Post Job Free
Sign in

Project Manager Construction

Location:
Chandler, AZ, 85226
Posted:
September 07, 2010

Contact this candidate

Resume:

Donald J. Enright

August **, ****

Dear Sir/Madam,

This resume is for an Architect or Project Manager position. I am

available to travel or relocate to any location the position requires and a

challenging opportunity is available. I will assume all relocation expenses

incurred. I am searching to join an organization I can help grow and am

willing to show my worth in a contract position. I can bring additional

expertise in the following areas:

. Proposal Preparation including Approach, Cost, and Schedule

. Development/Implementation of Project Design/Construction Documentation.

. Specifications Writing, Estimating and Contract Administration

. Design/Build project completion

Recent responsibilities included providing Integrated Project Delivery

(IDP) services tailored to a client's specific needs and managing the

production, coordination, planning, financial management and marketing of

A/E services and/or design/build projects. These responsibilities included

the preparation, engineering, construction subcontractor selection,

scheduling, compiling lump sum cost for the proposal and project management

of municipal and Federal (DoD) design/build projects. Some of the

responsibilities have also included:

. Manage projects from proposal through completion of construction. Oversee

Scope, Schedule and Budget for projects and interface with design,

construction and estimating resources to enable facility system design,

construction, equipment installation and start up.

. Provide definition of scope, development of project budgets, schedules,

detailed design, safety requirements, commissioning activities and

managing financial aspects of each project through conclusion.

. Coordinate activities of Consultants and contractors; interface with

client staff and vendors.

. Maintain client relationship, address clients' special requests and post-

project concerns when necessary.

Prior responsibilities have included the overall planning, direction,

management and successful completion of architectural/engineering facility

design projects while working within a full service A/E firm environment.

This has included meeting with clients, preparing project proposals and

developing engineering, schedule and construction budgets. Other

responsibilities have included developing facility master plans and project

information coordination. Further responsibilities have included the

supervision of the design and detailing of construction contract drawings

and specifications for code compliance and constructability, quality

control of the construction documents and all facets of construction

administration. I can provide:

. 10+ years experience leading design teams providing design, planning,

technical development, scheduling, cost estimates and construction

documents for complex science and technology projects.

. Coordination and detailing of construction contract documents for

buildings and interiors of corporate offices, training centers, computer

centers, cafeterias and warehouses, healthcare facilities, hospitality,

university research buildings, complex science and technology facilities

(life science, biotech and nanotechnology), cleanrooms, research and

testing laboratories, hazardous materials storage, manufacturing and

recreation facilities.

. Provide code review research and documentation, write and edit project

specifications.

. Cad literate: Proficient with Revit 2010, AutoCad (10+yrs),

Microstation (5+yrs).

. Develop realistic A/E budgets, schedule, construction budgets and

construction administration or management.

. Survey existing building conditions and determining appropriate and

cost effective improvements.

. Completed multiple projects with single construction value of up to

$150M.

. Salary: I will accept a salary in the lower range of the group's salary

structure for the position during an initial "evaluation period" after

which we can discuss my value to the organization. Alternatively, I will

also accept a "contract" assignment for the evaluation period.

I am familiar with LEED 'Green Building' initiatives and all the

individual prerequisites and processes for LEED Building Certification.

Other beneficial experience includes with Excel, MS Word and Project.

Some prior projects I have participated on have been detailed in the

amplified section of this resume. I would appreciate the opportunity to

discuss with you the requirements of a position within your firm. I believe

my experience can be a valuable addition to your organization.

Sincerely,

Donald J. Enright RA, AIA, NCARB

Synopsis of Resume of: Phone: 480-235-

2369 home

Donald J. Enright :

480-***-**** cell

donald_enright@hotmail

.com

EMPLOYMENT

4/07-4/10 Versar - Architectural Program Manager/Construction

Manager

One North MacDonald, Suite 301, Mesa, Arizona 85201

Project Types: Recreation; Federal DoD; DEMA, Design/Build.

Procured and managed $8M worth of engineering and construction

projects. Responsible for the supervision and quality control for

all construction contract documents for each project. Further

responsibilities include proposal preparation, lump sum cost and

project management of design/build projects.

