William
F. Ney
** ********* ****** *********, ** 06795 Cell 203-***-****
Home 860-***-**** *******-***@***.***
Procurement
Specialist
Qualifications
High potential and committed procurement professional with experience in:
MRP Systems Sustaining and new product procurement
Planning/Master Scheduling
New Supplier qualification Sourcing
Inventory optimization
Education
UNIVERSITY OF PHOENIX (classroom) M.B.A
SOUTHERN CONNECTICUT STATE UNIVERSITY: M.S. Statistics, B.A. Sociology
APICS: JIT, Production Activity Control and MRP Cullinet, SAP, PRMS and
ASKMAN MRP experience.
Transferable Skills
. Extensive and diverse supply chain knowledge and experience.
. Flexible, resourceful and accountable team or individual contributor.
. Persistent and committed problem solver.
. Openness to new ideas, challenges and responsibilities.
. Self motivated, sincere and reliable.
. Good natured, diplomatic and easily relates to people at all levels.
Employment
BERGQUIST TORRINGTON COMPANY; Torrington, CT
Manufacturer of Advanced Flow systems for medical, computer and other
commercial applications.
www.bergquisttorrington.com
Senior Sourcing Engineer
10/2008 to 2/2009
. Identified suppliers for new production and capacity increases.
. Directed, managed and supported Sourcing Engineer in Shenzhen, China.
. Faciliated bi weekly conference calls with Chinese suppliers to
maintain continuity of supply.
Reason for leaving: Production shutdown/layoff due to loss of sales.
FUELCELL ENERGY INC., Danbury, CT
Leading manufacturer of clean energy efficient power generation plants for
commercial and industrial customers. www.fuelcellenergy.com
Project Procurement Specialist
11/2006 to 10/ 2008
. Purchased mechanical valves, enclosures, electronic and mechanical
components for BOP power plant assembly using PRMS computerized system.
. Maintained and optimized component availability at 2 assembly facilities.
. Eliminated supplier delivery and manufacturability issues through
investigation, functional team input and follow up.
LACEY MANUFACTURING CO. INC., Bridgeport, CT
1/ 2003 to 11/2006
ISO-9001: 2000, FDA registered integrated Medical contract manufacturer
with approximately $65M in annual sales.
www.laceymfg.com
Senior Development Production Control Planner / Buyer
. Procured components and oversaw medical device end production utilizing a
SAP MRP system.
. Maintained optimal inventory levels through strategic planning,
scheduling analysis and implementation.
. Planned and directed production to meet customer requirements.
LINVATEC CORPORATION DIV. OF CONMED CORP., Largo, FL 1/1999 to
12/2002
ISO-9001: 2000 leading medical device manufacturer with approximately $200M
in international annual sales of: least invasive/arthroscopy instruments
and power surgical instruments. www.linvatec.com CNMD (NASDAQ)
Consultant (September 2002 to December 2002)
. Consulted on new product development sourcing strategies and purchasing
cost standard implementation.
. Trained replacement Commodity Analysts.
. Managed critical new technology suppliers with uninterrupted material
flow.
. Negotiated new facility service contracts.
Commodity Analyst (January 1999 to September 2002)
. Analyzed and incorporated sourcing strategies for new product release,
new technologies, electronic component obsolescence and sustaining
product enhancements utilizing ASK MAN / MAN to strategically manage
supply chain and finished goods inventories.
. Established a reliable and cost effective supplier base to ensure new
product availability, innovation, cost reductions and market
competitiveness.
. Qualified First Article components and new sources of supply for: tight
tolerance machined metal / ceramic parts, motors / gear assemblies,
injection molded components, PCB and cable assemblies, electronics, multi
language manuals and custom hardware.
. Resolved quality, manufacturability, accounts payable, purchasing and
supply chain issues through analysis, negotiation, and timely
implementation.
. Built cross-functional teams based on teamwork and supplier
participation, which resulted in design enhancements, manufacturability
improvements and cost reductions.
Accomplishments:
. Principal purchasing agent for the company's highest priority battery
hand piece project released in a shorter cycle time than any other major
project.
. Negotiated supplier pricing, delivery performance and inventory stocking
agreements assuring aggressive schedule commitment and 20% reduction in
target cost.
. Streamlined quoted supplier lead times for critical new custom components
by up to 50% without incentive negotiations.
. Managed over $3M in annual new product component inventory assuring early
product release, optimal inventory level and scheduling replenishment for
forecasted demand.
. Attained, approved and managed new technology sources enhancing company's
capability and market presence.
. Instituted an effective and timely telecommunication-purchasing site in
CT.
TECMAR TECHNOLOGIES, Rexon Tape Data storage Longmont, CO
2/1998 to 7/1998 Buyer / Contract Position
. Procured electronic components timed to meet overseas tape drive
production requirements.
. Updated system component lead times, safety stocks, and other static data
in order to assure supply continuity.
VALLEYLAB INC. DIVISION OF PFIZER, Boulder, CO
1987 to 1998
ISO-9002 Global medical manufacturer of electrosurgical pencils,
generators, and return electrode pads.
Production Planner (1996 to 1998)
. Developed and implemented Master Production Schedule to meet forecasted
medical device demand.
. Managed $90M in finished goods inventory with a significant monthly and
year end product back order reductions.
. Improved BOM accuracy and eliminated significant unfavorable material
usage variances.
. Planned and scheduled high volume production in both continuous flow and
work order environments.
Materials Production Team Leader (1987 to 1996)
. Ordered/purchased materials and maintained a smooth controlled process
flow for 230,000 units per week.
. Supervised, trained, and conducted annual performance reviews for 5
warehouse senior distributors.
. Instituted and executed systematic cycle count audit, component receipt
verification, and allocation programs.
. Optimized component availability, reduced warehouse storage space and
increased overall efficiency/productivity.
Accomplishments:
. Improved raw materials inventory accuracy by developing a systematic
cycle counting program. Result:
Eliminated production downtime due to component shortages and increased
inventory accuracy to over 95%.
. Increased product availability by utilizing A Mix Model Production
Schedule building more frequently in smaller lots. Result: Reduced end
product backorders by 50%.
. Scheduled most effective production lot sizes by analyzing demand, labor,
and machine efficiencies. Result: Increased
productivity and reduced daily machine setup time by 10%.
. Evaluated/resolved obstacles to MRP II implementation by surveying
production control and management employees. Result: Presented effective
MRP II integration strategy to management.
Personal Interests: Endurance running, challenging physical conditioning
and outdoor activities.