EXPERIENCE

****-******* ******* *******, **** NORTH CORP., Rosemont, IL

King Shan 35,000 SF Office/Manufacturing West Dundee,

IL. $2.7 mil

Barbara's Books 3,800 SF Retail Bookstore Burr Ridge Village

Center $190k Remodeled second generation space in Burr

Ridge Village Center. All custom casework and specialty

fixtures specifically designed for clients products.

Oakview Corp. Park 120 acres Industrial Park West Dundee, IL.

$6.4 mil Park required a sanitary lift station, two wetland

detention ponds and the infrastructure to be brought in to

each buildable lot.

Oakview Speculative 1 154,000 SF Office/Warehouse West Dundee,

IL. $5.1 mil Building designed to accommodate up to 4

possible tenants

Leafs Hockey Club 105,000 SF Ice skating facility West

Dundee, IL $14 mil Facility was built for a not for

profit youth hockey club and completed within 7 months

included three skating rinks, pro shop, concessions, and

studio rink.

Arboretum Landmark 587,000 SF Residential Complex Lisle,

IL $65 mil Five story 391 unit residential complex that

included an attached 5 story parking structure. Was two

weeks away from submitting coordinated design drawings to the

village when the developer pulled the plug due to lack of

funding.

University of Notre Dame 181,000 SF Ice Hockey Arena Notre Dame,

IN $500k

Involved in the Design/Programming for the University of

Notre Dame's LEED Gold ice hockey arena.

2001-2006 Project Manager, PRINCIPLE CONSTRUCTION CORP., Bannockburn, IL

Andrews Products 50,000 SF Office/Manufacturing Mt Prospect,

IL $3.2 mil Entire warehouse was climate-controlled and

had specialized foundation pads for sensitive manufacturing

equipment.

Woodgrove Medical Center 45,000 SF Medical Office Woodridge, IL

$2.5 mil Included a 4,000 SF build-out of medical offices

for Dr. Choudhry.

Chicago Party Rental 101,000 SF Office/Warehouse

Countryside, IL $6.2 mil

Rainbow Graphics 40,000 SF Office/Manufacturing

Mundelein, IL $3.2 mil Warehouse floor was engineered with

steel pins to be able to handle the weights of printer paper

rolls. Floor tolerances under printer equipment lines had to

be within an 1/8" per 10 feet.

Crete Business Park 80 acres Industrial Park Crete, IL $200k

Construction manager for Crete Partners LLC. developed site

into 32 buildable lots.

Speculative Building 40,000 SF Office/Warehouse Crete, IL

$1.9 mil Designed to accommodate up to four tenants for

Capital Realty and Development.

Orchard 88 60 acres Industrial Park Aurora, IL $3.0 mil

Developed site into twelve buildable lots for Podolsky

Northstar.

Service Pallet 40,000 SF Office/Manufacturing North Aurora, IL

$3.2 mil

Hospira 300,000 SF Tenant Improvement Pleasant Prairie, WI

$5.5 mil Warehouse and 30,000 SF cooler had to meet Food and

Drug Administration strict guidelines in order for

pharmaceuticals to be manufactured and stored at this

facility.

AAA Cooper 40,000SF Truck Cross Dock Bensenville, IL $2.5

mil

Site was remediated due to high levels of lead within the soils and

air quality tests were preformed weekly to ensure safety

guidelines were met.

1998-2001 Construction Manager, MARS EQUITIES, INC., Tinley Park, IL

. Speculative Building - 55,000 SF office/warehouse building

in Tinley Park, IL.

. Preformed multiple tenant improvements of retail, office,

and industrial space.

. Developed space plans customized to suit client needs while

trying to minimize costs.

1996-1998 RAMPART CONSTRUCTION SERVICES, LLC, Coraopolis, PA

Quality Control Manager (9/97-3/98) - National Institute of

Health, Bethesda, MD

. Responsible for all engineering and quality control for the

project including concrete mix design, layout, and QC

program.

. QC program consisted of meeting with the owner's

representative and engineers on a weekly basis and meeting

with the contractors to insure the quality and standards

were met as outlined in the project specification book.

Project Superintendent (4/97-9/97) - San Francisco International

Parking Garage

San Francisco, CA

. Supervised crew of 15 performing shoring, hydro demolition

and water control.

. Responsibilities also included maintaining the schedule;

purchasing and ordering; submittal preparation; quality

control; communication with owner and engineers; and

coordination of activities with joint venture partner.

Project Engineer (9/96-4/97) - New Jersey Performing Arts

Center, Newark NJ

. Involved in the purchase, receipt, placement, and

scheduling of materials on site.

. Established all grades, drainage profiles, and quantity

takeoffs; maintained the as-built daily records; and

coordinated with subcontractors to ensure that schedule and

product quality were achieved.

. Project consisted of 145,000 sq. ft. of concrete removal,

using hydro demolition, and replacement.

. All steel was removed and replaced, 135, 000 sq. ft. of

membrane was removed and 250,000 sq. ft. of membrane was

installed.

EDUCATION Illinois Institute of Technology

Bachelor in Science in Civil Engineering, May 1995

Minor in Fire Protection and Safety Engineering