8/05-4/07 M+W Group- Sr. Project Architect

549 W Randolph St # 2, Chicago, IL 60661

Reference: Peter Nimmer 602-***-****

Project Types: S&T Research; Microelectronic Facilities,

University

Research.

Responsible for the supervision of the design and detailing of the

architectural contract documents for projects along with client

and interdiscipline coordination for complex science and

technology (microelectronics, nanotechnology) projects.

6/99-5/05 Raymond Professional Group- Sr. Project Architect/Project

Manager

550 West Van Buren Suite 400, Chicago, Illinois 60607

Reference: Mark Siegel 847-***-****

Project Types: Life Science Research & Manufacturing; Warehouse;

Office.

Responsible for leading multidisciplined A/E design teams

providing design, planning, technical development, scheduling,

cost estimates and construction contract documents along with

client coordination for complex science and technology (life

science, biotech) projects.

4/98-6/99 Consoer Townsend Envirodyne Engineers, Inc.- Project

Architect

303 South Wacker Suite 600, Chicago, Illinois 60601

Project Types: Water & Wastewater; Transportation Facilities.

Responsible for architectural construction documents production.

6/96-4/98 Linden Group Architects- Project Architect

900 Ridge Road, Homewood, Illinois 60430

Reference: Bill Mathys 708-***-****

Project Types: Healthcare; Hospitality; Office; Residential; Multi-

Family Housing.

Responsible for construction documents completion.

2/91-6/96 Raytheon Engineers & Constructors- Sr. Project

Architect/Project Manager

1020 West 31st. Street, Downers Grove, Illinois 60516

Project Types: Life Science Research & Manufacturing; Food

Manufacturing.

Project Manager responsible for proposals to the client indicating

the engineering budget and deliverables and leading

multidiscipline A/E design teams providing design, planning,

technical development, scheduling, cost estimates and construction

contract documents along with client and interdisciplinary

coordination.

REGISTRATION

States of IL (001.015864), AZ (46707), CO (402015), TX (21692) and NCARB

(66863)

EDUCATION

University of Illinois at Chicago, College of Architecture, Art & Urban

Sciences

Degree: Bachelor of Architecture in Structures (Professional Degree-5 yr.)

(FOR AMPLIFICATION PLEASE SEE FOLLOWING)

Science & Technology/Healthcare

Laboratories:

Baxter Healthcare

Microbiology Lab (Los Angeles, CA)- 400SF new lab space.

Quality Control Lab (Los Angeles, CA)- 1,200SF new lab space.

Critical Lab- (Bloomington, IN)- 1,200SF new lab space.

Microbiology Lab (Bloomington, IN)- 1,200SF new lab space.

Quality Control Lab (Bloomington, IN)- 1,400SF new lab space.

Validation Lab (Bloomington, IN)- 300 SF new lab space.

Calibration Lab (Bloomington, IN)- 600 SF new lab space.

Aventis

Analytical Laboratory Relocation (Kankakee, IL)- Relocation and

consolidation of existing research laboratories into a new 2,200

S.F. laboratory space in a new building.

Pharmacia

F-170 Renovation (Skokie, IL) - A 2,000 SF quality control

laboratory renovation.

Pfizer Chemical

Q.C. Laboratory Expansion (Terre Haute, IN.)- - A 2,700 S.F.

laboratory addition with an additional 7,000 S.F. renovated in

an existing building.

Fermentation Lab Renovation - Updated existing laboratory with new

floor plan and equipment.

Abbott Laboratories

Laboratory Renovation (North Chicago, IL.)- Remodeling 20,000 S.F.

of an existing three-story research laboratory building. The

construction was phased for new lab space to be available for

lab relocations as work progressed.

American Maize

Quality Control Lab (Hammond, IN)- 700SF new lab space.

Hospital

Osteopathic Hospital (Olympia Fields, IL)

Remodel of entry area and patient care rooms.

Pharmaceutical Manufacturing/Cleanroom

Baxter Healthcare Corp.

Facility Addition (Bloomington, IN) - An 125,000 SF renovation to

an existing pharmaceutical manufacturing facility which included

site utilities upgrades, new utilities building, manufacturing

space for vial and syringe filling, manufacturing support

offices, shipping and receiving warehouse, quality control

laboratories, a 40,000 SF two story office building with

interior furnishings, a full service employee cafeteria and a

fitness center.

