Post Job Free
Sign in

Construction Project

Location:
Pompano Beach, FL, 33071
Posted:
August 17, 2010

Contact this candidate

Resume:

Alex Munits

General Superintendent

828-***-**** / E-mail: **********@*********.***

As a General Superintendent for your project, Alex will effectively

schedule, monitor, and inspect all work from project start to customer

orientation at the project's end. Alex will work with owners, architects,

engineers, developers, contractor team members, inspectors, and government

officials to bring the project in on-time, on budget, and to specification.

Credentials:

. 24+ years experience in the construction industry

. B.A. Union County College 1984 Construction Management

. C.E.S. - General Contractor's Exam

. GSD Contracting, LLC - Fort Lauderdale, FL -Project Superintendent

worked on a Westin Diplomat Resort and Spa addition / renovation.

Responsible but not limited to: Scheduling for entire job, Estimating,

Meeting with owners, Inspectors and Sub-contractors, Quality Control,

Payroll; EFFCU - Grounds up EFFCU Credit Union in the City of Sunrise,

FL; Chase Florida Bank, Davie FL, Federal Reserve underground

renovation, Miami, FL 09/06 - 12/09

. Leighton McGinn Company - Riviera Beach, FL - Served as Project

Superintendent for the construction of ACHA approved Medical

Buildings, Government Projects and Bank of America buildings.

Responsible for job-sites, project quality control, meeting with

owners, superintendents, and other subcontractors 09/02 - 03/06

. Dooley Mack Constructors of South Florida - Coral Springs, FL - Served

as a Sr. Project Superintendent, responsible for estimating, buy-outs,

scheduling, Submittal log to Owner, Architect. Payroll authorization,

Safety meetings, Site inspections. Construction of ABC Liquors, CVS

Pharmacies, FAU, Construction of 10 Minute Manicure, ACHA Weston Out-

Patient Surgical Center, North Lauderdale Fire Station #34 2/99 -

09/02

. MHS Contracting - Lake Worth, FL - Served as a Project Manager,

General Superintendent, Estimator, Safety Inspector and Quality

Control, ACHA Deerfield Medical Center. Responsible for 50 banks at

First Union (Wachovia) act of 1996 ADA improvements for the entire

State of Florida. FT BRAGGS Military Bunker Construction Project,

State of Florida FDOT work 1/94 - 1/99

. General Contractor - Coral Springs, FL - Construction of single family

residential homes in NW Broward, S Broward, West Palm Beach, and

Hurricane Andrew renovation and re-building 06/85 - 01/94

Experience/Education:

. Henderson Pre-school Playground at FAU - Boca Raton, FL - Complete

renovation of a children's playground located on a college campus

including excavation, soil treatment, compaction, soil testing,

structural walkways, and play-ground equipment installation - $550,000

Experience/Healthcare

. Weston Outpatient Surgical Center - Weston, Florida - Interior

Renovation and Expansion with ACHA inspections- 18,000 sf - $ 3.5

million

. Weston Cosmetic Surgery Center - Weston, Florida - Tenant build-out of

two single-story cosmetic surgery office ACHA approved, block/CMU

units totaling 5957 sf. - $3.6 million

. Cambridge Medical Center - Deerfield Beach, FL - Remodel of existing

recreational facility at Century Village into a fully operational

medical center including x-ray and colon treatment, as well as several

doctors' offices and exam rooms. The medical center has served as a

local hospital for an elderly retirement community. The facility was

fast-tracked in record time, ACHA approved - $ 4.2 million

. 3 Hospital Medical Office Buildings - Ft Walton Beach, Atlantis, and

Lake Worth, FL - Complete construction of medical office, exam rooms

and Emergency treatments rooms, all ACHA approved, buildings on

already occupied hospital campuses - $ 4.5 million each

Experience/Commercial Construction and Build-outs:

. 10 Minute Manicure - Miami, Florida - 962 sf interior buildout of high-

end nail salon on Biscayne Blvd,

. Boca Raton Computer School - Boca Raton, FL - Interior remodel of

existing store and conversion to computer school, including but not

limited to low voltage wiring, interior finishes and high-end

projection screen installation for technical high-school - $ 450,000

. Shoppe's of San Marco Medical Office Building - Delray Beach, FL -

Complete construction of 50,000 sq. ft two-story medical office /

commercial building - $ 1.6 million

Experience/Financial Services Offices:

. First Union National Bank - Hutchinson Island, FL - Complete remodel

of an existing bank in a tourist destination without disrupting

operations, worked day and night, brought building into compliance

with ADA and First Union corporate standards and codes - $450,000

. Washington Mutual Home Loan Center - Palm Beach County, FL - Tenant

build-outs of existing ordinary office space to Washington Mutual's

new concept of home loan centers, including computer and low voltage

enhancements and state-of-the-art interior design - $600,000 each .

. First Union National Bank - 50 Branches in Martin, Palm Beach, St.

