Post Job Free
Sign in

Project Manager Construction

Location:
Harlingen, TX, 78552
Posted:
July 19, 2010

Contact this candidate

Resume:

Thierry R. Lambert

***** ****** *****

Harlingen, TX 78552

956-***-****

*************@***.***

Objective

I am looking for employment as a Construction General

Superintendent/Project Manager in the area.

Areas of Expertise

Experienced in overall field management, including

coordination of subcontractors and materials,

scheduling, project controls, delegation of manpower, and client

relations. Also, I am bilingual in English and Spanish.

Career Summary

More than fourteen years of field experience, beginning as

a field laborer and working into positions of increasing

authority, including project controls, project coordinator,

superintendent, and general superintendent. During the fourteen

years mentioned, I have worked both domestic and

internationally, investing over ten years throughout Mexico on

various projects. These projects range from commercial to

automotive. My background and strong-suit is civil (earthworks,

concrete (foundations, floor-slabs, & tilt-up panels),

carpentry, & finished details), but I have experience in all

disciplines of construction as you will see on my below time

spent supervising different projects.

Employment

1988-1988 MMR Wallace Construction Company

Dallas, Texas

1996-1995 Miami Water Department

Miami, Florida

2001-1997 Morrison-Knudsen/Washington Group Co.

Boise, Idaho

2005-2001 Graycor Construction Co.

Homewood, Illinois

2007-2007 D. Wilson Construction Co.

Mcallen, Texas

2006-2005/ MecoMex Construction (Mecanicos y

Constructores de Mexico), H. Matamoros,

2009-2008 Tamaulipas Mexico

Relevant Experience

Automotive

GM

MecoMex - Project Manager

Design build & new construction of approx. 12,000 sq ft facility spec

bldg., including installation

of all mechanical equipment (exhaust equip. & stacks) for specialized

production equipment.

Project includes all misc. metals (bases & catwalks) to house & for

maintenance reasons to

accommodate the exhaust units.

DaimlerChrysler (Morrison Knudsen)(MecoMex) - General

Superintendent

Canopy and warehouse expansion - Santiago, Mexico

40,000-SF canopy and warehouse expansion.

Site work - Monterrey, Mexico

Site work package including earthwork, UG utilities,

paving, and landscaping.

New Top Coat Paint Line - Santiago, Mexico

Above ground paint booths with oven & inspection lines.

New Touch-up Building - Santiago, Mexico

30,000-SF building, including pits and installation of

booths for final paint inspection.

International Truck and Engine Corporation Graycor - General

Superintendent

Facility expansion - Escobedo, N.L., Mexico

20,000-SF expansion including pits & installation of

roll-testers (dynanometers).

Site work - Escobedo, N.L., Mexico

Site work package including earthwork & paving.

Toyota Graycor - General

Superintendent

New Plant construction - Tecate, BC, Mexico

New 450,000-SF building for new auto plant.

Site work for new Plant - Tecate, B.C., Mexico

Includes build-up of platform (over 2,000,000 m3 in

cut/fill), paving, & finish landscape.

Ford Motor Company Morrison-Knudsen -

Project Controls/Engineer

Renovation work - Cleveland, OH

Renovation and raising of existing roof.

TRW Automotive Supplier Morrison-Knudsen - Project

Superintendent

Facility expansion - Reynosa, Mexico

215,000-SF expansion of existing facility including office

and production areas.

Education

Los Fresnos Elementary School D. Wilson -

Project Superintendent

Construction of new elementary school- Los Fresnos, Texas

New Construction, including site work package, civil works,

structural steel, single-ply

membrane roofing, and MEP Package. (Turn-key)

University of Chicago Graycor - Project

Superintendent

Anatomy - 2nd and 4th floor renovation - Chicago, IL

Renovation of portions of existing second and fourth floor

of anatomy building.

Work includes demolition, rough carpentry, doors, frames,

hardware, drywall, acoustical ceiling, resilient base,

carpet, painting, specialties, casework, HVAC, plumbing,

and electrical tasks.

