David B. Beuoy
Bay City, TX. *****
Phone 409-***-****
E-Mail - abldea@r.postjobfree.com
Summary 19 years program manager/project manager
experience including
global (Europe, Asia Pacific and South
America)
16 years SAP project director/program
manager experience
Upgrades and installations in 4.6c,
4.7, 5.0 and 6.0
New installations ERP, SCM, HCM,
FI/CO, BI/BW and CRM
Unicode conversion to 5.1 UCD, MDM
Experience
Project Director (For Owners)
Nov. 2008 to Present
South Texas Project Nuclear Operating Center (STPNOC)
Wadsworth, TX
Nuclear Power Generation
Project Director for the new installation of
SAP 6.0 ECC - Enhancement 4- replacing the
Oracle Forms system and Peoplesoft HR,
Financials, SRM, CRM and work orders
FI/CO, HCM, SCM, SRM, APO, SD, EH&S,and PM
were installed.
Utilized ASAP methodology and Solution Manager
7.0
Utilized IDS Scheer ARIS and IBM Telelogic
Doors for business process modeling.
Upgrade of hardware and infrastructure to a 2
terabyte system.
Responsible for the development and control
of the budget of 130 million dollars.
Responsible for the development of the
manpower requirements of a 96 people staff.
(55 STP and 41 PwC staff)
Responsible for the negotiation and execution
of the contract with
Pricewaterhouse Coopers (PwC).
Reported to the owner's steering committee
which include the 3 CIO's.
Project Director/Program Manager
Sept. 2007 to Nov. 2008
Chandra Tech - City of San Antonio, TX.
San Antonio, TX.
7th largest City Government
Program Manager for the upgrade of SAP modules
from 4.7 to 6.0 ECC, APO, FI/CO,
SD with IDOC, AP, AR, TR, CFM, FA, PS, GL
BI/BW, Business Objects with
Crystal Reports, MM and HCM which was composed
of HRIS, ECM, PA/PM, OM. TM,
CE, T&E and CATS. TM and GM.
Program Manager for the new installation of
SAP modules (Netweaver 7.0,
E-recruitment, E-procurement, LMS, MDM, ESS,
MSS and PM (with VMS),
Utilized IBM Cognos for BI/BW Management
Converted database with over 10 terabytes to
5.1 UCD Unicode.
Converted existing payroll system to SAP HR
Payroll.
Utilized SAP PS and Microsoft Project for
project planning and control
Used Solution Manager for the depository of
all documents, reference material and notes.
Used Open Text and Kofax VRS for image
processing.
Used Solutions Manager 7.0 for SAP
implementation.
Controlled project budgets totaling over 8
million dollars.
Managed 35-40 people including 4 project
managers.
Liaison between department directors and CIO
Executive Program Manager/Project Director
Sept. 2006 to Sept. 2007
Deloitte Consulting - Cellular South
Jackson, MS.
Wireless Phone Service Provider
Assigned to the PMO as project manager
supervisor.
Program Manager for negotiations with the State
of Mississippi for the contract (RFP) to
provide cellular phone service to state
employees including emergency response and the
Implementation of the Wireless Priority System
(WPS).
Program Manager for the upgrade of Oracle to
11g complete life cycle.
Program Manager for the installation of SAP
FI/CO with TR, CFM and OTC complete
life cycle.
Utilized TCO analysis and modeling for pricing
of phones and services.
Integrated BPM Systems POS and Inventory
Management with SAP,
Program Manager for the development of the B2B
website using J2EE.
Program Manager for the new installation of SAP
CRM with IS Retail.
Program Manager for the installation of HP-
Mercury Business Process Testing.
Program Manager for installation of SAP OTC,SD
(with Vistex add on)
and RMCA to replace Convergys/Atlys billing and
sales orders.
Program Manager for the installation of SAP HR
with Payroll, TM, ECM, OM, ESS and
MSS.
Program Manager for installation of SAP SCM 6.0
including WM, SRM, IDOC, IM, IV
and logistics module.
Program Manager for the installation of
Netweaver 7.0 and BO
Program Manager for 18 million dollar upgrade
of switch gear and backend operations.
Implemented Agile CMMI for process improvement.
Implemented COTS for routine applications.
Used Sabrix tax software.
Co-ordinated schedule planning with outside
contractors.
Project team was from 12 to 26 people.
Used Primavera 5.0 and Teamplay for project
planning and control.
Used SAP PS and Solution Manager 4.0 for the
SAP portion of the project.
Controlled project budgets and timelines.
Senior Program Manager
Feb. 2003 to Sept. 2006
Volt Information Sciences - Caterpillar
Aurora, IL.
