Post Job Free
Sign in

Project Manager

Location:
Spring, TX, 77386
Posted:
August 15, 2010

Contact this candidate

Resume:

Benjamin Paul Gwaltney

**** *** ******* ***** *****, Spring, Texas 77386

Email: **********@*****.***

Cell Phone: 337-***-****

STRENGTHS

Quality-driven professional with over 25 years of experience in Industrial

Services; eighteen of those with Zachry Industrial Inc. Willing to travel

and relocate as necessary. Proactive leader while maintaining a positive,

safe, and productive work environment.

PROFESSIONAL EXPERIENCE

Zachry Industrial, Inc.

Site Superintendent / Radford, VA 8/09 - 2/10

I supervised the construction of an Acid Neutralization Plant at the Army

Ammunition Plant. The job consisted of pouring concrete floors and curbs,

sloped to drain to the stainless steel trenches that we installed to

capture any acid spills/leaks that could occur. I managed a crew of Zachry

employees as well as Pipe, Concrete, Coating, and Electrical subcontractors

during the performance of this project. During this project, I took care

of payroll issues, day-to-day problems, and handled all paperwork

concerning quality documents. Reviewed applicants and interviewed

potential employees along with selecting and approving qualified applicants

for hire. I did all the hiring, dismissal, and reprimands as needed during

the course of this project.

Zachry Industrial, Inc.

Site Superintendent / Durham, NC 2/09 - 8/09

We constructed a series of piers and footings for a 2 story 101,000 square

foot structural steel building and processed waste sump pit at ground level

and poured the second floor after steel was erected. My duties were to

procure necessary tools and equipment to perform the job, review resumes,

interview potential employees along with selecting qualified applicants for

hire, manage the jobsite and the people, and insure the client of a safe

and productive completion of this project.

Zachry Industrial, Inc.

Civil Superintendent / Cope, SC 6/07 - 2/09

Constructed an SCR unit with a new Ammonia Unloading station as well as

installed larger ID fan motors and fans. We demoed and installed new

ductwork to accommodate the SCR and ID fans. I worked with the Project

Manager in the setup of the personnel office, site office complex, early

procurements, scheduling, and coordination. I accepted the role as the

Turnover Coordinator as we progressed through the rollover to the plant

personnel and client representatives. In the absence of the Project

Manager, I completed the demobilization and closeout of the project. I set

up and managed the personnel office for the first two months by taking

applications, guiding potential employees through the hiring process in

addition to evaluating each one for future employment to insure the most

qualified personnel were hired.

Zachry Industrial, Inc.

Civil Superintendent / Deer Park, TX 6/06 - 5/07

We constructed a Steam Turbine Tabletop, Cooling Tower expansion and

installed 2,000 LF of 30" - 42" cooling water piping. I oversaw the

purchasing of materials and supplies needed to construct this project. I

met weekly with the Engineers to coordinate and discuss problems and design

changes as well as schedule updates or changes. I coordinated with

subcontractors on auger cast piles, bellbottom drilled piers, and rebar

design, delivery and/or changes as needed. In charge of hiring, training,

and evaluating staff.

Zachry Industrial, Inc.

Project Facilitator / Hallsville, TX 01/06 -

6/06

We were contracted to demo and reconstruct some structural steel and

ductwork during the outage in addition to adding handrails, grating, and

additional lighting around the Ball Mill foundation that we were contracted

to install post outage. I was hired to assist in the management of a lump

sum contract. I assisted the Project Manager in his duties which included

subcontracts, engineering changes, schedules, cost, change orders, and

document control. I worked closely with the scheduler to construct a good

schedule and cost tracking system during pre-outage activities. I was then

asked to take over site management throughout the remainder of the contract

in addition taking over the scheduling and cost reporting after the

untimely release of my scheduler. I worked closely with the client

representative on extra work and several change orders until the completion

of the project. Reviewed applicants and interviewed potential employees

along with selecting and approving qualified applicants for hire.