The project included a construction feasibility study to determine

the most cost effective installation of the vial filling process

between an Indiana and a Puerto Rico site. The feasibility study

provided the client an assessment of the existing buildings and

alternate construction scenarios for each site. Uses for each

existing or new building was suggested within the context of the

product manufacturing process and overall site development and

provided upgrades/improvements/additions that would be required

to make the structures appropriate for its suggested use. The

study also suggested cost effective energy/LEED and utility

infrastructure improvements required for each site.

Once the Indiana site was chosen the study master plan was

refined further defining programming/space requirements to

relocate affected departments and a relocation plan for

employees occupying existing buildings on the site that were

required to be demolished was produced. Site security and access

was address during this project with new secured site entries

developed for visitors, employees and product

shipping/receiving.

The work was coordinated with a process design firm from Sweden,

Pharmadule, which supplied pre-engineered building modules

shipped from Sweden and assembled on the project site for the

pharmaceutical manufacturing area. Construction of the site

stick-built portion was completed for $22M. The engineering

(approx. 18,000hrs) that included architectural, structural,

civil, mechanical and electrical was billed at $1.48M. The

duration of the project, from initial design to construction

closeout, lasted 3 years. The project was awarded Facility of

the Year (2006) by the International Society of Pharmaceutical

Engineers (ISPE).

Reference: Keith Robertson- Facility Engineering Services: 847-

948-4227

Baxter Healthcare Corp.

Interior renovation (Aibonito, PR)- Project Architect for a 6,000

SF medical device manufacturing facility retrofit into an

existing warehouse building.

Baxter Healthcare Corp.

Facility addition (Los Angeles, CA.)- Project Architect for a two

story 95,000 SF addition to an existing pharmaceutical (blood

fractionation) manufacturing facility building which includes

pharmaceutical process manufacturing areas, utility upgrades,

quality control laboratories, employee facilities and office

space. Responsibilities included space planning/general

arrangement plan, building & site design, design and detailing

of the architectural documents, review of firm's project

construction contract documents for discipline coordination and

building code (CBC, NFPA, ANSI, ADA) compliance. C/S/A work was

coordinated with an outside design firm, CRB out of their Kansas

City office, which engineered the process, mechanical and

electrical portions of the project. Construction was completed

for $120M with final engineering of architectural, civil &

structural billing at $1.5M.

Reference: George Lohrmann- Manager Facility Engineering

Services: 847-***-****

Pfizer Chemical

Dryer Building Expansion - An 800 S.F. penthouse addition to an

existing process building.

Media Make-up Building Renovation - Renovated an existing two-story

pharmaceutical process building to cGMP standards.

Inoculum Building Renovation - Renovated an existing three-story

pharmaceutical process building to cGMP standards.

Fermentation Lab Renovation - Updated existing laboratory with new

floor plan and equipment.

Recovery Building Renovation - Renovated an existing multi-story

pharmaceutical process building to cGMP standards.

Dryer Building Renovation - Renovated an existing pharmaceutical

process building to cGMP standards

Microelectronics- Cleanrooms

Intel Corporation

Tool Seismic Installation Requirements (Chandler, AZ)- Developed

Seismic Design Requirements for new manufacturing tool

installations. Provided seismic design calculation and

installation detail development standards for Chandler, AZ area

facilities.

Western Digital

Facility remodeling (Fremont, CA) - Expansion of electronic

manufacturing capabilities in an existing building. Project

entailed transforming the 1st floor of a two-story office

building into 2,700 SF ISO Class 4 (Fed Standard Class 10)

cleanroom with 10,000 SF of ISO Class 7 (Fed Standard Class

10,000) chase area and 2,300 SF of office and circulation area.

Project challenges included fitting utilities required for the

manufacturing process within a typical speculative office

building floor-to-floor (15') height. HVAC and process piping

were carefully coordinated during the design phase to be sure

construction could be completed as designed. Additionally, the

roofing structure required reinforcement to withstand additional

loading from equipment and piping runs required to be located on

the existing roof. The remodeled structure was brought into

conformance with the current California Building Code (CBC)

seismic requirements as part of the project.