Products: Wheel Loaders, Excavators,
Forest Product
Machinery
Senior Program Manager for new product
introduction (NPI) of medium
sized wheel loadersfor Asia Pacific from
design thru production including the Financial,
IT Plan (implementation, validation and
testing), Marketing Plan, Automated Sales CRM,
Engineering Plan and Production Plan. This
included the development of the goal
hierarchy and developing the IT hierarchy
blueprint.
The budget for this project was 155 million.
Managed 30-35 people on the project team
Responsible for all project planning and
implementation concerning medium wheel
loaders including responsibility for all
strategic sourcing.
Program Manager for the installation of SAP
Business Suite including: APO, PLM, HR,
ESS, MSS, SRM, MM, IM, IDOC, WM, IV, SD, SCM
(including SPP), FI/CO
(with TR, CFM, and OTC), BI/BW, BO,EH&S and PM
with VMS. Complete life cycle.
Used TCO modeling for pricing structure of wheel
loaders.
Program Manager for the conversion of binary
legacy files in SAP utilizing
LSMW.
Planned and implemented the business plan
lifecycle using Agile.
Used SAP ASAP methodology for the SAP portion of
the project.
Utilized Agile CMMI for process improvement.
Lead Project Manager for the installation of
Compuware QA Center suite of products for
Validation and testing.
Used Primavera P3 and 4.0-E/C and Teamplay
software for project planning and
scheduling.
Utilized six sigma standards for project
management.
Travelled to Europe (Belgium, France and
Germany) and South America
(Brazil and Argentina) for project planning,
implementation, testing and installation
Senior Program Manager
May 2000 to Feb. 2003
Volt Information Sciences - John Deere and Co.
Waterloo, IA.
Products: Tractors, Engines, Transmissions
and Transaxles
Senior Program Manager for South America
Business Unit
Managed 17-20 people on project team
Financial analysis of all assigned projects.
Implemented corporate business plan for
increasing market share.
Planned and implemented market strategy and move
of production from Germany and US
to Brazil and responsibility for strategic
sourcing. Stationed in Brasil (Porto Alegre and
Horizontina for 3 to 4 month s at a time.
Developed the goal hierarchy and the IT product
hierarchy for all 3 countries.
The Budget for this project was 96 million
dollars.
Lead Project Manager for the installation of
SAP CRM for sales
And call center automation.
Program Manager for the installation of SAP
Business Suite 4.7 including APO,
SCM (with SRM and I-2 logistics) and PM with
VMS
Negotiated contracts with outside vendors and
suppliers.
Used Microsoft Project Manager for project
management.
Used Six Sigma and PMBOK for project management
and Agile software for life cycle.
Travelled to Europe and South America to
implement the project.
Controlled cost of the project.
Senior Project Manager
April 1997 to April 2000
CDI Corp. - Rockwell Automotive
Oshkosh, WI. Products:
Drive axles, aluminum transfer cases, transmissions
Transmission gears, planetary gears, spiral bevel ring
and pinion gears for off highway equipment.
Senior Project Manager in Engineering Department.
Senior Project Manager for the moving of
production from Oshkosh, WI. to Osasco, Brasil.
Managed multiple projects using MS Project.
Financial analysis of all projects using TCO
analysis and modeling..
Responsible for updating and standardizing
drawings.
Worked with the design dept to implement changes
using Pro-E.
Scheduled new engineering and design assignments.
Used Primavera P3 and MS Project to manage
projects.
Senior Program Manager
June, 1991 to April. 1997
Volt Information Sciences - Caterpillar
Decatur, IL.
Products: Mining Machinery
Senior Project Manger in the Engineering Dept
Switched to the IT Dept in 1994.
Project Manager for installation of SAP WM, IM, IV
and I-2
Project Manager for the implementation of Maximo
Education
B.S. Mechanical Engineering
Purdue Univ.
West Lafayette, IN.
MBA - Finance
Indiana Univ.
Indianapolis, IN.
OTHER COURSES
IDS/Scheer - ARIS Business Modeling - STP
IBM Telelogic Doors - STP
Clarity Project and Portfolio Management - John
Deere
Microsoft - Project Manager Training - John Deere
Six Sigma Black Belt - John Deere
P3 Project Management Training - YCA - Caterpillar
Project Success Training - YCA - Caterpillar
SAP - Certification FI/CO
Compuware QA Center Enterprise - Caterpillar
Primavera 4.0- E/C Project Management Training -
Project Management Centre - Caterpillar
ITIL V3 - In process
Six Sigma Master Black Belt - Caterpillar
PMP certification - 2001
Oracle 11g - Cellular South
HP- (Mercury) Quality Center- Cellular South
Primavera 5.0 - Cellular South