Post Job Free
Sign in

Electrical Engineer Project

Location:
Clearwater, FL, 33579
Posted:
March 30, 2010

Contact this candidate

Resume:

Mazen Elajouz, MBA

***** ****** ******* ***** . *********, FL 33579 . 813-***-**** .

*************@*****.***

QUALIFICATION SUMMARY

> Talented and accomplished Project Engineer with proven ability to

successfully direct and lead a team of engineers, support manufacturing

operations, and present business cases to senior management and

customers.

> 7+ years experience designing, engineering and operating cost-effective

power supplies and controllers for aerospace (fixed and rotary wing

aircraft) and military applications.

> Expert in the design and delivery of customer focused solutions using

state of the art technology.

> Uniquely skilled in all phases of product life cycle management, from the

initial feasibility analysis and conceptual design through production

rollout and sustainability.

> Highly effective in preparing capital budgeting and business plans for

the company.

> Effective at managing projects and resources to maximize company's cash

flows and profitability.

> Experience with leading enterprise-wide implementations.

> Effective at identifying and pursuing new business strategies and

opportunities.

> Experience in preparing marketing brochures and datasheets.

EDUCATION

University of South Florida, Tampa, Florida.

Master of Business Administration. Aug. 2007 -

Aug. 2009

> Concentration: Finance and Management.

Master of Science, Electrical Engineering. Aug. 2004 -

Dec. 2006

> Minor: Engineering Management.

Bachelor of Science, Electrical Engineering. May 2000 -

May 2004.

PROFESSIONAL EXPERIENCE

Telecommunication Systems Inc., Tampa, FL Oct. 2008 -

Current

Electrical Design Engineer

> Establish and implement project development processes based on a phase

gate system.

> Conduct detailed design reviews.

> Coordinate the work and provide technical leadership to junior

engineers and technicians.

> Analyze, develop, and implement solutions to improve the efficiency of

existing hardware products and/or resolve problems.

> Develop, implement, and conduct manufacturing, qualification, and

acceptance test procedures which demonstrate all applicable

specifications.

> Drive cost improvement measures through product and process

improvements to reduce time to test by 40%.

> Prepare statements of work and compliance matrices.

HEICO Aerospace, Sarasota, FL July 2004 -

Oct. 2008

Project Engineer

> Lead technical project representative on all seating products and

recorder backup power supplies.

> Provided departmental guidance for all program initiatives and

standards.

> Review and evaluate information package, including all typical

supplier document requirement list (SDRL), for internal and external

design reviews.

> Evaluated staffing and resource needs based on current and future

projects.

> Prepared and performed on-site training and testing at customers'

locations.

> Coordinated system integration tests and qualifications.

> Met operational budgets and schedules.

> Led formal design reviews to facilitate release to production.

> Supported Sales & Marketing in creating strategic initiatives for

growth and market penetration.

> Successful design and production launch of the Recorder Independent

Power Supply for Boeing's 787 Dreamliner and Sikorsky's CH-148

Cyclone.

Electrical Engineer

> Interacted with clients on a routine basis to provide project updates

and the integration of products into potential new programs.

> Applied design for manufacturability and continuous process

improvements.

> Designed supporting equipment for testing and simulation.

> Developed manufacturing, qualification, and acceptance test

procedures.

> Interacted with external vendor and suppliers for integration of new

designs into existing products.

> Directed and trained test technicians and assemblers on new products.

> Performed reliability analyses, failure modes and effects analyses,

and system safety analyses.

> Performed electromagnetic interference and environmental testing per

U.S. commercial RTCA-DO-160 and Boeing standards, along with military

standards (MIL-STD 810F, MIL-STD 461F, & MIL-STD 704F).

Bausch & Lomb Pharmaceuticals, Tampa, FL May 2003 -

May 2004

Electrical Engineer

> Reduced machine downtime by 38% through equipment monitoring and

improved scheduled maintenance.

> Worked with a team of engineers to provide solutions to increase

production and reduce operating costs.

> Served on the Overall Equipment Efficiency (OEE) team.

> Developed a new database to improve product tracking and data

retrieval.

> Configured Allen Bradley software for data collection and report

generation.

> Participated in the automation of packaging line.

> Documented all phases of the project and updated electrical drawings.

TECHNICAL SKILLS

Software

> ERP Systems: SAP . Deltek Costpoint . Symix

> MS Office Suite . MS Visio . MS Project . Sharepoint

> CAD Software: Orcad . Altium . Autocad . SolidWorks

> Programming & Test Software: C Compiler . LabView

References Available Upon Request



Contact this candidate