Bartlett Hall site improvements - Chicago, IL

Site work includes 20,000 SF of new concrete sidewalks,

planters, site lighting, and fencing.

Billings Hospital - 6th and 7th Floor Office

Renovations - Chicago, IL

Approximately 13,000-SF office renovation on 6th and 7th

floors of Billings

Hospital "A" Corridor. Work includes complete demolition

of existing space and

rebuild. Approximately 2,000-SF of steel framing for slab

infills.

Biopsychological Sciences Building (formerly WC Allee

Laboratory) - Chicago, IL

Demolition of interior of an existing two-story building,

a 30' wide addition and

two-story additions.

New Parking structure - Chicago, IL

Tenant build-out of the ground level of a newly

constructed and operating parking

garage structure. Work consist of building out 5,995 SF of

offices, meeting areas,

restrooms, reception, and parking payment windows with

waiting area.

Organismal Biology and Anatomy renovation - Chicago, IL

Renovation of existing office and lab space in the Anatomy

and Culver buildings.

Electronic/Technology

Invensys Electronics Morrison-Knudsen - Project

Superintendent

Office and Production renovation - Reynosa, Mexico

60,000-SF office and production renovation, including

installation of new exterior UG fire loop.

Healthcare

St. Alexius Medical Center Graycor - Project

Engineer/Superintendent

West Wing addition - Hoffman Estates, IL

West wing addition shell package and build-out. Multi level

build-out (2 floors) atop existing multi level bldg.

Provena Mercy Center Graycor - Project

Superintendent

Emergency Department renovation and addition - Aurora, IL

Renovation and addition to existing emergency department.

Retail

CVS Pharmacy Graycor - Project

Superintendent

New building structure- Skokie, IL

Construction of two-level Bldg., including parking lot area &

landscaping package.

Urban Retail Properties Graycor - Project

Superintendent

North Riverside Mall renovation - North Riverside, IL

Renovation of multi-level mall. Work includes changing out

all floor tiles, two sets of new

escalators, installation of new elevator, additional

stairwells, new egg-crate ceiling grids & tile throughout,

& paint.

Food-Services

Kentucky Fried Chicken D. Wilson-

Project Superintendent

New building structure- Brownsville, Texas

Construction of new facility, including site-work package,

parking lots & UG Utilities, and all Mechanical & Kitchen

equipment. (Turn-key)

Kentucky Fried Chicken D. Wilson

- Project Superintendent

Renovation of two existing facilities- Laredo, Texas

Work includes full refurbish of interior/exterior sides of

existing buildings, along with equipment package change out

& new roofing.

Other Experience

O'Donnell Development Company MecoMex- Project

Manager

O Donnell Industrial Park- Toluca, Mexico

Construction of four new Bldgs. - Approx.

500,000 Sq. Ft. of Warehouse space constructed for

lease-back purposes. Project was based on design-build and

consist of four shells (built-up platforms, fiber-mesh

floor slabs, tilt-up wall panels, & SSR roofing) along with

site package including all UG utilities. Project also

involved exterior facilities (Guardhouses, FP Pump-house,

Waste-Water Treatment Plant, Substation, and Scale houses

for railway & trailers).

Electrolux Graycor - General Superintendent

Site-work package - Juarez, Mexico

Site work for new refrigeration plant, includes all

earthwork, UG utilities, paving, & Landscaping

package.

New building structures - Guardhouses, Pump-house, Compressor

Bldg., Hazardous storage Bldg., &

Silos Bldg., including all utilities.

Mechanical Works - Set & installation of cooling towers and of

soft water treatment system.

Miami Water Department Field Labor

Water Department - Miami, FL

Installation and servicing of water piping.

Dallas Water Utilities MMR Wallace - Field Labor

Pipe Inspections - Dallas, TX

Large diameter pipe inspection and testing.

Education

Joliet Community College

Construction Management Classes

Miami-Dade Community College Construction

Management Classes

U.S. Army - 3 Years 82nd

Airborne - Desert Storm

References Available Upon Request



Contact this candidate