Post Job Free
Sign in

Project Manager

Location:
Glenview, IL, 60025
Posted:
August 14, 2010

Contact this candidate

Resume:

Flavio Renzulli

**** ********* ****

Glenview, Illinois 60025

T 847-***-****

E **********@*******.***

Objective

Utilize my results-oriented, hands-on experience in

environmentally conscious construction to aid in the growth and

success of a firm. With more than 10 years of experience in all

facets of construction and materials management, I am

determined to improve construction efficiency through unmatched

knowledge of green building and education on new and important

waste reduction technologies

Experience

05/06 to 01/10

Crown Construction & Development, Chicago, Illinois

Project Manager/On-Site Superintendent

. Performed manager role on commercial projects from planning

phase through occupancy ensuring the timely execution and

delivery of firm projects

. Negotiated pricing and manpower with subcontractors in order

to maintain tight parameters on budgets and flexible budgets

. Performed extensive onsite quality control regimen including

close monitoring of trade performance, tracking of work

timeline; dichotomized and tracked changes and additions

preventing a drift in project scope and budget

. Administered weekly progress meetings with owners and

subcontractors in order to recommended cost saving ideas and

containment measures during the projects in order to develop

more effective communications with clients and to receive

feedback regarding project progress

03/00 to 04/06

Serino Electric & Restoration, Glenview, Illinois

General Contractor (self-employed)

As the primary contact for residential projects, worked

extensively with customers to develop and execute projects that

not only fulfilled their design goals, but also maintained

budgets and quality standards

. Re-designed and fitted plumbing plans including rough

plumbing and boilers to ensure more efficient use of space and

water consumption

. Updated electrical circuits, wiring and fixtures to the

highest local code standards in order to provide significant

savings in energy costs whilst utilizing the most green

conscious and responsible lighting technologies

. Consulted with home owners regarding execution of energy

savings plans for new and existing homes including education

regarding industry leading products such as expandable foam

insulation technologies, LED lighting, tankless water heating

and the utilization of alternative plumbing technology such as

PEX

Notable Projects

Restaurants & Food Industry

D4 Irish Pub-5,000 sqft full-scale restaurant; new construction build

out in a new high-rise in downtown

Chicago

. Through continuous negotiations of contracts and networking with

international vendors, saved over $300K in bottom line project costs

. Improved the design and engineering specifications for main kitchen to

increase productivity, efficiency and overall safety

. Maintained strict adherence to timelines and executed job in 80% of

the time mandated for completion

Epic Restaurant-10,000 sqft (4 story) restaurant in downtown Chicago

restaurant district, $5.3 million project

. Selected for project amongst other larger competitor firms in Chicago

to execute project which previous firm had failed to begin effectively

. Teardown of structure (maintaining 3 external walls) and complete re-

engineering of an early 1900s building including structural,

electrical, plumbing and HVAC

. Maintained budget efficiencies and cost containment measures

throughout numerous changes in architectural plans in order to complete

project with minimal overruns

Argo Tea Caf -1,800 sqft caf -Gut and remodel of caf within a Sears

Retail Store in downtown Chicago

. Worked in collaboration with Sears store management to aggressively

move the project forward, including maintaining an overnight operation

in order to minimize retail store interruptions

. Managed more than 5 separate trades working at the same time and

overlapping space and minimized logistical problems to maintain strict

project timetable

. Completed project within timeline (4 weeks) and within tight budget

constraints

Retail Industry

Club Monaco-3,000 sqft retail store-Gut and remodel of a national chain

retail store within a highly visible mall in downtown Chicago (900 North

Michigan Avenue)

. Worked extensively with out-of-state architect to effectuate changes,

additions, and improvements to project while maintaining strict project

timeline

. Re-engineered the clients millwork plan and developed a solution to

errors made by client's vendors in production of cabinetry in order to

minimize rework, budget overages and project timetable

. Maintained strong relationships with 900 North Michigan Avenue mall

management team resulting in extended work privileges and future

projects

Christofle-700 sqft high profile retail china store-Gut and remodel on

highly visible 1st floor at 900 North

Michigan Avenue

. Managed local and French carpenters to complete complex millwork and

lighting plans within strict design tolerances

. Interfaced with French Architectural firm in order to implement an

accurate vision for store aesthetics and uniformity with international

store guidelines

. Developed alternative plan for millwork lighting in order to

simulate international lighting products unavailable in the

United States

Nonprofit Industry

Safer Foundation-6,000 sqft office-Gut and remodel of 3 floors

of an occupied office building

. Worked with management and staff to relocate employees within

the building on a rotating schedule in order to minimize work

interruptions while maintaining project timeline

. Worked extensively within the vision of the Safer Foundation

in teaching trades to rehabilitated individuals including

carpentry, flooring and minor electrical

. Was integral in design decisions and value engineering to

collaborate in finding savings throughout the project;

saved over $5,000 per floor by reengineering the HVAC design

and floor layouts

Residential

Dilallo Residence-Schaumburg Il-Kitchen, 3 bathrooms, Master

Bedroom rehab

. Worked with customers to brainstorm design ideas prior to

development of final design plan in order to accurately

represent client needs

. Incorporated high efficiency plumbing system and fixtures into

project in order to maximize space and energy savings

. Managed total project and personally executed rough carpentry,

electrical, plumbing, tile plans to client specifications, on

time and within budget constraints

Purpura Residence-Glenview IL-Remodeling of flooring in entire

home, including finish carpentry, plumbing, various electrical

installations

. Researched, recommended and installed environmentally friendly

eco-flooring throughout the second floor of home, resulting in

cost and green savings

. Replaced entire first floor tile with engineered flooring made

with environmentally conscious wood product from Sweden

. Retrofitted home with energy efficient LED lighting and

decreased energy consumption with state of the art dimming

technology

Education & Certification

09/94 to 06/98

DePaul University, Chicago, Illinois

. Bachelor of Science in Operations and Materials Management

Presently obtaining LEED Certification

Licensed Electrician in the State of Illinois

Languages & Activities

. Read and write fluent Italian

. Provide pro-bono services to national historical landmark building and

preserve including restoration of the natural habitat, development and

execution of a 'green' plan for building sustainability and future

preservation

. Involved in extensive outdoor activities including rafting, hiking and

camping



Contact this candidate