Post Job Free
Sign in

Engineer Design

Location:
Saint Louis, MO, 63101
Posted:
September 07, 2010

Contact this candidate

Resume:

ANTHONY A. OSUMA, P.E.

**** ***** **** ******, ***. E

St. Louis, Mo 63101

E-Mail: *********@*******.***

Phone: 314-***-****(Cellular)

OBJECTIVE: To obtain a challenging position in your company that will allow me to utilize

and further develop my engineering knowledge and skills.

EDUCATION: Bachelor of Science in Mechanical Engineering, June 1998.

University of Alabama at Birmingham, Birmingham, Alabama.

Registered Professional Engineer, State of Missouri – Active.

PROFESSIONAL Professional Engineer, State of Missouri.

REGISTRATION: PE License No. 200-***-****.

EXPERIENCE: Parsons Brinckerhoff, Inc., October 2008 – March 2010.

Job Title: Sr. Mechanical Project Engineer.

Project coordination duties; design of HVAC systems for transportation facilities.

Preliminary engineering for Transit Facilities and preparation of construction

documents.

HVAC heating and cooling load calculations, energy modeling for LEED

complaint buildings.

Specifications review and editing.

Review of shop drawings and response to RFIs and other construction-related

matters.

Attend and participate in design and construction planning meetings.

Clark, Richardson and Biskup Consulting Engineers, Incorporated, October

2006 – October 2008.

Job Title: HVAC/Process Mechanical Project Engineer.

Design of HVAC systems for pharmaceutical facilities and clean rooms.

Preparation of construction documents, P&IDs and controls diagrams.

HVAC heating and cooling load calculations.

Specifications review and editing.

Review of shop drawings and response to RFIs and other construction-related

matters.

Attend and participate in design and construction planning meetings.

Webb Engineering Services, Incorporated, October 2001 – October 2006.

Job Title: HVAC Mechanical Project Engineer.

Design, project and construction management of HVAC projects for mid-size buildings.

Duties include conceptual design; specification writing including DDC controls

specifications, energy calculations, and detailed documentations during design

and construction phases of projects. Ductwork design and layout of variable and

constant air volume systems that utilize air handling, terminal units and energy

recovery units. Mechanical room equipment and hydronic piping layout and

sizing of steam and cooling condensate piping; steam, hot and chilled water

piping systems.

Feasibility studies, field analyses and estimating for upgrade and conversion of

existing HVAC systems. Review and editing of specifications to meet scope of

design for commercial buildings. Light supervision of entry-level HVAC

designers. Also possess minimal experience in the design of plumbing and fire

protection systems for commercial buildings.

HBE Corporation, October 1998 – October 2001.

Job Title: HVAC Project Engineer.

Design of HVAC systems for Health and Financial facilities.

Compute and analyze heating/cooling loads based on ASHRAE factor resources,

using industrially available computer programs.

Size and lay-out ductwork, hot water piping systems. Also, condensate and

refrigerant lines.

Energy calculation and evaluations. Review of contractor submittals based on

manufacturers cut sheet data.

Evaluation of field balance reports.

Utilize industrially available catalogues and programs for optimal selection of

equipment for the proper functioning of VAV and constant volume HVAC

systems. Edit job specifications and codes to meet the scope of banks and

financial institution projects; including automatic controls specifications.

Dixie Arc, Incorporated, November 1997 - June 1998.

Job Title: Mechanical Engineering Co-op.

Drafting (AutoCAD) duties, design and fabrication of contact pads, electric arc

furnaces, electrode holders, delta closures, induction and current-carrying cables

and bus tubes.

Selected Projects at Parsons Brinckerhoff, Inc.:

HVAC Design of Projects in the Transportation Industry;

February 2009- March 2010.

Toronto York Spadina Station Extension Project;

Project for TTC (Toronto Transit Commission) consisted of a new subway station

box comprising of an under-platform, platform, service, concourse and bus

platform level, as well as a surface facility comprising of a concourse and upper

concourse level. Participated in the design of the HVAC system for both facilities.