Zachry Industrial, Inc.

Civil Superintendent / LaPorte, TX 9/05 - 10/05

I was the Reinforced Ironworker Instructor at the training center in Deer

Park, Texas instructing personnel on how to place and tie rebar before

their deployment to Beijing, China. I also instructed them on the safety

and coordination required to perform the duties of a reinforced ironworker

and Zachry's expectations on safety as well as the importance of working

safely.

Zachry Industrial, Inc.

Project Scheduler / Civil Superintendent / Eastover, SC 5/05 - 8/05

We were constructing a Closed Cycle Cooling System, which consisted of two

Cooling Towers, underground 60" & 96" concrete lined circulating water

piping, and associated structures to support the system. Originally I was

the Project Scheduler and Civil Facilitator before being assigned to the

Superintendent position. I performed material and quantity takeoffs,

requisitioned materials and scheduled activities for my craft and

interfaced with other crafts. I maintained spreadsheets to track and

manage my personnel and activities. Reviewed applicants and interviewed

potential employees along with selecting and approving qualified applicants

for hire.

Zachry Industrial, Inc.

Project Controls Representative / San Antonio, TX 8-04 / 8/05

I was stationed at the home office taking training on the latest software

P3 and CMIS. I assisted in the development of EPC procedures for future

use in the Power Division. I was training other new employees how to do

takeoffs and maintain spreadsheets for several Highway Projects throughout

Texas.

Zachry Industrial, Inc.

Civil Facilitator / Indiantown, FL 5/03 -

8/04

We constructed (four) Gas Fired combined cycle units along with a Steam

Turbine and (22) Cell Cooling Tower. My duties were to do material

takeoffs, schedule activities, requisition materials and deliveries as well

as progress activities with Qtrax quantity tracking system weekly. I

assisted the Superintendent in the management of field activities, budgets,

and scheduling. I directly managed the contract dealing with the erection

of the Cooling Tower structure by GEA. Reviewed applicants and interviewed

potential employees along with selecting and approving qualified applicants

for hire.

REFERENCES

Steve Oler - HR Director S& H Engineers 979-***-****

Johnny Fry - Technical Recruiter FN Dyncorp International

512-***-****

Buddy Myers - Project Director Zachry Industrial Inc.

210-***-****

EDUCATION

1981 - 1982 Southside VA Community College Keysville, VA

1980 - 1981 Bluefield College Bluefield, VA

TRAINING

2009

. Emergency Response

. CPR/First Aid

. Blood Borne Pathogens

. Project Cost Management

. Human Resource Management

. Ethics

2008

. World of Concrete Seminar

. NCCER-Carpentry, Rebar, Concrete, Heavy Equipment and Scaffold

Building

. Rightful Termination

. ECC Mod-Laws

. Waste Issues

. Storage

. Ethics Policy

. EEO/FMLA/DRP/Sexual Harassment

2007

. Corporate Compliance Program

. Primavera P3/601

. Competent Person Training

. Houston Safety Council

. Fire Extinguisher

. ZLC-Methods and Meetings

. Cyanide Protocol

2006

. NCCER-Field Safety

. Safety Council Orientation

2005

. Oracle Cost Training

. 2720401 Foundations

. CMIS-JCBasic-IV

. Soil Mechanics

. Primavera 601

. Trenching/Excavation

. EPC Optimization

. OSHA-10, Subcontract - Non Procurement

2004

. Turnover and Startup

. OSHA-10

. Supervisor and Salary Orientation

. Vendor Management

. NEO Supervisor Training

. Rigging Safety

. Improvement Training

. QTRAX-Web

. Lockout/Tagout

. Fall Protection

. CMIS Basic I,II,III,

. WBT Navigation,

. EEO Compliance

2003

. Expedition 202A

2002

. Dispute resolution

. HRSG Major Components Construction Supervision

. Crane Safety

2001

. Contract Administration

. PDP Vendor Management

. Team Building



Contact this candidate