Lucie, and Indian River Counties, FL - Retrofits for ADA requirements

to existing facilities accomplished without disrupting operations - $

2.6 million each

. Washington Mutual Home Loan Center - Melbourne, FL - Tenant build-out

of existing ordinary office space to Washington Mutual's new concept

of home loan centers, including computer and low voltage enhancements

and state-of-the-art interior design - $1.1 million

. Bank of America - Lake Worth, Jupiter, Weston, and West Palm Beach, FL

- Complete construction of new Bank of America branch bank building

from the ground up, including but not limited to site prep,

underground utilities, sewer, water, building shell, and interior

build-out - $ 1.2 million each - Completion in 90 days from start to

finish Date

. Eastern Financial Credit Union - Sunrise, Florida - Complete

construction of this new facility from the ground up, including, but

not limited to underground sewer installation, Storm water tie-in,

SMU building with 6 drive-thru bays, and a split-face exterior,

complete interior build-out, all in record time of 104 days from start

to finish.1.5 Million

. Chase Banking Center - Davie Florida - One of the first Chase centers

to go in Florida after WAMU fall. Ground up construction of 40,000 sq

ft free standing building and site development all with-in 120 days

from start to finish. 1.2 Million

Experience/Single and Multifamily Residential:

. Hurricane Andrew Restoration - Kendall, FL - Renovation, Restoration,

New construction of Residential Homes destroyed during the Hurricane

Andrew Devastation. Responsible for quality control, Estimating, State

of Florida Emergency Management meeting Coordination, scheduling,

inspections, Tenant relocation

. Ft. Lauderdale, FL - Construction of eight-unit, four-story town-home

project. Responsible for quality control, scheduling, estimating,

meeting with owners and inspectors, sub-contractors, payroll

authorization - $ 8.8 million -

. The towers at Delray Beach - Delray Beach, FL - Complete construction

of eight-unit, four-story condo unit in the heart of Delray Beach,

including but not limited to underground, site work, eight swimming

pools, eight garages, and back up generator - $ 15.6 million -

. Custom Log Cabin Homes Construction deep in North Carolina's

Mountains ranging from 1200sq.ft to 3000sq.ft, from ground up with

septic and power installation. Currently

Experience / Government Work

. Ft. Braggs Air force Base - Complete renovation of 4 story barracks

located on base, including but not limited to demolition, Electrical

up-grade, HVAC upgrade, Low Voltage up-grade and interior finished

while the living quarters remained open..

$ 2.3 million

. West Palm Beach Juvenile Detention Center - Re-roof the entire

facility during regular business hours with maximum security guards on

staff at all times. $ 750,000

. Ft. Lauderdale Juvenile Detention Center - Chiller system up-grade

during regular business hours, including but not limited to

Excavation, Concrete placement, Equipment installation and start-up. $

1.2 million

Experience// Retail

. ABC Liquors - North Miami Beach, FL - Out-of-the-ground construction

of new liquor store in compliance with OSHA regulations, including but

not limited to shell layout, supervision of block and cell pours,

structural steel installation, and interior finishes - $ 450,000 -

. CVS Pharmacies - Lauderhill, Margate, Coral Springs, Pompano Beach and

Tampa, FL - New construction of 10,000 sf drugstores from the ground

up including but not limited to underground construction, drainage,

sewer, interior and exterior finishes ahead of scheduled completion

dates - $ 1.6 million each -

Experience / Restaurant and Hospitality:

. Ciao Cucina Restaurant - Ft. Lauderdale, FL - Out-of-the-ground

construction of a prestigious restaurant for a restaurant chain - $1.4

million -

. Westin Diplomat Resort and Spa addition / renovation of entire

escalator in the Landings

portion of garage. Project that should have taken 6

months was completed in 85 days - $1.7 Million,

Security Shutter installation @ Splash Bar during high occupancy

season -

$95,000

Experience / Big Box

. Home Depot Home Center - Coral Springs, FL Complete construction of

brand new Home Depot at University Commons Shopping Center. 100,000 Sq

Ft. Building 3.6 Million

. Sam's Club - Coral Springs, FL Complete construction of Sam's Brand

New Sam's Club located at University Commons Shopping Center 100,000

Sq. Ft. Building 3.1 Million

. Super Wal-mart - Ellijay, GA Complete construction of Super Wal-mart

from start to finish, 150,000 Sq Ft. Building 3.2 Million

Experience / Civil

. Sunshine-Skyway Bridge - Sarasota, FL US 19 / 275 Bridge and

roadway repair for the State of Florida renovations and roadways

repair project 1998. Complete renovation of US 19 bridge over Tampa

Bay while allowing traffic to go through. Some night work, some lane

closure, including but not limited to concrete repair, rebar

placement, MOT and FDOT.

. Florida Turnpike Expansion roadway and bridges project - West Palm

Beach, FL 2006 FDOT / Palm Beach County roadway expansion project

including but not limited to MOT, DOT, Soil testing, Bridge

Construction, Bridge widening, paving and striping, night work and

shift work.

. Proficient in MS Office, MS Outlook, and MS Project, Strong

profit/loss experience.

. Proficient with heavy equipment (Forklifts, Reach Forklifts, Bobcats,

Scissor lifts, Combination Backhoe, 944 Front End Loader, Dozer,

Grader, Compactors, ect.)

. Strong verbal, written, computer, technical communication and

presentation skills.

. Strong self-starter with ability to work both independently and as

part of a team.

. Demonstrated ability to effectively manage multiple priorities and

business relationships.

. Current holder of : American Red Cross Adult CPR & OSHA 30hr class



Contact this candidate