Yoni Arrieta
***** ** *** **** *** ****, Miami, FL 33196
***********@*****.***. US Citizen
Cell Phone :850-***-****
EDUCATION
Master of Science in Engineering Management
Washington State University, Everett, WA Dec 2011
Lean-Six Sigma Black Belt Certificate
Villanova University, Everett, WA. Oct 2010
Certificate in Constraint Management
Washington State University, Everett, WA, July 2007
Master of Science in Industrial Engineering, Manufacturing Engineering GPA:
3.697
Florida International University, Miami, FL, April 2005.
Bachelor of Science in Industrial Engineering GPA: 3.96/5.00
Corporacion Universitaria Technologica de Bolivar, Cartagena, Colombia Aug.
2001.
WORK EXPERIENCE
Lean Manufacturing Industrial Engineer, Beckman Coulter, Miami, Fl, 6/16/08-
Present
. Lead the implementation of Lean Manufacturing/Six-Sigma principles in
the assembly process of hematology equipments
. Conducted simulation training in order to facilitate the
implementation of Lean Manufacturing principles in the assembly
process.
. Conducted Lean Manufacturing training to associates in order to
increase lean awareness among associates and managers.
. Provided coaching and guidance to assembly process supervisors during
the implementation of Lean Manufacturing/Six-Sigma philosophy
. Designed pull systems, flow analysis, cell designs and inventory
reduction initiatives in order to reduce cost, lead time and quality
in hematology and flow Cytometry assembly lines
. Reduced assembly lead time in LH 500 manufacturing lines major sub-
assemblies, and final assembly by 70%
. Improved space utilization in LH 500 manufacturing lines by 62%
implementing an innovative flexible cell design
. Led and Implemented work place organization, 5's and visual system in
the assembly lines in order to simplify material delivery, reduce
point of use inventory, reduce cycle time and eliminate waste from
process stations.
. Developed value stream maps for Hematology and Cytometry assembly
lines including raw materials inventory, work in process, finish good
inventory to identify non-value added tasks and bottlenecks that
increased assembly lead time in order to implement the initiative of
Build to Install.
. Implemented a synchronous manufacturing schedule in the assembly
process of the LH 500 hematology line with 50% lead time reduction in
major sub-assemblies
. Implemented and combined the philosophies of constraint management,
Lean, Six-sigma, Quick response manufacturing and agility into one
synergist manufacturing strategy that led to reduction of cost by
$700,000 a year per assembly line.
. Implemented the principles of working in parallel and quick
changeovers that led to the development and implementation of flexible
manufacturing systems and lead time reductions
. Developed and implemented jigs and fixtures (poka yoke) to avoid
errors in the operations of cutting and assembling of tubing sub-
assemblies.
. Developed and implemented a level load schedule for assemblers to
synchronize the flow of work in process (single piece flow) from
flexible cells to the pace of the final assembly process.
. Determined and implemented point of use kanban inventory levels that
were tied to the continuous replenishment of material from the
warehouse to assembly line to avoid stoppages and shortages
Process Improvement Engineer, Boeing Commercial Airplanes, Everett, WA,
07/22/2005-5/29/2008
.Led the implementation of Synchronous Manufacturing principles in the
Final Assembly area of the 747 production line.
.Led the implementation of Critical Chain Project Management in the Final
Assembly area of the 747 production line
.Worked in Kaizen events in the Wing/Gear area of the 747 production line
to improve material delivery and implemented visual control systems in
different areas of the 747 Gear/Wing area assembly shop.
. Implemented the principles of 5's and manufacturing cells in the nose
gear area to eliminate non-value added activities
.Led the facilitation of employee involvement program in the Final Assembly
Industrial engineering group.
.Build and maintained the production schedule for the assembly process of
the 787 airplane.
.Developed a constraint based schedule in the ERC Job shop that resulted in
elimination of space constraints, bottlenecks and better synchronization of
resources.
. Implemented buffer management visual system to identify assembly process
progress as well as to guide the tactical implementations of Lean-Six-sigma
.Developed and implemented material delivery kits that enhanced the visual
management of sub-components as well as the reduction of errors in the
operations of picking and assembling.
Process Excellent Engineer, Cordis Corporation, Miami, FL, 9/06/2004-
07/13/2005
.Led the implementation of a defect reporting system in Cordis
manufacturing areas.
.Developed an infrastructure to identify and prioritize defects' reduction
initiatives in different manufacturing areas.
.Coached in how to properly use a defect reporting system to engineers and
supervisors in all manufacturing areas.
Manufacturing Engineer, General Electric-Wind Energy, Pensacola, FL 1/05/04-
8/27/04
.Developed the construction of a bill of material, drawings and
specifications in the design of wind blades.
.Developed product specification analysis for the redesign of a component
used in the process of wind blades.
.Evaluated process capability of different subcomponents used in the
manufacturing process of wind blades.
.Conducted facility layout analysis to improve flow of material and people
in the assembly process.
.Redesigned a platform using ergonomic principles to reduce the incidence
of accidents and awkward postures.
.Designed and implemented Kanban and JIT principles for sub-assembly
workstations.
.Implemented lean manufacturing principles of work place organization, 5's,
quick changeovers, standard work, tackt time in the machine head sub-
stations assembly process.
.Implemented visual kanban system to signal material replenishment from
warehouse to assembly head stations to synchronize material flow, reduce
space and raw material consumption.
Operation Logistics Intern, ABC Distributing, LLC, Miami, FL, 7/2003-
12/23/03
.Conducted cost analysis to evaluate the implementation of new raw
materials in the packaging process.
.Diagnosed and evaluated production line capacity in order to improve
throughput
.Implemented statistic control tools in the production process to reduce
the number of defects.
.Conducted work design and facility layout studies to determine the most
appropriate location for new workstations.
ACTIVITIES
.Delta Epsilon Iota Academic Honors Society.
.Society of Hispanic Professional Engineers.
.Boeing Hispanic Employee Network
.Institute of Industrial Engineer
SKILLS
.Computer: Excel, Power Point, Microsoft Word, AutoCAD, MINITAB, PS8
.Languages: Fluent in Spanish and English.
.2009 STERLING COMPETITION CHAMPIONS, Orlando Fl
.19th Annual Performance Excellence Showcase Region 6 Winner.
.Patent Number 08ID0093: Agile Manufacturing and Reconfigurable Multitask
Work-Station
. Presented at Industrial Engineer Annual conference abstract No 66:
Agile Manufacturing and Reconfigurable Multitask Work-cells