****S H A W N E E F O R D R O A D S U L L I V A N, M O 6 3 0 8 0 •
C E L L : 5 7 3 2 0 2 513 2 • D O N S O N 3 5 @ YA H O O . C O M
HOME PHONE: 573-***-****
DONALD L. COPLING
Precision Millwright
OBJECTIVE
To obtain long term employment in construction or maintenance as a millwright,
enabling me to use my experience and abilities in a team effort.
QUALIFICATIONS
9 years experience in setting rotating equipment, single and multi line
conveyors, heading boxes, exchangers, compressors, gearboxes, and I have set
a variety of pumps and pump frames. Break turbine housing apart for repair and
reassemble for operation.
EMPLOYMENT
04/19/10 06/11/10: LPR Construction, Toomsboro, Georgia.
Millwright
Set and assemble agitators, set, level, and align blower fans,
Assemble bag houses, and placement of load cells. Set sump
Pumps in sump tanks.
12/7/09 2/8/10:Burkhalter Construction, Satsuma, Alabama.
Foreman/Millwright
Assign daily tasks to millwrights and millwright helpers: set roller
Tables, set elevation, centerline using piano wire and a theatilite.
Set base plates, skid plates, size crunch press, Cementational
Grout.
2/7/09 10/4/09: performance Contractors, Garyville, Louisiana.
Millwright
Set rotating equipment, towers, vessels, exchangers, pipe stress, pre alignment
with dial indicators, and final alignment with lazar.
11/8/08 12/12/08: Trillium Contractors, York, Nebraska.
Millwright
Set single and multi line conveyors, assemble vertical
Conveyors, and calculate drop exchange from one conveyor
To another.
10/18/08 11/5/08: Trillium Contractors, Superior, Iowa.
Millwright
Set vessels for hydrogen and set denature tanks for the production of ethanol.
9/24/08 10/14/08: Trillium Contractors, Big Isle. Virginia.
Millwright
Remove old heading box and install new. Fabricate plates, Weld brackets.
8/25/08 9/19/08: Trillium Contractors, Pennington, Alabama.
Millwright
Install heading box in a paper mill. Cut and fabricate
Brackets and plates in order to set heading box.
8/4/08 8/20/08: Trillium Contractors, Chicago, Illinois.
Millwright
Set conveyors (single and multi line) and align tables with
Conveyor for optimal run time.
1/18/05 8/2/08: McGinnis Wood Products, Cuba, Missouri.
Maintenance/ Millwright
Set conveyors, align end trim saws and cutter heads, set motors, repair hydraulics,
and Heavy equipment operator.
7/24/03 12/30/04: Bourbon metals, Bourbon, Missouri.
Fabricator/ Welder
Cut mounts, built steel trailers, built aluminum trailers.
7/14/95 3/18/00: DC & Associates, Cuba, Missouri.
Owner/ millwright
Sub contract work, setting single and multi line conveyors. Setting motors and
aligning pumps. Installing compressors and air lines.
8/24/90 7/11/95 : McBride & Son Construction, St. Louis, Mo.
Carpenter/ Framer
Build the skeletal structure of housing units.
EDUCATION
3/18/92 : East Central College Union, Mo.
G.E.D.
8/22/90 8/21/91 : Carpenters Hall St. Louis, Mo
Pre apprentice : Carpentry Basics
3/27/92 6/15/94 : East Central College Union, Mo.
Associates: Electronics
Associates: Robotics
Associates: Psychology
LANGUAGES
English
Spanish (some)
REFERENCES
Alton Hairr
13178 Cole Dr.
Gonzales, La 70737
Jack McGinnis
1324 Old Hwy 66
Cuba, Mo 65453
John Copling
2019 Birch Lane
Cuba, Mo 65453
Extension to Don Copling’s Resume
Tu rbines
I have worked on G E turbines frame 7 and frame 7 stretches. I also
worked on Siemens turbines 5 frames. Assembled and installed turbines
according to schematics. Perform maintenance by checking the clearance
by means of filler gauges and plastigage. Reassemble for operational
r un. I have worked on turbines off and on for a total of 2 years. I am
w illing to learn and not afraid to ask if I don’t know. I am a fi rm believer
i n one thing,” someone else has done it, so it can be done.”
I have my OSHA 10 and MSHA training. Qualified to operate a fork
t ruck,
65’ Scissor lift, JLG, Front-end Loader, and a 12T Brauderson flat deck.