Post Job Free
Sign in

Construction High School

Location:
Palm Bay, FL, 32908
Posted:
September 07, 2010

Contact this candidate

Resume:

*** ****** **. ** **** Bay, Florida *****

321-***-****

Thomas a. godin

Skills

Symon panel wall system

Layout

Form

Reinforcement

Pour & Finish

Slab on grade

Concrete expansion joint repairs

Trench drain systems

Drypack

Remodeling & Renovations of residential and commercial

properties (interior & exterior)

Brush & roller painting

Masonry

Carpentry

Docks & Seawalls

Experience

2007-2010: Harry's Haul

Supervised as many as 30 men on a (1) year salvage contract in

a defunct AT&T research & clean room assembly plant

Miscellaneous controlled demolition

2003-2007: A1A Marine Construction

Construct docks & seawalls ranging from small wood/plastic

seawall in canals with wood/aluminum caps to 12' panels in the

Indian and Banana Rivers with poured concrete caps with

designed and continuous footing or individual "deadmen"

tiebacks every 8'-10' waterjet or rock drills used for docks

Construct docks ranged from parallel to shoreline to 300' into

river; many with boat slips some with rope handrails and some

with wood

Construct docks with built in benches or combination

bench/storage box and some fish cleaning tables

Construct dock with slips had boatlifts mostly cradle lift's

one elevator lift

2002-2003: Show Ready/ Mid-Atlantic Renovation

Traveled all over the state doing renovations and remodeling

for commercial properties

1995-2002: Hersh Construction, Inc. / COC, Inc.

Traveled all over the United States doing total apartment

complex renovations ( interior & exterior)

Supervising crew of as many as 6 to 12 men

Repairs were on such balconies, handrail systems, stairs, and

siding

Replaced second and third floors, exterior walls, and windows

at Lakeside North apartment complex

Entire gut outs such as carpets to cabinets, drywall, doors,

and fixtures

The Chimneys, English Hills, Winter Wood at Sharon in

Charlotte, NC, The Hollow's, Tamarind at Stonebridge in

Columbia, SC, Wynbridge, & Lexington in Memphis, TN,

Canterbury in Germantown, MD, Asbury Commons & Summit at Lenox

in Atlanta, Ga, Auver's Village in Orlando, and Lakeside North

in Altamonte Springs, Florida and many more

1994-1995: HLS

General contractor for concrete form work, pour and cement

finishing

Footings, slab on grade, and walls at Disney's All Star Resort

and Tower of Terror at Disney studios

1984-1994: RM Construction

General contractor, lead carpenter, foreman, and supervisor

for hotel renovations and general contracting at Epcot on

Disney property

Construct light pole bases at Disney's casting center parking

lots

Concrete expansion joint repairs over tunnel system at Magic

Kingdom

Trench drain system (new construction and retro fit)

Grout (drypack) base plates and continual flow grout system

under base pads for simulators at Epcot attractions

Form, pour and finish the stage floor system with all the

pits, trenches, machine gun hits, associated with Indiana

Jones' attraction at Disney studio

Form and pour box culvert under John Young Pkwy

Remodeled many rooms at Dolphin Hotel, Grand Floridian, and

Polynesian (metal stud drywall, insulation, doors, and frames,

etc)

Electrical duct band ( 4050ft.), manholes every 500' or pull

stations, 36 6" pipe into and then out of the future Dixie

Landing and form, pour, and finish red concrete to signify

electricity

Installed culture stone face on bridges at Dixie Landing at

Disney

Remodeled many stores in the Disney village

Installed FRP panels throughout kitchen, hallways, dining

areas, and bathrooms at Dolphin Hotel and Crocket's dining

hall at Fort Wilderness campground

Form, pour, and finish black concrete sidewalks and golf cart

pathways at Fort Wilderness campground and a couple of Disney

golf courses

Remodeled barn stalls and corrals at Fort Wilderness

campground

Pour and finish product called Anvil Top at Grand Floridian

Hotel at Disney and " thick over prepared concrete area

Brush and roller painting

Used many specialty cementicious products such as accelerators

and high strength

1982-1984: Pychock Construction

Framed houses

1981-1982: TYCO (Palmer Smith's sister company)

Armwood High School in Tampa (installation of all exterior

steel doors, crash bars, thresholds, door closures, and locks,

etc)

1977-1981: Palmer Smith Contracting

Began apprentice for concrete footings, floors, walls, general

contracting construction and finishing

Layout for parking lots, footings, anchor bolts, walls, and

set elevations

Carpenter assistant; Form work, footings, slab on grade, self

supporting decks and walls

Concrete Laborer; Set up pumps that went into buildings, used

concrete buckets with cranes, manual Georgia buggy and gas

powered on placement crew

Wayne County Community College, Downtown Detroit and Taylor,

Oakland County Community College, College Health and Science

Center, Martin Luther King Jr. High in Detroit, American

National Red Cross, GM Detroit diesel engineering test complex

and engine manufacturing building, GM proving grounds, and GM

tech center

Job Foreman; starting and completing jobs at Epcot and Disney

Corp. at the France, Japan, China, and the Horizons pavilion

Supervised crews of 20

Laborer foreman for concrete

Symon panel wall system, 2'x8', 2x4 frame footing panel ply

face, involved in all phases

Layout, form, reinforcement, pour, finish, and slab on grade

Completed entire promenade including walkways, planters,

benches, curbs, and light bases

Employment

2007-2010 Harry's haul Orlando, Florida

Superintendent

demolition

2007 ALDERMAN DEVELOPMENT ORLANDO, FLORIDA

LEAD CARPENTER

Implementing teardowns and rebuilding

Additions and renovations to residential and commercial structures

2003-2007 A1A Marine Construction MERRITT ISLAND, FLA

Job Foreman/Superintendent

Supervised as many as 8 employees in the tear down/reconstruction of docks,

seawalls, boat housing, and mechanical lifts

Worked closely with the clients on each project for design and satisfaction

of project

2002-2003 Show Ready/Mid-Atlantic Renovation ORLANDO, FLORIDA

Owner/Subcontractor

Apartment renovations

Drywall, electrical, fixture removal and replacement, bathroom tear outs

and remodeling, prep and painting, carpet tear outs, flooring replacement,

tile work, kitchen remodeling, interior/exterior framework

1995-2002 Hersh Construction, Inc. /COC, Inc. ATLANTA, GEORGIA

Superintendent/ Job Foreman

Traveled throughout the United States as jobs bid accepted for investment

companies to upgrade real estate purchases

Total apartment renovations for investors, including interior/exterior

Multi-home renovations for investors

Excelled in time line completions

EDUCATION

Holly High School Holly, MI

Diploma



Contact this candidate