David R. Johnson
Weldon, IL ****2
Phone 217-***-****
EMPLOYMENT OBJECTIVE
A challenging management position where my experience, education and
accomplishments will contribute to the success of your organization.
EDUCATION
2004-2006 DeVry University,
Chicago, IL / St. Louis, MO
Bachelor of Science in Technical Management
1986-1988 Parkland College,
Champaign IL
Micro Precision Technology
WORK EXPERIENCE
Action Technology, Clinton Illinois 07 /07 to 10/09
Manufacturer of small plastic extruded tubing and solid extruded profiles,
Supplied Food and Medical Industries. 100 employees
Plant Manager 07/07 to 10/09
. Responsible for all of the high speed manufacturing, assembly,
shipping and receiving departments in a plant of 100 employees. Total
daily extrusion output of 150,000,000 units, over seventeen extrusion
lines . Manage's compliance to GMP Regulations.
. Directs the Maintenance Manager and all Department Managers in all
areas of manufacturing, training, process engineering, process
improvement, lean manufacturing principles and quality control.
. Support the company Safety Director to ensure compliance with safety
rules, promote safety awareness and development of safety programs.
. Lead the effort to define new processes and facilities necessary to
support continuous quality improvement, operational improvement, and
business growth. Managed over $1,000,000 in capital spending annually
. Develop and execute a documented continuing improvement program for each
department, with particular attention to scrap reduction, safety, quality
and cost/efficiency.
. Prepare an annual budget for each department, listing operating and
capital expenses.
. Maintain and monitor accurate records for all departments regarding the
quarterly safety program.
. Assess, rate, and document the performance of all supervisory personnel.
. Direct the supervisory personnel in the assessment, rating, and
performance of all support personnel.
. Monitor the supervision, training, and discipline of all operations
personnel in accordance with Action Technology's policies and procedures
policies.
. Developed all target production scrap levels. Worked with Production
Dept., Quality Dept., Process Engineering and Maintenance Dept to reduce
production scrap from 26% to 8% in less than two years.
. Developed and implemented all systems to track daily, weekly and monthly
production and scrap. Also worked with the Quality Dept. to develop
methods to identify sources of scrap and methods to reduce or eliminate
these sources.
. Directly managed the MRO and Maintenance purchasing departments. The MRO
annual purchasing budget is $3.0 million while consistently staying 25%
below the monthly spending level by actively seeking lower cost suppliers
of MRO and Maintenance goods and machine components.
. Worked closely with all departments to further develop and maintain
Action Technology's ISO 9000 system and certification program.
Pittsburgh Pipe, St. Louis Missouri 01/07 to 07/07
Manufacturer of large and medium diameter steel pipe, 50 employees
Operations Manager 01/07 to 07/07
. Responsible for safely and efficiently operating and maintaining
Pittsburgh Pipe's yard/fabrication facility and roll shop, and for
maintaining the company's office building.
. Directs the Facilities Maintenance Manager and all supervisory
personnel at the yard/fabrication facility and roll shop, and the
traffic department.
. Support the company Safety Director to ensure compliance with safety
rules, promote safety awareness and development of safety programs.
. Lead the effort to define new processes and facilities necessary to
support continuous quality improvement, operational improvement, and
business growth.
. Develop and execute a documented continuing improvement program for each
facility, with particular attention to safety, quality and
cost/efficiency.
. Work with the facilities maintenance manager to establish equipment
maintenance procedures for all operations department and office building
equipment, including perpetual documentation of all procedures.
. Prepare a separate annual budget for each facility, listing operating and
capital expenses.
. Effectively maintain an inventory (including back-up) of all supplies
necessary to operate all facilities.
. Work with yard/fabrication facility and roll shop supervisory personnel
to develop and maintain records of production, productivity and equipment
utilization.
. Maintain and monitor accurate records for both facilities regarding the
quarterly safety program.
. Assess, rate, and document the performance of all supervisory personnel.
. Direct the supervisory personnel in the assessment, rating, and
performance of all support personnel.
. Monitor the supervision, training, and discipline of all operations
personnel in accordance with Pittsburgh Pipe's policies and procedures
manual.
. Developed all target production and scrap levels.
. Developed and implemented all systems to track daily, weekly and monthly
production and scrap.
. Completely revised the hourly employee handbook to better communicate
company policies and procedures.
. Created a yard layout using a computer aided design system. Layout
resulted in a more organized inventory of raw and finished good. The
efficacy of retrieving raw material and locating finished goods doubled.
. Developed a Kanban pull inventory system for raw and finished goods. This
system resulted in a 25% reduction of raw material inventory valued at
$1.5 million, and a 98% on time delivery of finished goods to the
customer.
Brake Parts Inc., Litchfield Illinois 3/95 to 01/07
Manufacturer of automotive brake components, 350 employees.
Manufacturing Manager 6/05 to 01/07
. Responsible for all of the manufacturing, assembly, shipping and
receiving departments in a plant of 350 employees. Total daily
machining output of 28,000 units, assembly output of 24,000 units and
daily shipping output to distribution centers of $500,000.
. Directly supervise all machining and plastic injection molding
production, shipping and receiving supervisors. Also directly
supervise the Tool and Die and MRO purchasing departments. The MRO
annual purchasing budget is $3.0 million while consistently staying
25% below the monthly spending level by actively seeking lower cost
suppliers of MRO goods and machine components.
