Post Job Free
Sign in

Project Manager Quality Control

Location:
Marshall, VA, 20115
Posted:
March 09, 2010

Contact this candidate

Resume:

CHRISTOPHER DELOSH

**** ******* ******

Marshall, VA 20115

540-***-****

ablytk@r.postjobfree.com

SUMMARY: CONSTRUCTION SUPERINTENDENT WITH OVER 20 YEARS EXPERIENCE IN

GOVERNMENT, HEALTHCARE, COMMERCIAL AND INTERNATIONAL

PROJECTS

QUALIFICATIONS: * An education and a proven background in building

construction, specializing in multi-million

dollar healthcare and government projects for over 20

years

* Established ability working internationally

* Proven experience in planning and scheduling

* Strong management and motivational abilities

* Strong mechanical abilities

* Demonstrated competency in interfacing with Owners,

Project Manager, and Office Engineers

EXPERIENCE

Jan. 2005-August 2009 MANHATTAN CONSTRUCTION, Falls Church, VA -

Superintendent

NASA Space Exploration Building, Greenbelt, MD (Jan. 2009 to

Present): $45M three story office/laboratory building

including laboratories that were constructed to a Level 4

clean room rating.

* Authorize all subcontractors pay applications.

* Conduct daily inspections and review of entire

jobsite with NASA's architectural and MEP

representatives.

* Conduct in-wall inspections, hard ceiling

inspections, prefinish inspections,

ceiling inspections as well as final inspections.

* Oversee all finish work, including ceilings,

flooring, casework and all MEP trim-out.

* Ensure that the contractors complete work to

specifications and are on-time.

Riffort Renaissance Resort, Curacao, Lesser Antilles (July 2007-Jan.

2009): $46M, 10 acre resort with 4 story hotel (250,000 sq

ft), 240 guest rooms, dining, casino and retail space, 5

story garage with multi screen cinema and retail space and

manmade tropical fresh and saltwater infinity pools.

* Primarily responsible for bringing the main hotel

from concrete structure to completion. Oversaw all

facets of hotel construction.

* Interfaced with customs on an as needed basis to ensure that

all construction materials were on

jobsite when required.

* Responsible for updating schedule each week with an

outside consultant to ensure proper documentation.

* Participated in owner and subcontractor meetings.

* Forecast work in-place projections.

The Vistas on the James Condominium Complex, Richmond, VA (April 2007-

July 2007): $36M, 350,000 sq ft luxury condominium project

located on the historic James River in Richmond, VA with 12

levels of residential condominiums, 5 levels of garage

space, a fitness center, and retail space located in

downtown Richmond.

* Authorize all subcontractors pay applications

* Conducted in-wall inspections, hard ceiling

inspections, prefinish inspections,

ceiling inspections as well as final inspections.

* Oversaw all finish work, including ceilings,

flooring, casework and all MEP trim-out.

* Ensured that the contractors completed work to

specifications and were on-time.

U.S Capitol Building, Capitol Visitor's Center, Washington

DC (Jan.2005-April 2007): $600M Project encompassing a new

Capitol Visitor's Center requiring a 750 foot utility

tunnel for which I had sole responsibility.

* Relocate major utility lines under 100 year old

streets, connecting the US Capitol, US Supreme

Court, etc. and integrate them into existing utility

lines in preparation of the new Capitol Visitor's

Center. Many of the old lines were not on existing

blueprints:

. 36" water mains (Required coordination with

WASA)

. 24" gas lines

. Verizon Cable telephone and communication lines

. Fire Hydrant Installation (Required

coordination with the Architect of the Capital

(AOC) Fire Marshall)

* This included:

. New site utility work, including, but not

limited to, connecting the main fire alarm

system and water source to the Capitol

Visitor's Building.

. Excavation

. Setting Pilings and lagging

. Coordinating work with the Architect of the

Capital (AOC), Supreme Court, Library of

Congress and Capitol Police including, but not

limited to, designing new car traffic patterns

and pedestrian traffic flows.

May 2004 - Jan. 2005 TURNER CONSTRUCTION, Arlington, VA, Project

Superintendent

INOVA Fair Oaks Hospital, Falls Church, VA - 5 story

hospital complex renovation.

* Managed all of the remodel construction, scheduling

and paperwork of this project.

* Authorized all subcontractors pay applications

* Updated schedule weekly

* Chaired all owners meetings

* Forecast work in-place projections

* Managed the assistant superintendent and the office

engineer as well as coordinated with a

superintendent from a joint venture

* Communicated daily with hospital staff and their

engineering departments, communicating work

schedules, shut-downs, overnight work, etc.

Dec. 1999 - April 2004 CENTEX-RODGERS, Nashville, TN - Superintendent

Reston Hospital and Arlington Hospital, VA (April 2003-

April 2004): Responsible for the quality control facet of

these new build projects. Regularly oversaw all contractor

work ensuring that state and local codes were met as well

as ensuring that the work met or exceeded Centex-Rodgers

high expectations. This included:

* Created a recovery schedule for a project that was

not meeting the end-date for the hospital.

* Conducted in-wall inspections, hard ceiling

inspections, prefinish inspections, ceiling

inspections as well as final inspections.

* Oversaw all finish work, including ceilings,

flooring, casework and all MEP trim-out.

* Ensured that the contractors completed work to

specifications and were on-time.

Gonda Building, Mayo Medical Center, Rochester, MN (July 2000-April

2003): Responsible for the quality control portion of this

$300+ million dollar project. Regularly oversaw all

contractor work ensuring state and local codes were met as

well as ensuring that the work met or exceeded Centex-

Rodgers expectations. This included:

* In-wall inspections, hard ceiling inspections,

prefinish inspections, ceiling

inspections, as well as final inspections.

* Regularly met with city building inspector to review

work and obtain TCO.

* Oversaw the building of all of the major equipment

rooms in the Gonda building including MRI,

CatScan and angiography. Scheduled all work and

installation of equipment requiring interfacing with

Mayo and equipment representatives ensuring that work

was completed according to specifications and that

all deadlines were met.

* Led the Safety Committee which entailed weekly walks

through the job site, noting any

potentially hazardous work conditions, noting them,

and then followed-up to ensure compliance.

Compiled and disseminated weekly report of any

violations.

* Mentored interns and new assistant superintendents

to instruct them in the methods and

procedures used on this job site. Oversaw the work

performed by other assistant superintendents.

* Oversaw the clerical assistant, delegating tasks and

follow-up to ensure completion

Worcester Medical Center, Worcester, MA (Dec. 1999-July

2000): $250M, 700,000 square foot medical facility.

* Oversaw all subcontractors ensuring that all work was done

properly and on schedule

* Responsible for inspection and follow-up of all

punchlist items to ensure a completion date three

months ahead of schedule

PREVIOUS

EXPERIENCE:

1991 - 1999 BRIGHAM & WOMEN'S HOSPITAL, Boston, MA - Carpenter

1986-1997 DELOSH ACCOUSTICAL CEILING & DRYWALL, INC. West Bridgewater,

MA - Owner/Project Manager

8/84 - 12/86 P&D CONTRACTORS, Allston, MA - Carpenter - With scope of

work specifically within the Brigham and Women's Hospital

3/90 - 9/91 Union Carpenter

EDUCATION: Wentworth Institute of Technology

CERTIFICATIONS: US Army COE CQM

Major: Construction Project Management

OSHA 30 Hour

Bachelor of Science Degree

CPR/First Aid



Contact this candidate