Post Job Free
Sign in

Engineer Electrical

Location:
Irvine, CA, 92618
Posted:
July 28, 2010

Contact this candidate

Resume:

Christian Anzorena

**** *. ******* **. ***.: 949-***-****

Santa Ana, Ca. 92704 ********@*******.***

Software-Hardware Engineer with more than seven year of experience

developing, integrating, implementing and supervising projects in

manufacturing environments. Areas of expertise include:

o Software development (low, middle and high level - C, C++, VB, etc.).

o Digital design and Interfaces design.

o Embedded system design and Automation system integration.

o Image processing (MV).

o Microcontroller/microprocessor systems design.

o Data acquisition system design.

Demonstrated success in processes and production improvements, re-

engineering, people administration, manufacturing and project leadership.

Fluent Spanish and high motivated for new ideas, innovations and team

goals, frequently selected to be window person and to study best

implementation solution.

EMPLOYMENT HISTORY

MITSUBISHI-MDEA Sept/2008 - July/2010

Electrical Engineer

Responsible to conduct product reliability tests, make all necessary

changes, ensure documentation and implementation.

. Evaluated Software for functional debug and ensured it meets new

features and specifications, reported any troublers on DevTrack system

to follow up changes, versions and history debugging.

. Conducted EMI measurements and implemented successfully

countermeasures based on noise reduction techniques to meet FCC

requirements.

. Interpreted schematics and converted them to block diagram for better

understanding using MSVisio and MSExcel.

. Made schematic changes and reviews using Zuken and ensure all

documentation updating for next revisions.

. Released specifications for new and existing products as well as test

reports for ISO documentation.

. Conducted several tests like Temperature Stress, Temperature cycle,

Lightning surge, Over Voltage Protection, Over Current Protection,

etc. as well as measurements like Ripple voltage, Ripple current, etc.

and made engineering changes to meet the product specification.

. Served as window person between Japan, Mexico and USA to accelerate

engineering changes and requirements.

. Initiated, distributed and implemented engineering changes using PDM

system until production level with follow up.

MITSUBISHI-PIMS May/2005 - Sept/2008

Project Leader

Led teams for new improving processes integration with more automation

levels complex algorithms using several protocols, sensors, interfaces and

embedded systems own-developed. Interacted with several design groups to

have a better product development.

. Served as window person between Japan, Mexico and USA to

reduce/eliminate NPI issues like new processes, manufacturing

limitations, troubles and complex measurements system implementation

for new TV technologies.

. Advised about new technology introduction for product analysis and

manufacturing studying different vendors around USA analyzing pros.,

cons. and calculating return of investment according with production

rate, system failures, linearity and maintenance.

. Led multidisciplinary engineering teams to reduce/eliminate production

lines rejection rate using Kaizen, Six sigma, Lean and SPC techniques

to track every day/week progress with top management.

. Worked as a team leader to integrate Machine vision/Positioning

project(1), PLC production line control, TV wireless communication

project, TV color communication system and color recognition system(2)

to develop 100% autonomous automated system without operator

intervention.

. Served as advisor for TV wireless communication project (serial and

I2C communication) based on microcontrollers, TV color communication

system and color recognition system based on microcontroller. (2)

MITSUBISHI-PIMS (continued) Christian Anzorena

Page Two

. Developed a real time material feeding system between modular

production line and kitting area eliminating dead/idle time and

misfeeding troubles using VB application (GUI) based on windows system

and microcontroller using assembler, serial, parallel and wireless

communications.

MITSUBISHI-PIMS July/2003 - May/2005

Product Engineer

Applied manufacturing techniques to reach aggressive company goals

regarding market changes increasing company profitability. Used automation

and improvement process to increase production rates, reduce time, cost and

headcount developing/changing original systems with capability to interact

with new product features or own-proposed.

. Changed of repairing logistic system to eliminate excessive inventory

and rejection rate at the same time to reach production rate leading

more than 20 people at modular area working with AI and MI areas to

solve troubles.

. Increased repairing system effectiveness using forecast production

plans to eliminate excessive inventory and rejection rate to reach

production rate leading more than 35 people at final area working with

AI and MI, Modular areas to solve troubles.

. Used of product tracking system to assign responsible area and find

out root problem causes reducing scrap rate for less than 2%.

. Developed production output system to register all product lines

status in real time using VB application (GUI) based on wireless

network to link all company lines and resume into one main application

for top management view.

. Decreased in 92% signal room failures avoiding production lines

dead/idle time, redesigned all signal distribution systems for better

signal strength and reduced 53% in distribution cost mixing signals,

as well as established a documentation and total preventive management

systems.

. Worked with Quality Assurance department to ensure product meet the

engineering requirements and specifications for lot release.

. Helped with NPI models to define manufacturing processes requirements

and proposed new features to increase productivity, as well as

generated reports to register troubles and follow up countermeasures

. Developed application (GUI) with C/C++ and VB to read and record

signal levels automatically from a spectrum analyzer using GPIB port,

eliminating reading and ISO documentation technician activity.

. Implemented a Machine Vision system with automated 3 axis positioning

system to reduce manual alignment time in 85% and eliminated out of

spec alignment rejection using C/C++ application (GUI) based on

windows using RS-485, USB and serial communication. (1)

. Worked with geometry alignment design team to improve alignment

algorithm using statistical and mathematical tools.

MITSUBISHI-PIMS Feb/2003 - July/2003

Engineering Student

Leaned and got more familiar with company policies and good manufacturing

practices, NPI process and all its development stages as well as all

documentation requirements to record changes and countermeasures for ISO.

Understanding of production processes and possible improvements using

technology.

. Designed new interfaces to improved processes and reduce learning

curve avoiding production errors using Analog-Digital design and VB

application (GUI) based on windows computer systems.

. Evaluated NPI units to find out functionality design and manufacturing

troubles.

. Balanced production lines according with production plans and rates.

. Helped with ISO documentation control.

EDUCATION

Cybernetic Electronic Engineer with major in Automation and Control, CETYS

University, Mexicali, B.C.

Laser Safety seminar, Mexicali, B.C.

Lean Manufacturing seminar, CETYS University

Franklin Covey - Seven Habits of Highly Effective People seminar, Mexicali,

B.C.

Manufacturing Cells Design seminar, Mexicali, B.C.

Image Science Foundation seminar, Phoenix, Az.

Six sigma seminar, CETYS University

Several Data Acquisition seminars from Textronics, Cognex, Keyence, etc.



Contact this candidate