Georgia Institute of Technology

Nanotechnology Research Building- 175,000 SF research building

containing 40,000 SF Class 100 cleanroom research/manufacturing

space in a 3-story 120,000 SF manufacturing building with a 4-

story 75,000 SF office/lab/conference center building.

Responsible for the Quality Assurance/Quality Control of the

construction documents.

Data Centers

Intel Corporation (Chandler, AZ)

Remodel Secured Data Center- Developed physical access security

retrofit for a 600SF Data Center to meet Intel's maximum

security standards

Remodel Data Center- Provided design and construction documents to remodel

a 1,200SF existing data center/server room. The design provided for

removing and adding new servers and upgrading HVAC and emergency power

to Intel standards. Reconfigured room access to allow for new unit

installations and provided new units installation design while keeping

existing units online.

Warehouse/Distribution Centers

Cardinal Health

Warehouse Distribution Center (Dixon, CA)- 320,000 SF warehouse

distribution building with 14,000 SF office and

support facilities and.30 shipping/receiving truck

docks. A portion of the storage facility was dedicated

to an automated storage/retrieval system with the

balance standard pallet storage. The exterior walls

were tilt-up concrete panels with wooden truss

structural roof system supported by steel columns.

Gateway Park, LLC

Gateway Park- (Chicago, IL)- A new 600,000 SF speculative

warehouse facility with truck and train docks. Each 300,000 SF

area had attached a two story 20,000 SF office structure.

Responsibilities included overall project management,

architectural design and construction document preparation,

overall Chicago Building Code compliance, coordination of client

requirements, interdiscipline coordination and construction

administration. Project was completed for $21.4 M with design

engineering services billed at 1.28 M.

Pfizer Chemical

Warehouse Renovation (Terre Haute, IN.)- Remodeled an existing

12,000 S.F. building to provide for warehousing of

pharmaceutical products.

Facilities

Intel Corporation (Chandler, AZ)

Temporary (1 year) assignment filling in as facilities CSA engineer

in the engineering department reviewing outside consultant's

civil, structural and architectural construction drawings for

Intel facility projects. Provided additional CSA support for all

projects completed at the Chandler facility during that time

ranging from roadway, underground utility, architectural and

structural building renovations.

Office

Cardinal Health

Administrative Office- a 12,000SF office for administrative staff.

Baxter Healthcare

Office Building (Bloomington, IN)- New 40,000 SF two story office

building. Provided site design, facility programming,

construction documents and construction administration.

Interior Office (Los Angeles, CA)- 8,000SF design and detail for

administrative staff.

Duchossois Industries

Office Expansion (Park Ridge, IL.)- A 11,000 S.F. corporate office

expansion and remodeling in an existing warehouse building.

Pfizer Chemical

Office Expansion (Terre Haute, IN.)- A 10,000 S.F. remodeling of

administrative offices with a 3,000 S.F. office/training center

addition.

Federal Projects

Federal DoD proposals: Prepared proposals for projects funded through

an Air Force SATOC contract managed by AFCESA located at

Tyndall AFB, Florida. Verified existing conditions at each

site, prepared SOWs and procured pricing from

subcontractors, prepared engineering and construction

schedule, assembled subcontractor pricing, estimated self-

performed work to compile a lump sum price for the project

completion and wrote proposal to submit for the design/build

projects.

Holloman AFB- HOLL-10-S-3055-Repair Taxiway Delta

Holloman AFB- HOLL-09-S-2840- Repair Hangerette B21808

Goodfellow AFB- JCGU 05-1026- Renovate Post Office Facility

Edwards AFB- FSPM 08-1338- Repair Roofs Main Base

Davis-Monthan AFB- FBNV-99-0020P2- Repair VOQ-Phase 2

Davis-Monthan AFB- FBNV-050076- Repair Dining Hall

Davis-Monthan AFB- FBNV-084003R1- CDC Addition & Repair

Randolf AFB- RAND-09-S-2979- Renovate B901 HQ Building

Some of the completed projects have included:

