Post Job Free
Sign in

Electrical Engineer Maintenance

Location:
26831
Posted:
September 06, 2010

Contact this candidate

Resume:

PROFILE

> I am a proactive self-motivated achiever who combines tenacity, tact

and diplomacy with excellent organising abilities. An outgoing

personality with an innovative mind and a pragmatic positive attitude.

Excellent communicator able to multi-task and prioritise.

> A confident electrical engineer with effective leadership and

managerial skills gained in a fast moving FM and building services

maintenance sectors. Effectively able to communicate with senior

management, customers and staff. Highly motivated in providing

customer service excellence in all fields of contracted and in-house

Facilities hard and soft services.

> On leaving the Descon Engineering Qatar L.L.C after 01 years of

service, I commenced employment in the maintenance division of Kharafi

National L.L.C.I made onward progression to become integrated into the

FM side of the Company. I gained further FM experience in operation

and maintenance service for all Electrical systems throughout the

ADIA Headquarter building, gaining knowledge of Health and Safety

requirements, Risk Assessments, Job Safety Analysis, Controls

Procedures and FM Best Practice to achieve operational excellence.

ACHIEVEMENTS

> Provision of a continuous improvement plan and auditing procedures.

Innovation and energy efficiency schemes implemented to improve

facilities and reduce capital and operational costs. Condition surveys

and remedial costs of installations and properties provided to

customer with recommendations and financial prioritisation. Proposals

raised with scope of works, procurement planning, works programming

and quality auditing procedures instigated on works completion.

Improved production and quality by introducing 'best practice and

multi-skilled supervisors'. Achieved 1 million man-hours without a

lost time incident.

CAREER PROGRESSION

January 2009 to Date KHARAFI NATIONAL

Project: ADIA (ABU DHABI INVESTMENT AUTHORITY NEW HEADQUARTERS BUILDING)

Project, Abu Dhabi, U.A.E

Electrical Engineer in the Facilities Management Division.

> Undertake condition surveys for various clients to provide reports of

building equipment, fabric and grounds of new and existing facilities

making recommendations with regard to the installation and function of

equipment, building fabric and grounds maintenance. Reports to detail

"fit for purpose" design and installation, maintenance activities,

life cycle, environmental and cost effective efficiency with

recommendations for improvement or replacement as required.

> Maintenance of all PPM and reactive works for M&E equipment and

building fabric including electrical generation, water supply and

sewage treatment and minor construction projects

> Act as start-up specialist to set up and run new large contracts.

Start up of contract with compilation of all QA standard

documentation, compile asset register, set up CMMS and CAFM packages.

> Identify new personnel for all disciplines and train as required to

perform to the high standards necessary for the contract. Set up

weekly training packages to familiarise technicians with the new

facility. Set up Life Safety Documentation and train staff

accordingly. Negotiate subcontracts and implement procedures for SLA

and KPI monitoring and control. Set up and implement safety procedures

for staff and documentation for safe working practices as well as

ongoing safety improvements and toolbox training.

> All department work conducted using Risk Assessments and Job Safety

Analysis, Toolbox Talks and other safety tools to ensure work is

carried out in a safe and environmentally responsible manner. Training

and development of 04 supervisory / office staff and 25 craftsmen and

mechanics.

> Maintain close client contact to ensure that contract specification

and customer satisfaction levels are achieved. Actively seek new

business to include follow through to close of contract and start up.

Manage sub-contractors and ensure quality levels (KPI's) are within

the contract specification. Auditing procedures implemented to track

contract compliance and quality.

> Currently assignment: Electrical Engineer Facilities Management

contracted to ADIA, (Abu Dhabi Investment Authority), Corniche, Abu

Dhabi. Responsible for maintenance of all PPM and reactive works for

M&E equipment.

Application of engineering knowledge in design work

> I design the VFD (Variable-Frequency Drives) derating/upsizing of the

Panel to perform better & operate longer life expectancy.

Task delegated

> The main task delegated to me was to carry-out the global event Earth

Hour as on 27th of March 2010.In this task my main target was to turn-

off all the non-essential lights in ADIA for one hour to raise

alertness towards the need to take action on climate change.

Troubleshooting & Maintenance:

I do maintenance of Building Automation in order to reduce the need of

human intervention & PPM (Planned Preventive Maintenance) for all

Electrical works.