. Plan annual production and staffing needs. Plan annual budgetary needs
to support production.
. Work closely with the Materials, Engineering and Accounting
departments to manage production schedules, new product release and
product costing.
. Work with the Human Resource department to manage and develop company
policies, health and safety programs.
. Supported QS9000 (TS 16949) Quality System.
. Develop capital spending projects for machine and building
maintenance.
. Transferred rotor manufacturing lines consisting of ten machining
cells and five assembly cells from two Brake Parts locations into the
Litchfield IL location.
Brake Parts Inc., Litchfield Illinois Continued
Facility Service Manager 4/98 to 6/05
. Managed all of the support and service departments with an annual
budget of $2.6 million. Consistently stayed 25% below the monthly
budget by actively seeking lower cost suppliers of MRO goods and
machine components.
. Departments managed are as follows: Maintenance, Tool and Die, Tool
Grinding, Tool Stores and MRO Purchasing, Janitorial and Guards.
. Supervised and trained 2 direct report supervisors and 40 hourly
employees.
. Implemented a spare parts storeroom for equipment repairs resulting in
a 30% increase in machine utilization throughout the plant.
. Introduced a maintenance work order tracking system that has improved
work order turn around time of 4 days to 1-2 days. This system allows
tracking of; down time cause, repair parts used and have been
instrumental in developing an improved preventive maintenance program
for key equipment.
. Spearheaded the TPM (Total Productive Maintenance) program at the
plant level and participated on a corporate level Best Practices TPM
team.
. Project leader to identify, purchase and install a new phone switch
and voice mail system and desktop computer faxing system that included
over 150 lines. Also included training and administration of system.
This project has improved the communication ability of the plant by
upgrading from an antiquated system to a leading edge computer based
technology system while staying $15,000 under an $80,000 budget.
. Implemented a state of Illinois sanctioned apprentice program in the
Maintenance and Tool and Die departments.
. Created and maintained PM programs for all plastic injection molding
equipment, machining equipment and assembly equipment.
. Work closely with the Human Resource department to manage and develop
company policies, health and safety programs.
. Supported QS9000 (TS 16949) Quality System.
. Participated in Six Sigma projects.
. Worked closely with customers and sales to build customer confidence
and increase sales.
Brake Parts Inc., Litchfield Illinois Continued
Manufacturing and Industrial Engineering Supervisor 7/96 to 4/98
. Responsible for all engineering and environmental activities within
the facility.
. Supervised, trained and developed 9 manufacturing and industrial
engineers.
. Implemented a wastewater evaporator system that resulted in a 90%
reduction of wastewater and a $270,000 annual savings.
. Equipment and machinery purchasing. Annual budget of $2.5 million.
. Continued to Support the daily plastic injection molding operation
which included working closely with the department supervisor,
operators, and Tool and Die Department to keep production running
smoothly.
. Supported QS9000 (TS 16949) Quality System.
. Developed health and safety programs for all existing and new
manufacturing and assembly processes.
Brake Parts Inc., Litchfield Illinois Continued
Senior Manufacturing Engineer 3/95 to 7/96
. Responsible for CNC programming of machine tools, CAD/CAM operation,
fixture design, tool design and process design.
. Worked with machine operators to solve problems and improve processes.
Introduced the use of carbide inserted cutting tools into the
machining processes thereby doubling and sometimes tripling the speeds
and feeds of theses operations. These improvements reduced part costs
significantly
. Headed up a project to bring an existing plastic injection molding
operation producing brake fluid reservoirs, caps, floats, and other
plastic components related to the brake industry into the facility.
Responsibilities included learning the operation of the equipment,
coordinating the equipment move and setup at our plant. Trained
employees in the equipment operation and production of a quality
product.
. Supported the daily plastic injection molding operation which included
working closely with the department supervisor, operators, and Tool
and Die Department to keep production running smoothly.
. Responsible for all environmental reporting and monitoring.
. Team member implementing QS9000 (TS 16949) Quality System.
. Headed up the successful implementation of the ISO 14000 environmental
system.
. Supported equipment and machinery purchasing.
. Developed all Safety Lockout/Tagout processes for existing and new
equipment. Worked closely with the Maintenance department to implement
Lockout/Tagout program throughout the plant.
FMC Corporation, Hoopeston Illinois 3/89 to 3/95
Manufacturer of canning and harvesting equipment, 450 employees.
Manufacturing Engineer
. Responsible for CNC programming of machine tools, CAD/CAM operation,
fixture design, tool design and process design.
. Worked with machine operators to solve problems and improve processes.
Introduced the carbide inserted drilling tooling, carbide inserted
machining tooling and through the spindle coolant drilling. These
changes decreased machining time and part cost and improved tool life.
. Involved with equipment and machinery purchasing.
Venture Precision Machining, Champaign Illinois 4/88 to 3/89
Manufacturer of various machined parts, 50 employees.
Manufacturing Engineer
. Responsible for CNC programming of machine tools, CADCAM operation,
fixture design, tool design and process design.
. Provided assistance working with machine operators to solve problems
and improve processes.
Continuing Education
. Federal Hazardous/Toxic Waste Regulations
. Team Leadership
. Statistical Process Control, SPC
. Leadership Academy
. Ergonomics
. Total Productive Maintenance, TPM
References Furnished upon request
Email: *********@*****.***