The HVAC design consisted of (4) modular type air handling units that provided

cooling to public areas in the stations by means of natural ventilation and

provided heating by means of integral electric modules. The air handling units

were of 9,000 CFM, 19,000 CFM, 25,000 CFM and 37,000 CFM capacities. Each

space served by an air handling unit was provided with ventilation air that met a

prescribed air changes per hour rate or the air change rate required to handle the

space’s internal heat loads, which ever was greater. Offices and other occupied

spaces within the facility were served by packaged air-source heat pumps, while

elevator machine rooms and escalator service rooms (on the platform level) were

served by industrial-grade packaged air-conditioning units. Ventilation air was

provided to mechanical rooms for each packaged air-conditioning unit and heat

pump by means of separated exhaust ventilation systems. There were (2) fire

fighter’s access stairs; one on the north and the other on the south extremities of

the station box facility, with each stair served by (1) 9000 CFM inline stair

pressurization fan system. An emergency power room (batter y room) was

maintained at a negative pressure by means of a duplex spark-resistant exhaust

fan. Task included performing load calculations for entire building utilizing

Carrier HAP and Trane Trace programs. The station system also consisted of

hoists for equipment lifting and location, as well as a monorail system.

300,000 sq. ft., (5) station box floors, (2) surface facility floors

October 2009 – November 2009.

Mammoth Cave Visitors Center, Phase 2;

Coordinated HVAC design around architectural features to meet special

requirements of museum building. Building consisted of (2) floors and a platform

level. Designed VAV system comprising of a 40,000 CFM VAV air handling unit

and several VAV boxes serving building zones. Zone heating was furnished by

electric reheat coils in the boxes. Designed ductwork and chilled water piping

sizing and layout. Chilled water piping was connected to existing chiller also

serving existing portion of museum building.

50,000 sq. ft., (3) floors.

October 2008 – July 2009.

Honolulu High Capacity Transit Corridor Project, Honolulu, Hawaii:

Participated in the mechanical engineering and preliminary design for HVAC

systems for various buildings that are part of the planned new transit system for

Honolulu. These buildings include stations, communications buildings, transit

vehicle maintenance shops, vehicle storage yards, an operations control center,

traction power substations, and several multilevel parking structures. The stations

are of five different basic configurations, some aerial stations of 2 or 3 levels, and

others at grade and below grade level. This project utilized the Trace 700 program

version 6.1.2 to calculate the savings in energy between the proposed design

buildings and a baseline buildings based on LEED –NC v2.1 EA Credit 1 and

ASHRAE 90.1-2004.

Selected Projects at CRB Consulting Engineers, Inc.:

HVAC, Plumbing, Fire Protection and Process and Clean Utility Design of

Projects in the Pharmaceutical Industry;

February 2007 – July 2008.

Covidien/Mallinkrodt – B5 Project Orange Renovation and Addition

St. Louis, Missouri.

DEA classified project. Designed a new stand-alone compressed air system to

handle the requirements of automated and manual stick inserters, blister packers,

cartoners, lable printers, as well as other associated process equipment. Designed

system with stringent air change, air pressurization, temperature and humidity

control requirements utilizing a direct expansion split (Munters) dehumidification

unit in conjunction with a recirculating air handling unit.

3,200 sq. ft., (2) floor

December 2007 – February 2008.

Covidien/Mallinkrodt – B96 Peptide Expansion

St. Louis, Missouri.

Design of clean rooms to handle the moisture and heat generation resulting from

the lyophilization and isolation of peptide APIs. Designed HVAC system with 4-

pipe chilled and heating hot water systems for custom air handling units to

maintain air change rates, temperature, humidity and air pressurization within

clean rooms per ISO requirements. Wrote specifications for biosafety cabinets,

vented balanced safety enclosures, fume hoods, chemical solvent hoods and inert-

gas glove boxes.

7,500 sq. ft., (2) floors.

September 2007 – December 2007.

Covidien/Mallinkrodt – Addition to R&D Pilot Plant

Webster Groves, Missouri.

Designed new constant volume HVAC system with terminal reheats coils for

facility. All supply and exhaust air devices incorporated the use of terminal HEPA

filters to eliminate contamination to product, users and public. Project scope also

involved the design of a duct collection system. Design included a new primary-

secondary chilled water pumping system, cooling tower water for water cooled

chillers, steam generation system to accommodate system terminal reheat coils,

air handling unit preheat coils, an air handling unit humidification steam

generation system and cleaning of USP tanks.

