F. Ross Hurley 314-***-****
*** ******** **. **** **********@*******.***
St. Charles, MO 63304
PROJECT MANAGER
________________________________________________________________________
. Commercial . Retail . Industrial
. Construction Analysis . Intuitive Problem Solving .
Estimating
. Intuitive Problem Solving . Cost development / tracking
. Scheduling
. Public Presentations . Safety Awareness
An experienced construction project manager, skilled in facilitating the
overall processes of the construction projects. This includes concept to
finish, all the while inspiring & supervising the personnel on the project
in a positive mode. As well as interfacing with Clients, Officials, and
Public resources.
SELECTED ACHIEVEMENTS
. On Site Project Manager for Monsanto AG-E projects for cotton research
facilities. This Included effluent systems, cotton gins, cyclones and
super structures, delinting equipment, Seed treating process equipment, and
Laboratories, as well as site work and Maintenance building. Job was
completed with 61743 Man hours with out a single recordable safety
incident.
. Created a base concept for the building of a $380K international
structure in Greece. This involved design, manufacture, and the
acquisition of all the parts and pieces of an entire building, having it
placed in containers and shipping it overseas to site. Personally
supervised the on site construction of the project. Result: A quick and
easily well built, earthquake, weather, and terrorist resistant radio
transmitter station for Voice of America.
. Inspired and managed a group of construction personnel to create,
layout and construct a facility for wheel chair training for a non-profit
group. Result: Paraquad became the proud owner of a donated (first in
the Midwest) Wheel Chair Training facility. An award was given for the
project.
. Managed and facilitated a project to install a large $60K skylight in a
Chicago Mall business, while the facility was open for business. Result:
A 14 x 14 skylight was installed with no loss of business for the client
and no environmental damage to the store during rainy season
. Coordinated the design and construction of a new Hotel Concierge Lounge
in conjunction with a local wood working Company. Responsible for the
conception, implementation, and completion of this project. Result:
Stunning lounge came in 25 % under budget.
. Implemented several action steps to recover a failing construction
project. This included the supervision of subcontractors, along with
consistent communication with the Owner of the building and other involved
vendors. Result: Project was completed with minimal loss of money.
Owner was able to "save face" with the public, owners, vendors and
subcontractors.
. Created a method of layout to build numerous perfect ellipses (of
various sizes) in the construction of a Custom Home. Trained and
supervised the contractors in the implementation of the project. Result:
A one of a kind structure in the area.
F. Ross Hurley (page 2)
____________________________________________________________________________
__
. Assumed responsibility for the management of a failing hotel project,
including the facilitation of material, implementation of schedules, and
creation of rapport with Subcontractors. Result: The completed $7.5 MM
project allowed the hotel to have no litigation due to the initial failing
of the company.
. Designed and supervised the final methodology of construction for the
total replacement of an historical (Circa/1900) wooden storefront building.
Result: The final project was approved by the Historical Society and was
accomplished within budget.
. Created a foolproof field program computer Manual for company
superintendents. Trained the staff in the utilization of the Manual.
Result: End users felt comfortable with the Program. Manual was
eventually purchased by other competitors to use for training purposes.
PROFESSIONAL EXPERIENCE
Integra Construction St. Charles, MO
2008 - Present
Traveling Project manager on Monsanto AG-E Projects
Blanton Construction St. Peters, MO
2007 - 2008
Traveling Superintendent
Walgreens and very high end trim packages
Precision Trim and Carpentry St. Louis, MO 2005 -
2007
Owner
Installation and fabrication of high end millwork packages.
Griffey Custom Homes/Therrien Group St. Louis, MO 2003 -
2005
Superintendent/Project Manager
Responsible for the construction homes from inception to completion,
including site development.
Armstrong Construction St. Louis, MO 2002 - 2003
Project Manager
Responsibilities included estimating, bidding, scheduling, contract
negotiations, material expediting, job closeout and computer
systems/software.
Capitol Construction Group Chicago, IL 1995 -
2002
Senior Project Manager
Responsible for all aspects of the construction of national retail and
commercial projects.
Momentum Builders Simsbury, CT 993 -
1995
Superintendent of Retail Construction
Supervised the construction of retail stores, in malls, throughout the U.S.
F. Ross Hurley (page 3)
____________________________________________________________________________
_
EDUCATION
Associates Degree: Drafting
Tri County Technical School, Eldon MO
Safety:
OSHA 30, OSHA 10, OSHA 8, Millwright Safety
Red Cross Certified
AED Certified
Assorted College Courses:
Auto Cad
Micro Soft Excel
Micro Soft Project
Trigonometry
Geometry
Welding
Other Seminars & Classes:
ADA Regulations
Construction Law
Crane Safety
Construction Safety
Journey Carpenter