Linda H. Asato
LEED Accredited Professional
***** ***** ****** . ********, ** 90505
773-***-**** . *******@*****.***
Senior Project Manager
Summary: Experienced and successful project manager seeking a challenging
position to leverage my passion in architecture and sustainable building
design. Highly organized and disciplined; possess well-developed
interpersonal skills and the ability to mentor others in a supportive team
environment. Project history includes managing the design and construction
of mixed-use, commercial retail, airport terminals and educational
facilities.
Education:
University of California at Los Angeles - Master of Architecture
University of California at Los Angeles - Bachelor of Arts in Design
Professional Experience:
Relocated from Chicago to southern California
2009-Present
. Became a certified LEED AP
. Completed 15 professional seminars on Environmental Energy Design
. Obtained Green & Sustainable Certification from California State
University Long Beach
. Assisted parents with relocation and adjustment to life in Los
Angeles, CA
OKW Architects, Inc., Chicago, IL
2006-2008
Senior Project Manager
. Supervised a team of project architects, designers and engineers for
the design and construction of a $90 million mixed-use development
including a 14-story residential tower,138 room Starwood Aloft Hotel
and 150,000 square feet of retail space in Oak Brook, IL
. Supervised a team of designers and engineers to design and construct a
$120 million mixed-use project, including a 37-story residential tower
and 287,000 square feet of retail space in downtown Chicago
. Negotiated and budgeted project fees of $2.5 million
. Met with city planners to discuss and resolve zoning issues; and with
Fire Department officials to ensure compatibility with building codes.
. Coordinated 300-page construction document sets with engineers,
architects and consultants, verifying consistency in planning, design
and approach to the project.
Linda H. Asato Page
Two
. Developed and maintained the project schedule using MS Project;
tracked financial performance; conducted weekly project team meetings
with up to 12 participants; and advised upper management via monthly
status reports.
. Responded to 350 RFIs and contractor field requests, prepared
proposals and marketing materials to generate new business.
Asato and Associates, Architects and Planners, Homewood, IL
2003-2006
Project Manager/Project Architect
. Researched and analyzed building and zoning codes; prepared project
specifications
. Managed the design and coordination of construction documents for
elementary schools, community centers and high-end custom homes in the
Chicago area
. Oversaw the construction phase of each project, interfacing with
clients and various design consultants
Austin AECOM, Design-Build A/E Firm, Chicago, IL
1998-2003
Assistant Project Manager
. Assisted the Sr. Project Manager with coordination of MEP and
architectural documents for a $1.2 billion international terminal at
JFK International Airport for American Airlines
. Processed construction documents through the Port Authority of NY and
NJ and the Department of Airports
. Supported the Project Manager with design and construction of a $600
million airport hub for DHL Distribution Center in Covington, KY
Technical Skills:
Microsoft Project, Word, Excel, PowerPoint, Outlook
Revit, Autocad, Expedition
Certificates:
LEED A.P. - Leadership in Energy and Environmental Design, Accredited
Professional
Green & Sustainable Building Certification - California State University,
Long Beach, CA
Affiliations:
Member U.S. Green Building Council
Member UCLA Alumni
Member ACE Mentor Program
Sample Portfolio is Available upon Request
Linda H. Asato Page
Three
Relevant Project List
Mixed-Use and Retail Projects
. Clearwater Mixed-Use Development, Oak Brook, IL
14-story 77 unit condominium tower, 138 room Aloft Hotel, 150,000
sq.ft. retail center with a construction estimate of $90 million.
. South Loop Commons Mixed-Use Development, Chicago, IL
44-story 240 unit residential tower, 3-story 287,000 sq.ft. retail
center, 4-story precast concrete parking structure with a construction
estimate of $120 million.
. Hard Rock Condo/Hotel and Entertainment Complex, Las Vegas, NV
A complex consisting of three residential towers, a condotel, casino
and entertainment center, high end bungalows and parking structure
with a construction estimate of $200 million.
Hospitality
. Aloft Hotel, Oak Brook, IL
A "W" Hotel prototype consisting of 138 rooms on six levels operated
by Starwood
. Hard Rock Condo/Hotel and Entertainment Complex, Las Vegas, NV
An entertainment complex consisting of three residential towers, a
condotel, casino and theater, high end bungalows and parking
structure.
Transportation Facilities
. American Airlines International Terminal, JFK International Airport,
NY
An international terminal of 2.2 million s.f. supporting 55 gates,
three concourses, control tower and pedestrian tunnel with a
construction estimate of $1.2 billion.
. DHL North America Hub Distribution Facility, Covington, KY
. Signature Flight Support Terminal, O'Hare International Airport,
Chicago, IL
. Morgan Stanley Dean Witter/Discover Office and Hangar, Palwaukee
Airport, Wheeling
. LSG Skychefs Food Facility, O'Hare International Airport, Chicago, IL
Education / Healthcare
. Commonwealth Elementary School, Los Angeles, CA
. Hollywood Presbyterian Medical Center, Los Angeles, CA
. Amundsen High School, Chicago, IL
. Francis Parkman Elementary School, Chicago, IL
. Medgar Evers Primary Academic Center, Ford Heights, IL
. Ford Heights Proposed Community Library, Ford Heights, IL