ANGELO G. QUARTUCCIA., E.E., M.B.A.
*** **** ****, ****** *********- 212-***-****
New York, N.Y. 10018 Cell - (646) -207-7487
E-Mail – ******.**********@*****.***
Senior Facilities Director consistently achieving high level results in Joint
SUMMARY:
Commission accreditation and compliance. MBA and Electrical Engineer with
experience in major hospital networks in New York City and leading large
construction projects ranging from $250,000 to $10 Million and facilitated
projects up to $80 million on campus. Interacted with architects,
consultants, clients and managed projects to completion within budget and
on schedule.
PROFESSIONAL EXPERIENCE:
New York Presbyterian Hospital - New York, NY 2008 - July 2010
The University Hospital of Columbia and Cornell
Director of Facilities Operations
• Director of five managers, 12 supervisors and 100+ staff relating to the daily operations of the
physical plant and the environment of care, budget of $38 Million, four Million Sq.Ft. campus.
• Oversaw engineering division, boilers, refrigeration, HVAC, carpentry, electrical, plumbing,
painting, machinist, masonry, maintenance workers, laborers, DDC controls and central
dispatch.
• Managed, designed and replaced aging and obsolete infrastructure projects including
electrical distribution, medical gas systems, mechanical steam distribution, air handlers, boiler
repairs and increased air exchanges to 20-25 per hour in operating rooms.
• Streamlined the Sentact “Routine and Do it now” work order system data, created drop down
menus for medical staff. Close out of 2500 work orders per month.
• Rolled out new Four Rivers, CMMS PM Work Order system and tracking of all compliance
related tasks. Migrated and streamlined existing data. Maintain compliance threshold of 95%.
Close out of 2000 work orders per month.
• Instituted budgeting policy for managers. Maintained less than 5% budget to variance on a
monthly basis.
• Introduced training for managers and dispatch regarding proper etiquette, customer sensitivity
and progressive discipline for staff lateness.
• Introduced productivity improvement work order project; increased wrench time by hour,
decreased turn around time to less than 6 hours, increased closed outs by phone by 75%.
• Prepared policy documentation, monitored compliance work orders, continued training for
managers and performed weekly checks regarding PM’s, BMP and Joint Commission surveys
and maintained 95% threshold.
• Joint Commission score of 97% in 1999, 98% in 2002, 1 RFI in 2005 and score of 100% in
2008.
• Extensive Life safety experience, created electronic BBI and database for SOC. Conducted
risk assessment, ICRA, interim life safety and maintained greater than 95% compliance.
• Developed life safety smoke and fire wall drawings to reflect healthcare occupancies and
business occupancies.
Angelo G. Quartuccia, Page 2
• Selected to develop a successful BMP program and demonstrate historical metrics.
• Current regarding NFPA 101 and Joint Commission standards and facilitated training
programs for managers and supervisors.
• Documented all fire alarm and fire suppression systems devices and created 30,000 new
PM’s.
• Capitalize projects and infrastructure upgrades; provided scopes and estimates, bidding,
schedules and timeframes.
• Implemented bidding procedures and policy; developed a pre-qualified bidders’ list and
contractor/vendor rotation list.
• Start up, commissioning and acceptance of the new Heart Hospital. Added 5000 new PM’s to
the equipment inventory.
• Instituted review and sign off on all capital and infrastructure projects by respective managers.
• Implemented enhancement programs for patient rooms, showers, corridors and nursing
stations, followed new standards for color and finishes.
• Prepared hospital for EPA inspections and facilitated OSHA 10 and universal waste training to
all staff.
Bellevue Hospital Center - New York, NY 1981- 2008
Director of Facilities Operations 10/1995- 7/2008
• Director of three managers, nine supervisors and 80+ staff relating to the daily operations
of the physical plant and the environment of care, budget of $20 million. 2.5 Million sq. ft.
campus.
• Managed the maintenance of the physical plant and performed financial, fixed asset and
expected life analysis/projections for all equipment.
