Edward Perepletchikov
West Caldwell, NJ 07006
212-***-**** x 251 work
973-***-**** - home
973-***-**** - cell
Objective: Obtain a position with an organization that will utilize my
skills and experience both in the office as well as in the
field, as a Mechanical Engineer in design and construction of
Heating, Ventilation, and Air-Conditioning systems
Experience: Responsible for the complete engineering design of HVAC systems
for pharmaceutical, chemical, industrial, commercial and
institutional facilities.
Duties and responsibilities include:
. Heating and cooling load calculations.
. Analyzing and evaluating various types of HVAC systems.
. Selection of heating, air-conditioning, and refrigeration
equipment.
. Dust collection.
. Dehumidification.
. Sizing and layout of piping and ductwork.
. Chillers and boilers plant design and layout.
. Preparation of all types of air and water flow & control
(P&ID) diagrams.
. HVAC control including DDC.
. Coordination of design documents with other trades.
. Specification by CSI.
. Preliminary construction cost estimate.
. Construction cost estimate (including change orders).
. Review of shop drawings.
. Field survey.
. Field assistance.
. Field coordination between trades.
. Troubleshooting of HVAC systems.
. Analysis Reports.
. Preparing Scope of Work for outside Contractors.
. Plumbing design.
. Quality control.
. Design team supervision.
Training: Good Manufacturing Practices Procedure Training
(At Schering Plough Site)
Employment History:
6/04 - present GG Engineering.
HVAC Engineer.
4/03 - 5/04 E I Associates, Cedar Knolle, NJ
HVAC Engineer
7/99 - 3/03 Lockwood Greene, Somerset, NJ
Senior HVAC Engineer
8/92 - 6/99 Kvaerner Process, Bridgewater, NJ
Senior HVAC Engineer
1987 - 1992 Jacobs Engineering Group, Inc., Somerset, NJ
Mechanical Engineer
1983 - 1987 Simmins Falotico Group, Inc., New York, NY
Project Engineer
1981 - 1983 Meyer, Strong and Jones, New York, NY
Designer
1979 - 1981 Cosentini Associates, New York, NY
Designer/Draftsman
1971 - 1979 State Design Institute, Mink, Belorussia
Job Assignments:
. BHS of Science.
Chemical Labs Hood Exhaust.
. East River Housing.
Boiler Room conversion from HP steam to Low pressure.
. PS-112 in NYC.
Auditorium Upgrade (New A/C system).
. PS-7 in NYC.
Toilet Exhaust Upgrade.
. PA of NY & NJ.
Various Projects.
. Rikers Island.
RMSC. 800 beds expansion.
. Data Centers, various clients
. J.C. Scott High School, East Orange, NJ
. Member of validation team at Schering Plough, Kenilworth, NJ
. Wyeth Ayerst (Lederly Labs), Pearl River, NY
Bldg 100 complex. HVAC Systems upgrade for Offices and
Process area.
. Lehigh Valley Technologies
Class 100,000 Clean Rooms Facility
. Bank of New York, New York, NY
UPS Closets A/C and Computer Room.
Office renovation.
. St. Vincent Hospital,
Nursing stations, Operating Room, Offices
. Wyeth-Lederly, Marietta, PA
Clean rooms facility and Office bldg.
. Merck, Albany, GA
Specific ventilation project for process area and office
bldg.
. World Trade Center, New York, NY
Performed post-explosion damage evaluation for mechanical
systems
. Naval Weapons Station Earle, Colts Neck, NJ
Calibration Lab, Office bldg renovation
. Genetics Institute, Andover, MA
Biotech R&D and manufacturing facility and Office Bldg.
Many small jobs not listed
Education: Belorussian Polytechnic Institute, Minsk, Belorussia
M.S. in Mechanical Engineering.