> Preventive Maintenance of Standby CAT Generators 1500KVA (Load/No-Load

Test)

> Preventive Maintenance of HV/LV Switchgears

> SOS ( Oil Analysis) for CAT Generators 1500KVA

> Preventive Maintenance of Distribution Boards (Monthly)

> Preventive Maintenance of Shutter Doors.

> Preventive Maintenance of Fire Alarm System.

> Preventive Maintenance of Cast Resin Transformers.

> Preventive Maintenance of 17 Nos. of Mitsubishi Elevators

> Preventive Maintenance of Lightning Conductors.

> Commissioning of Lighting Management System Deli Module, Triac

Converter, CSM & Light Mounted Multisensors (DELMATIC)

> Maintenance of UPS upto 400KVA

> Maintenance on 500KVA Polypropylene PFC (Power Factor Capacitors)

> Installation of SGF-60E High Intensity Air Craft Warning Light (200

meters above Building)

> Installation/Maintenance of Cold Cathode Lighting System in ADIA

Complex

> Installation of 400KVA Galaxy 5000 UPS

> Space Planning Alterations in ADIA Complex

> Troubleshooting of Siemens BMS (Desigo) Software

> Thermal Imaging of all Critical Electrical Equipments.

Shutdowns Attended:

> Troubleshooting of ATS for Transformer Feeder TXCP1

> Installation & Commissioning of REF-542 Card for feeder TXA1 on 11KV

Switchgears

> 400KVA UPS Charging of Batteries & Transferring of Load

> Replacing Digital Energy Meter for 12 Nos. of Secondary Transformers.

> Installation of PT100 Sensor in the LV Winding of the Transformer

feeder TXA1

November 2007 to Nov 2008 DESCON ENGINEERING QATAR

Project: RLOC (RAS LAFFAN OLEFIN COMPANY) Project, QATAR

Site Electrical Engineer for a large Ras Laffan Olefin Project

(Ethylene Cracker) where I was

responsible for the erection of all Electrical items as stated below:

Responsibilities

> Set up and follow-up of construction plans for the erection of

Electrical items.

> To be responsible and report on the scheduling of man/material

movements for all aspects of construction activity.

> To act as a liaison with contractors and clients managing any work

interfaces and enhancements to project scope.

> To undertake team briefings and inception activities to ensure all

aspects of work are understood by all concerned parties

> To ensure safety standards and procedures are implemented and followed

in accordance with contract requirements and Company guidelines.

Field Experience (Installation of Electrical Equipments)

> Installation of MV & LV panels in substation.

> Installation of 24VDC UPS, Generators, Switchgear panels, HVAC units,

HVAC Control Panel, Lighting Distribution Board, Electrical

Miscellaneous items, Earthing and Grounding Systems.

> Installation of Geared motors(Leroy Somer)

> Installation of ABB Industrial Drives (ACS800) modules 1.5-4000 KW

> Installation of (Areva)Transformers upto 2000 KVA

> Installation of MCC'S(NATUS)

> Installation of HVAC (Airwell X6450)

> Installation of Cable trays.

Cable Laying & Termination

> Experience of Cable laying for HV,LV,Control & Special Cables e.g.

> MV & LV:(1x300/1x120 PR6.6KV & U1000 RO2V)

> Flexible cables : (4G95H07,3G35H07)

> Control Cables :(7G1,4G1,14G1,21G1)

> Optical Cables :(1 IP 09EGSF01)

> Special cables :(Schenck,12x1.5/YSLW )

TRAINING / QUALIFICATIONS

2003 - 2005 Advanced Diploma of Electrical Technology,TAFE

Australia

2005-2007

B.Eng (Electrical & Electronics),University of

2007 Teesside,UK

Published Article (How Quantum Computers Will Work)

2008 http://ezinearticles.com/?expert=Mohammad_Qureshi

2009-2010 Primavera P3 training through DESCON Engineering

Qatar L.L.C

Project Quality Management certification

Project Scope Management certification

IELTS (General Training) Overall Band 6.5

2010 Delmatic Lighting Management training

Ongoing Project Risk Management certification

Self training through BIFM and Internet information

to obtain FM Industry "Best Practice"

PERSONAL INFORMATION

Date & Place of Birth 26 April 1984, Doha-Qatar

Health Good - Non-Smoker

Status Single

Citizenship Islamic Republic of Pakistan Passport KG129870

Emirates Work Permit 38954268 - Valid 18.01.2012

Qatar Driving Licence 284******** - Valid

13.01.2013

Emirates ID Awaiting delivery

INTERESTS Travel, Fitness Training, Swimming, Computers

[pic]



Contact this candidate