Post Job Free
Sign in

Manager Engineer

Location:
Simi Valley, CA, 93063
Posted:
August 03, 2010

Contact this candidate

Resume:

Marcelo D'Elia

**** ********** **. #*** ? Simi Valley, CA 93063 ? 818-***-**** ?

************@*****.***

EMPLOYMENT HISTORY

EATON AEROSPACE, GLENDALE, CA

*-**** ** *-**-10

Skydrol and Air Lab Focused Factory Manager

$92,000/yr.

. Responsible for achieving Strategy Deployment and Daily Management

objectives including Safety, Quality, On Time Delivery, Cost (over

time, rework, PRO's), Productivity, Cycle Time, support to other

departments including R & D, work in process inventory, and

employee job satisfaction.

. Lead communication efforts, presentations, meetings and charts to

ensure personnel are informed of conditions, trends, and important

activities as well as monthly goals and results, quality issues

and other business needs.

. In conjunction with Production Control, Maintenance and

Manufacturing Engineering, develop optimum capacity, efficiency,

and profitability through the upgrading and modernization of

facilities and equipment and improvements in manufacturing

systems, including test stands, pumps, testing and assembly

fixtures, training, cell layout, etc.

. Justify, plan and lead continuous improvements events (ELS, Eaton

Lean System).

. Actively manage and ensure training and development of assigned

personnel to maximize productivity across production departments

including Repair and Overhaul and Red Oil departments.

. Perform associate performance reviews, employee relations'

activities, and corrective action in conjunction with Human

Resources in a timely and effective manner.

. Justify, plan and lead continuous improvements events (Kaizen

events).

. Review daily production schedules with leads and production

control.

. Achieved a 30% improvement in the Boeing brake valve cell's

efficiency by rebalancing and reducing bottlenecks during the

assembly and hydraulic testing.

. Reduced 50% the Airbus Fire Shut Off Valve (FSOV) assembly and

testing cycle time by revising the process plan and retraining

technicians.

. Planned and executed the built-up of the second shift department

to support turn around time and increased production goals.

VISTA LIGHTING, SIMI VALLEY, CA

8-2000 to 8-2006

Operations Manager

$85,000/yr.

. Developed and implemented long range goals and objectives to meet

business and profitability growth objectives

. Managed a 23,000 ft2 plant expansion, doubling the size of the Die

Casting and the Machine Shop Depts.

. Cut assembly time 25% in the first 6 months on the job through the

implementation of internal Kanbans, material flow efficiencies and

employee involvement.

. Maintained a 24 hr-lead time in a make to order environment with no

finished goods inventory in an over 25,000 possible SKU's combinations.

. Improved inventory turns from 15 to 25 by implementing JIT concepts

. Saved the company over $500,000/ annually over the first 12 months on

the job by renegotiating better purchasing contracts, efficiency

improvements, over-time reduction and materials savings.

. Accomplished in-house UL lab certification, which led to the

introduction of the 110v line of product (UL and Canadian UL Listed).

. Managed the growth of the 110v line of outdoor lighting from

introduction to a $3,000,000 in yearly sales.

PENTAIR, MOORPARK, CA 2-

1997 to 8-2000

Business Unit Manager - Pumps/ Lights/ Fiber Optics/ Valves/ Niches

$72,000/yr.

. Accountable for generating 40 million in revenue through the above

departments.

. Leading 140 employees through five Supervisors, one cycle-counter, two

Buyer/ Planners and one Industrial Engineer.

. Negotiations with vendors and subcontractors (prices, forecasts,

Kanban implementations, safety stock

levels, capacity planning)

. Transformed manufacturing from make to stock to make to order.

. Master Production Schedule, Planning Bills and Forecast Maintenance.

. Increased inventory turns from 2 to 9.

. Redesigned Pump Assembly Dept., which decreased cycle time from 6 hrs

to 20 minutes.

. Accountable for writing proposals that improve and justify Capital

Investments

. Responsible for the design, coordination and implementation of

efficient Cellurized Manufacturing which included DFT Techniques,

Kanbans, and Point of Use Storage.

. Quality Improvements through employee involvement and implementation

of TQM

Train hourly employees on WCM Techniques

PRICE PFISTER/ BLACK & DECKER, PACOIMA, CA

1992 to 1997 Assembly Supervisor

$42,000/yr

Coordinated daily operations of 120 organized labor employees,

which included assemblers and CNC technicians.

Developed self-directed teams and guided them in their daily duties.

Team leader of one of four Continuous Improvement Teams, which

saved over $27,000 a month in scrap in the Foundry department.

. Developed Mixed Model Fixed Sequence schedules and trained production

teams, reducing changeover set-ups from 10 minutes to three to five "tack

times".

. Helped to develop "Point of Use" storage systems and Kanbans from

fabrication centers to final assembly

Education

MBA- Pepperdine University (2003)

Bachelor of Science Manufacturing Systems Engineering, California State

University Northridge (1999)

A.P.I.C.S. certification program. (1996)

Demand Flow Technology from the JIT Institute of Technology (1995)

Karrass Negotiation Course (1997 and 1999)

Boeing Lean Training (2008/ 2009)



Contact this candidate