*** ****** **. ** **** Bay, Florida *****
Thomas a. godin
Skills
Symon panel wall system
Layout
Form
Reinforcement
Pour & Finish
Slab on grade
Concrete expansion joint repairs
Trench drain systems
Drypack
Remodeling & Renovations of residential and commercial
properties (interior & exterior)
Brush & roller painting
Masonry
Carpentry
Docks & Seawalls
Experience
2007-2010: Harry's Haul
Supervised as many as 30 men on a (1) year salvage contract in
a defunct AT&T research & clean room assembly plant
Miscellaneous controlled demolition
2003-2007: A1A Marine Construction
Construct docks & seawalls ranging from small wood/plastic
seawall in canals with wood/aluminum caps to 12' panels in the
Indian and Banana Rivers with poured concrete caps with
designed and continuous footing or individual "deadmen"
tiebacks every 8'-10' waterjet or rock drills used for docks
Construct docks ranged from parallel to shoreline to 300' into
river; many with boat slips some with rope handrails and some
with wood
Construct docks with built in benches or combination
bench/storage box and some fish cleaning tables
Construct dock with slips had boatlifts mostly cradle lift's
one elevator lift
2002-2003: Show Ready/ Mid-Atlantic Renovation
Traveled all over the state doing renovations and remodeling
for commercial properties
1995-2002: Hersh Construction, Inc. / COC, Inc.
Traveled all over the United States doing total apartment
complex renovations ( interior & exterior)
Supervising crew of as many as 6 to 12 men
Repairs were on such balconies, handrail systems, stairs, and
siding
Replaced second and third floors, exterior walls, and windows
at Lakeside North apartment complex
Entire gut outs such as carpets to cabinets, drywall, doors,
and fixtures
The Chimneys, English Hills, Winter Wood at Sharon in
Charlotte, NC, The Hollow's, Tamarind at Stonebridge in
Columbia, SC, Wynbridge, & Lexington in Memphis, TN,
Canterbury in Germantown, MD, Asbury Commons & Summit at Lenox
in Atlanta, Ga, Auver's Village in Orlando, and Lakeside North
in Altamonte Springs, Florida and many more
1994-1995: HLS
General contractor for concrete form work, pour and cement
finishing
Footings, slab on grade, and walls at Disney's All Star Resort
and Tower of Terror at Disney studios
1984-1994: RM Construction
General contractor, lead carpenter, foreman, and supervisor
for hotel renovations and general contracting at Epcot on
Disney property
Construct light pole bases at Disney's casting center parking
lots
Concrete expansion joint repairs over tunnel system at Magic
Kingdom
Trench drain system (new construction and retro fit)
Grout (drypack) base plates and continual flow grout system
under base pads for simulators at Epcot attractions
Form, pour and finish the stage floor system with all the
pits, trenches, machine gun hits, associated with Indiana
Jones' attraction at Disney studio
Form and pour box culvert under John Young Pkwy
Remodeled many rooms at Dolphin Hotel, Grand Floridian, and
Polynesian (metal stud drywall, insulation, doors, and frames,
etc)
Electrical duct band ( 4050ft.), manholes every 500' or pull
stations, 36 6" pipe into and then out of the future Dixie
Landing and form, pour, and finish red concrete to signify
electricity
Installed culture stone face on bridges at Dixie Landing at
Disney
Remodeled many stores in the Disney village
Installed FRP panels throughout kitchen, hallways, dining
areas, and bathrooms at Dolphin Hotel and Crocket's dining
hall at Fort Wilderness campground
Form, pour, and finish black concrete sidewalks and golf cart
pathways at Fort Wilderness campground and a couple of Disney
golf courses
Remodeled barn stalls and corrals at Fort Wilderness
campground
Pour and finish product called Anvil Top at Grand Floridian
Hotel at Disney and " thick over prepared concrete area
Brush and roller painting
Used many specialty cementicious products such as accelerators
and high strength
1982-1984: Pychock Construction
Framed houses
1981-1982: TYCO (Palmer Smith's sister company)
Armwood High School in Tampa (installation of all exterior
steel doors, crash bars, thresholds, door closures, and locks,
etc)
1977-1981: Palmer Smith Contracting
Began apprentice for concrete footings, floors, walls, general
contracting construction and finishing
Layout for parking lots, footings, anchor bolts, walls, and
set elevations
Carpenter assistant; Form work, footings, slab on grade, self
supporting decks and walls
Concrete Laborer; Set up pumps that went into buildings, used
concrete buckets with cranes, manual Georgia buggy and gas
powered on placement crew
Wayne County Community College, Downtown Detroit and Taylor,
Oakland County Community College, College Health and Science
Center, Martin Luther King Jr. High in Detroit, American
National Red Cross, GM Detroit diesel engineering test complex
and engine manufacturing building, GM proving grounds, and GM
tech center
Job Foreman; starting and completing jobs at Epcot and Disney
Corp. at the France, Japan, China, and the Horizons pavilion
Supervised crews of 20
Laborer foreman for concrete
Symon panel wall system, 2'x8', 2x4 frame footing panel ply
face, involved in all phases
Layout, form, reinforcement, pour, finish, and slab on grade
Completed entire promenade including walkways, planters,
benches, curbs, and light bases
Employment
2007-2010 Harry's haul Orlando, Florida
Superintendent
demolition
2007 ALDERMAN DEVELOPMENT ORLANDO, FLORIDA
LEAD CARPENTER
Implementing teardowns and rebuilding
Additions and renovations to residential and commercial structures
2003-2007 A1A Marine Construction MERRITT ISLAND, FLA
Job Foreman/Superintendent
Supervised as many as 8 employees in the tear down/reconstruction of docks,
seawalls, boat housing, and mechanical lifts
Worked closely with the clients on each project for design and satisfaction
of project
2002-2003 Show Ready/Mid-Atlantic Renovation ORLANDO, FLORIDA
Owner/Subcontractor
Apartment renovations
Drywall, electrical, fixture removal and replacement, bathroom tear outs
and remodeling, prep and painting, carpet tear outs, flooring replacement,
tile work, kitchen remodeling, interior/exterior framework
1995-2002 Hersh Construction, Inc. /COC, Inc. ATLANTA, GEORGIA
Superintendent/ Job Foreman
Traveled throughout the United States as jobs bid accepted for investment
companies to upgrade real estate purchases
Total apartment renovations for investors, including interior/exterior
Multi-home renovations for investors
Excelled in time line completions
EDUCATION
Holly High School Holly, MI
Diploma