Arizona Department of Emergency and Military Affairs (DEMA)-

Emergency Structural Evaluation & Repair Services

Project Manager for the structural analysis and emergency

shoring repair of three failed roof trusses at Building M-

5320 at the Arizona National Guard's Papago Park Military

Reservation from November to December of 2007. Building M-

5320 is a historically significant structure (the second

largest adobe structure in the state, originally constructed

in 1937) that currently houses a Military Museum, a dining

hall facility, and a Regional Training Institute for

officers of the Arizona National Guard. The original roof

trusses were found to be in a progressive failure mode (two

new, widening cracks). The project recommended and

completed an emergency mobilization due to life health and

safety issues for the general public and military personnel,

as well as the historical value of the building and the

artifacts in the Military Museum. The project identified two

additional roof trusses that were in a progressive failure

mode. Temporary resolution was to construct temporary

shoring to prevent total roof structural failure. After the

immediate problem was alleviated, provide to DEMA

design/build specifications for the damaged trusses

replacement and additional structural roof upgrades

conforming to original construction techniques.

Municipal

Town of Payson

Conceptual Design Study for New Recreation Center- Based upon

discussions with the Town, the concept of the new facility at

Rumsey Park included an indoor/outdoor aquatic facility and a

multifunctional gymnasium facility to house various sports

activities, including basketball, volleyball, soccer, wrestling,

gymnastics, square dancing, and related organized recreation.

The scope of the planning and study service included: pre-

design and programming including meetings with stakeholders to

determine the intended uses of the new facilities and

corresponding functional requirements, a site and facility

master plan in 2D and 3D with perspective elevations, plan

views, and a 3D concept video; a planning-level cost estimate;

and a formal presentation to Town Council. The study provided

the City with a phasing plan for construction, with associated

costs, and energy efficient design options. The final study

documents provided the Town with a well-defined starting point

for future full-scale design of the new facility.

City of Wheat Ridge, CO

Anderson Park Pool Remodel- CONSTRUCTION MANAGER for a $1.7 million

existing municipal pool renovation. Prepared complete

construction estimate and schedule. Completed proposal bid

documents for submission to the City. After winning the award of

the contract, procured all required sub-contracted labor trades

and materials required for project completion. Resolved problems

that arose during construction due to construction document

discrepancies and negotiated change orders where appropriate.

Construction activities included demolition of existing site

amenities and a portion of the existing pool 50m structure and

deck, installation of a new zero-depth entry leisure pool, re-

plastering of the remaining competition pool, installation of a

new stainless steel gutter system, installation of new pool

piping, pumps, disinfection systems, sand filters and the

construction of a new filter room, construction of a new surge

pit for the leisure pool; equipment building addition and

modification of the electrical system, installation of a new

water slide, renovation of the existing splashdown pool and

installation of numerous water play features, including controls

and piping. All construction activities were closely coordinated

with City representatives and the Engineer of Record.

City of Mesa, AZ

Rhodes Pool (Mesa, AZ)-PROJECT MANAGER for a total renovation of an

existing municipal pool facility. The renovation included the

development of new competitive swimming and diving facilities,

but also highly desirable recreational features, including the

installation of a FlowRider surfing/flowboarding machine and a

zero-entry family pool area with an adjacent "sprayground" for

toddlers and youngsters. The redevelopment included a new

facility entrance building that contained a bathhouse, meeting

room, offices and separate concession and equipment buildings.

Construction was completed for $7.2 M with engineering billed at

$520,000.

Reference: Stephen Ganstrom, P.E- City of Mesa: 480-***-****

Freeport-McMoRan Copper & Gold

Bagdad Community Center Recreational Facility (Bagdad, AZ)-

DESIGN/BUILD MANAGER for an addition to an existing recreation

facility that included an exterior competitive training pool and

a new indoor natatorium with a family beach entry and 2-lane lap

pool. The natatorium HVAC system was design to include an air

dehumidification system. A new admissions entry was included in

the addition along with a complete renovation of the existing

gymnasium locker room to serve both facilities. Additional

amenities completed for the project was an outdoor skate park

and a children's playground. The design/build project was

completed for $4.2M

City of Phoenix, AZ

Desert West Skate Park Bowl Expansion (Phoenix, AZ) - An addition

of a competition skate bowl structure to an existing skate park.

