Post Job Free
Sign in

Project Manager Design

Location:
Palm Bay, FL, 32909
Posted:
March 09, 2010

Contact this candidate

Resume:

RESUME

Gerard E. Brunner, CGC CONSTRUCTION SUPERINTENDENT

Phone number: 321-***-**** or 321-***-****

Email: *********@*****.***

Career Objective: To find a position that offers career opportunities, expansion of knowledge, and an

immediate challenge.

Certifications:

• Associated Builders & Contractors, Inc./1999

• OSHA Certified and First Aide/CPR

• CGC 061275 since 1999

I have in depth experience as a project manager and superintendent, and have provided scheduling and

coordination for contractors and subcontractors for commercial, industrial, and medical facilities. My

duties have included bids, blue prints, ordering materials, hiring subs, reporting and documentation,

scheduling, and coordinating jobs. I have passed 50 of 52 AHCA Inspections on the first inspection, most

without any comments.

BRPH COMPANIES – 9 Years

Meridian Office Building, Melbourne, FL; Pete Woods Development: The new design/build four-story, 70,000 SF

office was designed to withstand 175 mph wind speeds. The facility will be designed and constructed for

LEED certification. $9 million

Palm Bay Academy Buildout, Palm Bay, FL; Palm Bay Academy Charter School:

Design/build services for new classrooms, music room, library and storage rooms within the existing building.

The project consisted of completing the interior portion of the building that was left unfinished during the

initial construction. $258,532.

TPM for Class Size Reduction Program, Broward County, FL; School Board of Broward County: Total program

management project for classroom building additions at four schools throughout the county. This was part

of a $50 million building initiative to bring the school district into compliance with the state's recently

passed class size amendment. $14.1 million

Harris Radome R6 (RIOT) and R7 (SBX) Relocatable Radomes, Melbourne, FL; Harris Corporation: This

design/build effort, which supports the U.S. Missile Defense Program, consists of two relocatable ISO type

shelter components and chiller skid assembled to form a complete land-based shelter and sea-based

platform. Project also includes the design and construction of the processing site and operational and

handling support equipment for the shelter. $3.7 million

Harris BMC3 Radome Facility, Palm Bay, FL; Harris Corporation: The addition of a new 3,145 SF large

inflatable radome facility was completed via design/build delivery method for the ground-based midcourse

defense (GMD) program. The building is designed to test components for the nation's missile defense program

by providing communications technology that links ground controllers with an interceptor missile that is

fired at an incoming missile. $2 million

Carroll Distributing Facility, Rockledge, FL; Anheuser-Busch, Inc.: This new distribution facility is located on a

28-% acre parcel and consists of a 169,000 SF temperature controlled storage building, truck loading,

marketing material production, storage, and administrative office areas. The project was completed via

design-build. $14.5 million

Classroom Building Addition - Audubon Elementary School, Merritt Island, FL; School Board of Brevard County:

These two 10,000 SF free-standing classroom additions were designed to bridge the technological and design

gaps between relocatable classrooms and traditional school construction. These structures provide utility

far beyond the typical portable classroom at a competitive cost. $1.3 million

Calvary Chapel New Sanctuary & Educational Building, West Melbourne, FL; Calvary Chapel of Melbourne:

Design/build facility which includes a new 51,519 SF sanctuary seating 3,200 persons in a stadium style

auditorium, and a 31,500 SF multi-story educational building on a 10-acre site. A 10,000 SF courtyard

connects the 3-story educational building wing, sanctuary, and old sanctuary. $10.5 million

Other Experiences Include:

Kvaerner Construction - 3 yrs

Projects include:

• Historic renovation of a “Frank Lloyd Wright” science building along with the planetarium building.

$12 million

• University of Central Florida medical arts building. $10 million

• Department of Juvenile Justice Level 10 maximum security facility. $5 million

The Florida Renaissance Group – 6 yrs:

Projects include:

• Total remodel of the Miami Heart Institute, 4 year project. $15 million

• Remodeled existing hospital wings and constructed new emergency room at Columbia Park Medical

Center. $9 million

References: To be furnished upon request.



Contact this candidate