• Worked closely with the East River Park Science Project and NYU to facilitate installation
of the three new buildings.
• Selected to work on Bellevue Hospital’s major modernization project and new Ambulatory
Care facility designed by Pei Cobb, Freed and partners. Budget of $200 million.
• Coordinated with the design and construction of the New York City Police and Medical
Examiner to facilitate the construction of a 350,000 square foot DNA facility on Bellevue
hospital’s campus. Budget of $100 million.
• Worked on budgeting and formulating the five-year capital plan with a budget of $280
Million.
• Constructed new prison/psych unit utilizing in-house construction crews, $7 million.
• Coordinated and planned State Department of Health as and Office of Mental Health
surveys.
• Worked on fund raising from major public and private sectors.
• Managed designed and replaced mechanical chillers, emergency generators, air handler
units and fiber optic riser system.
• Re-engineered functions, formulated new staffing levels and reduced expenses, reduced
overtime and trimmed, resulting in approximately 5% savings in OTPS and PS.
• Involved in energy management project that was funded by the New York Power Authority
for an efficient chiller plant and received incentives for Bellevue Hospital from electric
power savings that was realized over seven years. (First of its type for the City of New
York.
• As Chairman of the Utilities Management Committee, developed and introduced work
order tracking system, increase utilization and decreased turn around times also
Angelo G. Quartuccia, Page 3
eliminated duplication error of Work Orders.
• Managed special construction projects and preparation of capital requests and funding.
Projects included the design and installation of the new computer center $2 Million, five
megawatt $10 million power riser system, and the installation of several new nursing units
$3 Million.
• Created and wrote specifications for the service contract unit, $2 million, and developed
the preventive maintenance program for equipment and systems. Later managed and
documented all service contract activities.
• Instrumental in the management and installation of the Biological Decontamination
System.
• Designed and prepared presentational material for fund raising and philanthropist
donations.
• Publisher and editor of the Horizon newsletter.
Senior Project Manager 7/1989 - 9/1995
• Designed and managed construction projects such as installation of the additional 900KW
emergency generator and the completion of the UPS system for the computer data center,
$5 million.
Electrical Engineer 11/1985 – 6/1989
• Supervised consultants including design and construction for the new psychiatric services;
designed and supervised engineers for the installation of the main fiber optic backbone
system fully equipped with concentrators, multiplexers and electronics.
Assistant Electrical Engineer 9/1981-10/1985
• Designed the new neonatal suite at Bronx Municipal Hospital.
• Installed a new $2.5 million emergency system power riser, and a $5.5 million elevator
upgrade.
EDUCATION:
Masters in Business Administration, MBA - Bernard Baruch College, N.Y.
(Executive Education Program) – 1993
Bachelors in Electrical Engineering, EE - Manhattan College, N.Y. -1981
Awaiting acceptance to TJC Life Safety Training Certification Program
PROFESSIONAL ORGANIZATIONS:
American Association of Hospital Engineers. Member of the Professional Engineering Society.
Member of the Computer Technology and Information System Society.
TECHNICAL SKILLS:
Angelo G. Quartuccia, Page 4
Computer Skills:
Imaging and presentation programs, photo shop, digital photography productions, windows media
player, Microsoft Office applications, spreadsheets and databases, Excel, Word, knowledge of
AutoCad architectural and engineering design applications, windows operating system. Manage
WEB site and WEB design. Power Point presentation and Publisher software packages used in
producing quarterly news letters Horizon facilities development news, advertisements, images,
marketing publications and photographer.
Language Skills:
Italian; speak, read
Spanish; speak
INTERESTS AND ACTIVITIES:
Eleven time NYC Marathon Runner. Current Member of the Metropolitan Athletic Congress
race/walking team. Current Member of the New York City Road Runners Club. Biking,
Swimming, ballroom dancing, nutrition, photography and imaging, home improvement
projects, cooking, wine making, canning tomato sauce.