City of Scottsdale, AZ

Chaparral Pool (Scottsdale, AZ)- PROJECT MANAGER for the

design/engineering of the equipment upgrade for an existing

municipal pool/recreation facility. The renovation included

upgrading existing electrical service, pumps, control panels and

chemical control and sanitation equipment.

Reference: City of Scottsdale: Scott Dean- 480-***-****; Tom

Howcroft-602-***-****

Hospitality

Courtyard (Hammond, IN) - 85 room, 3-story wood framed motel.

Fairfield (Bedford Park, IL.)- 118 room, 5-story cmu and precast

framed motel.

Holiday Inn (Bedford Park, IL.)- 103 room 4-story metal stud framed

motel.

Food Manufacturing

American Maize (Hammond, IN)

Corn Syrup Loading Building - A new truck loading facility.

Corn Syrup Refinery Building - A new 10,000 S.F. four story process

building.

Waste Water Treatment Facility - A new facility that included water

treatment equipment and a new testing laboratory.

Dextrin Refining Expansion - Expanded an existing three-story

building to expand refining capacity.

Starch Refining Expansion - A new three-story facility housing

process tanks/equipment with offices and employee facilities.

Maintenance Shop - A new one-story facility housing a general

maintenance shop, employee facilities and general storage.

Dove Bar (Burr Ridge, IL)

Roof Alteration- Responsible for the design and detailing of a roof

raised over an existing ice cream manufacturing line. The

construction raised the roof approximately eight feet to

alleviate structurally overloaded roof beams while production

continued below.

Freezer Addition- Responsible for an 800 SF freezer addition to the

ice cream bar manufacturing facility.

M&M Mars (Chicago, IL.)

Candy Bar Line Addition- Responsible for the architectural

construction documents for new walls, floor and ceiling finishes

for a candy bar line manufacturing renovation.

Nutrasweet (University Park, IL.)

Manufacturing Process Expansion (University Park, IL.)- -

Responsible for architectural building modification required to

expand Nutrasweet manufacturing capabilities.

Corn Products

Project included a corn oil packaging line modification and an

expansion and automation of warehousing and dock facilities.

Pillsbury

Project included a precast concrete addition to an existing food

manufacturing facility to house a new food process line.

Building Remediation Investigations

Cardinal Health

Improper Roof Installation- (Dixon, CA) - Investigate and co-

ordinate resolutions of an improper roofing installation on a

warehouse shipping facility. The roofing contractor did not

provide a sealed vapor barrier allowing air to infiltrate

between the vapor barrier and roofing membrane causing the

roofing membrane to stretch and billow. Resolution was to have

the roofing contractor provide a sealed vapor barrier membrane.

Facade Water Infiltration - (McGaw Park, IL.)- Investigate and

recommend solutions to eliminate interior damage due to water

infiltrating the building fa ade. Solution involved a

combination of resealing curtain wall joints and epoxy injection

of cracks in concrete foundation walls.

Retail

Walgreens

Retail facility (Puerto Rico)-Design and detail for a new store

located in Ponce, Puerto Rico.

Power

Puerto Rico Electrical Authority

Gas Insulated Substation (San Juan, PR) - 15,000 SF electrical

substation

Water/Wastewater

City of Grand Rapids, MI

Waste Water Treatment Facility Expansion - Expansion of digester

and sludge process facilities.

Town of Stickney, IL.

Waste Water Treatment Facility Expansion

Abbot Laboratories

Wastewater Treatment Expansion (North Chicago, IL)- Provided

general arrangement and design for the installation of a new

filter press to expand WWT capabilities.

Parking

City of Chicago, IL.

Grant Park North and South Garage Renovation - Relocating and

updating existing garage operations and support facilities and

renovation of entrances and exits.

Miscellaneous

Duchossois Industries

Anechoic Chamber Design- Provided design and construction contract

documents for a 200SF Anechoic Chamber for sound and vibration

product development testing.

Abbott Laboratories

Freezer Storage (North Chicago, IL.)- A new 1,000 S.F. exterior

freezer storage building.

REFERENCES

Additional professional references are available upon request



Contact this candidate