Craig Kenmotsu, LEED AP
Downers Grove, IL 60515
Phone: 630-***-****
Email: **********@*****.***
EXPERIENCE
****-******* ******* *******, **** NORTH CORP., Rosemont, IL
King Shan 35,000 SF Office/Manufacturing West Dundee,
IL. $2.7 mil
Barbara's Books 3,800 SF Retail Bookstore Burr Ridge Village
Center $190k Remodeled second generation space in Burr
Ridge Village Center. All custom casework and specialty
fixtures specifically designed for clients products.
Oakview Corp. Park 120 acres Industrial Park West Dundee, IL.
$6.4 mil Park required a sanitary lift station, two wetland
detention ponds and the infrastructure to be brought in to
each buildable lot.
Oakview Speculative 1 154,000 SF Office/Warehouse West Dundee,
IL. $5.1 mil Building designed to accommodate up to 4
possible tenants
Leafs Hockey Club 105,000 SF Ice skating facility West
Dundee, IL $14 mil Facility was built for a not for
profit youth hockey club and completed within 7 months
included three skating rinks, pro shop, concessions, and
studio rink.
Arboretum Landmark 587,000 SF Residential Complex Lisle,
IL $65 mil Five story 391 unit residential complex that
included an attached 5 story parking structure. Was two
weeks away from submitting coordinated design drawings to the
village when the developer pulled the plug due to lack of
funding.
University of Notre Dame 181,000 SF Ice Hockey Arena Notre Dame,
IN $500k
Involved in the Design/Programming for the University of
Notre Dame's LEED Gold ice hockey arena.
2001-2006 Project Manager, PRINCIPLE CONSTRUCTION CORP., Bannockburn, IL
Andrews Products 50,000 SF Office/Manufacturing Mt Prospect,
IL $3.2 mil Entire warehouse was climate-controlled and
had specialized foundation pads for sensitive manufacturing
equipment.
Woodgrove Medical Center 45,000 SF Medical Office Woodridge, IL
$2.5 mil Included a 4,000 SF build-out of medical offices
for Dr. Choudhry.
Chicago Party Rental 101,000 SF Office/Warehouse
Countryside, IL $6.2 mil
Rainbow Graphics 40,000 SF Office/Manufacturing
Mundelein, IL $3.2 mil Warehouse floor was engineered with
steel pins to be able to handle the weights of printer paper
rolls. Floor tolerances under printer equipment lines had to
be within an 1/8" per 10 feet.
Crete Business Park 80 acres Industrial Park Crete, IL $200k
Construction manager for Crete Partners LLC. developed site
into 32 buildable lots.
Speculative Building 40,000 SF Office/Warehouse Crete, IL
$1.9 mil Designed to accommodate up to four tenants for
Capital Realty and Development.
Orchard 88 60 acres Industrial Park Aurora, IL $3.0 mil
Developed site into twelve buildable lots for Podolsky
Northstar.
Service Pallet 40,000 SF Office/Manufacturing North Aurora, IL
$3.2 mil
Hospira 300,000 SF Tenant Improvement Pleasant Prairie, WI
$5.5 mil Warehouse and 30,000 SF cooler had to meet Food and
Drug Administration strict guidelines in order for
pharmaceuticals to be manufactured and stored at this
facility.
AAA Cooper 40,000SF Truck Cross Dock Bensenville, IL $2.5
mil
Site was remediated due to high levels of lead within the soils and
air quality tests were preformed weekly to ensure safety
guidelines were met.
1998-2001 Construction Manager, MARS EQUITIES, INC., Tinley Park, IL
. Speculative Building - 55,000 SF office/warehouse building
in Tinley Park, IL.
. Preformed multiple tenant improvements of retail, office,
and industrial space.
. Developed space plans customized to suit client needs while
trying to minimize costs.
1996-1998 RAMPART CONSTRUCTION SERVICES, LLC, Coraopolis, PA
Quality Control Manager (9/97-3/98) - National Institute of
Health, Bethesda, MD
. Responsible for all engineering and quality control for the
project including concrete mix design, layout, and QC
program.
. QC program consisted of meeting with the owner's
representative and engineers on a weekly basis and meeting
with the contractors to insure the quality and standards
were met as outlined in the project specification book.
Project Superintendent (4/97-9/97) - San Francisco International
Parking Garage
San Francisco, CA
. Supervised crew of 15 performing shoring, hydro demolition
and water control.
. Responsibilities also included maintaining the schedule;
purchasing and ordering; submittal preparation; quality
control; communication with owner and engineers; and
coordination of activities with joint venture partner.
Project Engineer (9/96-4/97) - New Jersey Performing Arts
Center, Newark NJ
. Involved in the purchase, receipt, placement, and
scheduling of materials on site.
. Established all grades, drainage profiles, and quantity
takeoffs; maintained the as-built daily records; and
coordinated with subcontractors to ensure that schedule and
product quality were achieved.
. Project consisted of 145,000 sq. ft. of concrete removal,
using hydro demolition, and replacement.
. All steel was removed and replaced, 135, 000 sq. ft. of
membrane was removed and 250,000 sq. ft. of membrane was
installed.
EDUCATION Illinois Institute of Technology
Bachelor in Science in Civil Engineering, May 1995
Minor in Fire Protection and Safety Engineering