

B.S., Engineering (Mechanical) - Colorado School of Mines, Golden, CO

PROFESSIONAL DEVELOPMENT

Colorado EIT/FE Certification



Contact this candidate