Charles Fordham
**** ********* ***** **********, ***** 76065
678-***-**** ************@*****.***
Manager
Accomplished Leader / Consensus Builder / Process Improvements
Risk Management / Results Driven Success Oriented / Innovative
EXECUTIVE SUMMARY OF ACHIEVEMENTS
Successfully led and managed the design, implementation and cultural change
of a plant with 56 product families and 310 hourly manufacturing personnel
from a large batch manufacturing system to a team based Toyota
Production/Lean Enterprise system.
SELECTED RESULTS: (during a three year period)
> Implementation facilitated sales from $50 million to $100
million
> Productivity increased from a year over year of a minus 6% to a
plus 5%
> On-time delivery performance improved from 20% to 90%
> 73% reduction in work-in-process inventory
Led or facilitated process improvements. Led teams to accomplish the
planning, justification, and implementation of many successful improvement
programs, including plant wide, multi-million dollar projects.
SELECTED RESULT:
> 18% reduction in labor
> 20% reduction in overhead
> 75% reduction in manufacturing flow time
> 34% reduction in required floor space for manufacturing
Project Management Experience:
SELECTED RESULTS:
> Coordinated, directed, and planned $3.5 million project to
upgrade CNC machining and fabrication equipment that
accomplished a 21 month payback.
> Proposed, coordinated, directed, and planned $872K of CNC
machining equipment to accomplish 1 year payback.
> Improved on time delivery of largest supplier from 77% to 95% in
three months by establishing scheduling method for Gardner
Denver Buyer-Planner and training supplier in Lean
Manufacturing.
> Reduced warranty by $100K annually by investigating, testing and
changing the finished product paint, application system, and
Quality Assurance methods.
"This company would not be in the great financial position to make
acquisitions without the improved profitability that your transition in
manufacturing made possible."
Stephen
Crider, CFO
EDUCATION AND CERTIFICATION
Bachelor of Science, Industrial Engineering, Montana State University
PMP Certification from PMI
SME Lean Bronze Certification
Six Sigma Black Belt Certification, Clayton State University
IS0 9000 Internal Auditor Certification, DNV North America
OTHER EDUCATION
Effective Facilitation, The Leadership Strategies Institute
Dale Carnegie Basic and Leadership Courses
Principles of Value Stream Mapping, Kaizen, SMED, One-Piece-Flow, 5S,
Cellular Manufacturing
Root Cause Analysis Training, Made to Order Lean, Creating Continuous Flow,
Toyota Production System
Windows, Excel 2007, Word 2007, PowerPoint 2007, Access, Visio, MS Project
AutoDesk Inventor, AutoDesk AutoCAD
Charles Fordham
Page two
PROFESSIONAL EXPERIENCE
Halliburton Energy Services
Alvarado, TX 2009
Lean Leader
Facilitated cross-functional teams, Kaizen events, problem solving teams
and new product launch teams to implement improvements in CNC machining
manufacturing, shaped explosive manufacturing, and administration.
Implemented lean training programs and facilitated organizational learning.
Queried data in SAP.
Selected Accomplishments:
. Cost saving in the first three months equaled $671,000 and a $550,000
reduction in inventory the next three months.
. Led area teams in developing standard operating procedures from which
production lead time was reduced from 21 days to 4 days.
Gardner Denver
Peachtree City, GA 2003 to 2009
Manufacturing Engineer/Lean Leader
Implemented Lean Enterprise using tools like Value Stream Mapping, Kaizen,
One-Piece Flow, Root Cause Analysis, Administrative Value Stream Mapping,
5S principles, Standardized Work. Facilitated cross-functional teams,
Kaizen events and problem solving teams to implement improvements in
manufacturing and administration. Developed and implemented lean training
programs and facilitated organizational learning. Designed tooling in
AutoDesk Inventor. Program CNC machinery. Established and documented
processes and procedures to meet ISO standards. Maintained and queried
data in SAP.
Industrial Fabricators
Gastonia, NC 2001 to 2003
IT Manager
Supervised and monitored the use of ERP system including costing,
inventory, production, purchasing, etc. Supervised computer system, IT
personnel and contracts. Trained personnel to use computer software.
Selected Accomplishments
. Project manager for selection, purchase and implementation of MAS500
ERP system. Trained Order Entry, Planning, Scheduling, and Purchasing
Personnel in the theory and use of MRP
. Project manager for selection, purchase, planning and implementation of
quoting software. Trained Engineering and Estimators to use the
quoting software.
Production Manager
Managed and Supervised Lead People. Scheduled manufacturing facility
employing 220 people.
Senior Manufacturing Engineer
Developed manufacturing routings. Designed in AutoCAD or specified tooling
and equipment for new products. Identified and implemented solutions for
problems with materials, processes, and tooling for stamping, fabrication,
machining, welding, and assembly. Trained people in the safe, efficient,
and correct operation of new equipment. Established and documented
processes and procedures to meet ISO and QS standards.
Woods Equipment Company
Charlotte, NC 2000 to 2001
Oregon, IL 1986 to 1999
Manufacturing Engineering Manager/Lean Manager
Supervised the Industrial Engineering, Manufacturing Engineering, Facility
Engineering, Maintenance, Tooling and CNC Machine Programming Functions.
Developed and managed departmental budgets. Led, coordinated, directed,
and planned manufacturing process design and continuous improvement.
Coordinated activity between Manufacturing and Product Design Engineers for
Value Analysis and Value Engineering functions. Managed Kaizen program and
championed Six Sigma projects.