13,270 sq. ft., (2) floors.

June 2007 – September 2007.

Sanofi Pasteur – B57 Formulation

Swiftwater, Pennsylvania.

Assited client in a conceptual design study to isolate and recommend design

strategy solutions to airflow pressurization and balancing problems associated

with certain ISO classified rooms with facility building.

20,000 sq. ft., (2) floors.

April 2007 – May 2007.

Anika Therapeutics – Bedford Manufacturing Expansion

Woburn, Massachusetts.

Design of process mechanical systems to serve process tank systems. Piping

design include nitrogen, compressed air, water for injection, di-ionized water,

reverse osmosis water, clean steam, plant steam and condensate piping systems.

35,000 sq. ft. (1) floor.

February 2007 – April 2007.

Schering-Plough Coppertone Continuous Spray

Cleveland, Tennessee.

HVAC design of compounding packaging, aerosol packaging and bag-on-valve

packaging rooms for the manufacture of alcohol-based aerosol sprays.

Design of spaces based on air changes to meet ISO requirements. Skid-mounted

Temperature Control Modules utilizing chilled water and heating hot water to

maintain the temperature of a process water-loop serving (3) process tank jackets.

Design of foam forming (fire protection) systems for alcohol and hydrocarbons,

and design of Process Utility Piping to meet needs of existing facility.

40,000 sq. ft., (1) floor.

October 2006 – December 2006.

KV Research Center.

St. Louis, Missouri.

HVAC design of clean rooms and airlocks based on ISO classifications to meet the needs of this

pharmaceutical facility;

Design of Process and Clean Utility Piping.

40,000 sq. ft., (1) floor.

November 2006 – December 2006.

Sigma Building T–East cGMP Expansion

St. Louis, Missouri.

Calculated space load requirement for existing building floor based on air

changes, cleanroom classifications, relative space pressurization, temperature and

humidity requirements. Made recommendation for rebalancing of system based on

airflows determined from new load calculations. Specified and recommended

alarm sensors with the established accuracy limits of the system in order to

eliminate constant alarm setoffs.

11,000 sq. ft, (1) floor.

November 2006 – December 2006.

ZLB Behring, LLC.

Kankakee, Illinois.

Calculated space load requirements for two air handling units that serve spaces

within a single existing floor based on air changes, cleanroom classifications,

relative space pressurization, temperature and humidity requirements. Rezoned

areas of the floor space to better serve new usage requirements. Made

recommendation for rebalancing of system based on airflows determined from

new load calculations. Recalibration of sensor and alarms to meet new established

space airflows and room pressurization differentials.

3,000 sq. ft, (1) floor.

November 2006 – December 2006.

Pfizer Site ODC Chiller Replacement Project.

Wrote specifications for a single 150 HP compressor, dual-evaporator, 69-Ton low

temperature chiller that utilized R507a as refrigerant utilized 50% methanol

solution as cooler fluid and utilized well water as condenser fluid.

December 2006 – January 2007.

Bioport Corporation

Lansing, Michigan.

Review and assisted in compiling a comprehensive instrumentation and controls

Points list for PLC and BAS systems comprising of a Motor Control Center, (10)

Digital Controllers and 1,000 + pneumatically and electronically-operated valves.

75,000 sq. ft., (3) floors.

Selected Projects at Webb Engineering Services, Inc.:

July 2006 – September 2006.

Gateway High School - Animal Laboratory.

St. Louis, Missouri.

2,800 sq. ft., (1) floor.

May 2006 – April 2006.

Bank Star One – HH Facility;

Air Conditioning and Renovation

Camden County, Missouri.

11,702 sq. ft., (2) floors.

March 2006 – April 2006.

First State Community Bank

Terre-Du-Lac, Missouri

3,650 sq. ft., (1) floor.

February 2006 – June 2006.

Air Conditioning and Renovation of

Student Center / Brady Commons Expansion

University of Missouri Columbia.

Columbia, Missouri.

VAV system, 4-pipe hydronic system, chiller / boiler systems, DDC controls.

47,197 sq. ft., (3) floors.

December 2005 – June 2006.

Missouri School for the Deaf;

Fulton, Missouri.

Air Conditioning and Renovation of Pool and Gymnasium.

9,800 sq. ft., (1) floor.

December 2004 – February 2005.

Miscellaneous SCB Projects - Plans and Specifications Review for

Heideman Associates, Inc.

August 2005 - October 2005.

Enterprise Rent-A-Car.

O'Fallon, Illinois.

4,520 sq. ft., (1) floor.

August 2004 - April 2005.

Lincoln University St. Louis Cooperative Extension Program.

St. Louis Missouri.

4,773 sq. ft., (1) floor.

February 2004 – April 2004.

4th Floor Renovation and Air Conditioning for the

Met Center, SSD - Technical Education Program.

St. Louis, Missouri.

9, 410 sq. ft., (1) floor.

January 2003 - March 2003.

Renovation and Air Conditioning of

Oak Hill Elementary School - St. Louis Public Schools District

St. Louis, Missouri.

65,000 sq. ft., (2) floors.

November 2002 - January 2003.

Renovation and Air Conditioning of Anthony Hall,

Lincoln University Jefferson City,

Missouri.

70,000 sq. ft., (4) floors.

February 2002 - December 2002.

Air Conditioning of Addition to

Herbert Hoover Boys' and Girls' Club

St Louis, Missouri.

40,000 sq. ft (2) floors.

August 2002 - November 2002.

East St. Louis Fire House #422

East St. Louis, Missouri.

35,000 sq. ft., (2) floors.

January 2002 - March 2002.

Renovation and Air Conditioning of

Yeatman Middle School - St. Louis Public Schools District

St. Louis, Missouri.

75,000 sq. ft., (2) floors.

November 2001 - January 2002.

Alton Memorial Hospital Renovation and

Addition to Air Conditioning System for

Twin Rivers MRI.

Alton, Illinois.

30,000 sq. ft., (1) floor.

October 2001 – October 2004.

Lambert St. Louis International Airport

Noise Mitigation Program.

St. Louis, Missouri.

Program involves the replacement of window-mounted packaged terminal air-

conditioners with residential grade split system air-conditioners in homes around

the airport.

Duties involve monitoring the work of the HVAC/electrical subcontractors and

coordinating the HVAC/electrical installation.

Attend survey visits of homes to determine existing conditions prior to designing

homes. Produce 8.5"x11" schematic drawings in AutoCAD 2002 format that

describes the installation scope for each home. Schematics define equipment

sizes, duct sizes and layout and electrical panel/feed upgrades information.

Review contractor's shop drawings based on schematic designs.

Documentation of punch lists and owner acceptance forms.

Brief home owners on warranty information.

Fortnightly reports to the LSIA Airport Authority on the progress of various

aspects of the program.

Selected Projects at HBE Corporation:

Solely responsible for the entire HVAC design and Computer-aided drafting

of the following bank projects;

November 2000 - December 2000.

Cornell Fingerlakes Credit Union.

Village of Lansing, New York.

4,000 sq. ft., (1) floor.

March 2000 - May 2000.

Peoples' Community Credit Union.

Amarillo, Texas.

14,000 sq. ft., (1) floor.

January 2000 - March 2000.

Core One Credit Union.

Columbus, Ohio.

7,400 sq. ft., (2) floors.

Worked with a team of engineers in designing the following selected projects;

July 2000 - September 2000.

Kimball County Hospital

Kimball, Nebraska.

150, 000 sq. ft., (3) floors.

April 2000 - June 2000.

Anheuser - Busch Employees' Credit Union.

St. Louis, Missouri.

65,000 sq. ft. (2) floors.

August 1999 – October 1999

FAA Employees’ Credit Union

Oklahoma City, Oklahoma.

15,000 sq. ft., (2) floors.

SKILLS: AutoCAD 2010, Microsoft Word 2007, Microsoft Excel 2007, Carrier Hourly

Analysis Program Version 4.20, Elite Software Program, H-Tools Program,

Trane TOPPS Program.

PROFESSIONAL

AFFILIATIONS: American Society of Heating, Refrigeration and Air Conditioning Engineers.

REFERENCES: Available upon request.



Contact this candidate