Post Job Free
Sign in

Power Plant Electrical

Location:
Beverly Hills, FL, 34465
Posted:
September 10, 2010

Contact this candidate

Resume:

Hugh Mayes

Phone: 256-***-****

**** **** ***** ****

Beverly Hills 34465

****.*****@*******.***

OBJECTIVE

My goal is to add profitability and productivity to a company in the

drafting design field by utilizing my experience and willingness to

learn new techniques.

SUMMARY OF QUALIFICATIONS

AutoCAD and Raster CAD Overlay proficiently

15+ years experience in interpretation of mechanical blueprints

Experienced in construction and the observation of project sequencing

Committed to the professional standards of my profession

Possess a current class B "CDL" license

Experienced Backhoe, Track hoe, Dump Truck, Vac-Truck, and Forklift

operator

Certified in hazardous materials response

Posses a TVA Browns Ferry level 2 clearance

Posses a current CR3 level 2 clearance

Able to perform field walk downs

COMPUTER SKILLS

AutoCAD 2010 and AutoCAD RASTOR DESIGN 2010

Raster Overlay Software (Drawing Improvement Program Instructor)

Solid Works 3D CAD Software

Microsoft Windows, Word, Outlook, Internet Explorer

Microsoft Access database production activity entry

Adobe Acrobat Pro

Microsoft Office Power Point

WORK EXPERIENCE

Drawing Improvement Program Team Drafting (2008 -2010)

Progress Energy/DZ ATLANTIC

Updated existing drawings and created new drawings.

Also created

3-D drawings of piping and components for steam

generator and heat exchanger

for Progress Energy power plant. Would take field

measurements to create new drawings.

Premier Truck Center (2006 -2008)

Shop maintenance and mechanic work on Mack and Volvo

tractor.

Drawing Improvement Program Team Drafting (2006 -2006)

North American Fab

Create new structural and electrical

drawings for 280' vessels.

Materials Distribution Driver (2002 -2006)

B & G Spotting Corporation - Sheffield, AL

Work at SCA TISSUE shipping and receiving docks

For loading and unloading of products.

Drawing Improvement Program Team Drafting (2001 -2002)

Bechtel Power Corporation- Brown's Ferry Nuclear Plant - Athens, AL

Responsible for interpretation of multiple TVA and Bechtel

procedures for revising and creating As-Built drawings from

previously issued engineering documents using AutoCAD and

Raster Overlay Software. Drawings covered multiple

disciplines (Structural, Pipe Supports, Piping, and

Electrical) at multiple document stages. Work directly with

engineering to produce detailed pipe support drawing for

fabrication. Maintained daily production database. Assisted

other employees as needed during their training phase in

AutoCAD and Raster Overlay. Crossed over into Packaging

department for research of pre-existing documents that would

eventually go back into the drafting department. Recommended

strategies to streamline paperwork within packaging process

.Distribution Associate (1998 - 2001)

B & G Spotting Corporation - Sheffield, AL

Heavy equipment operator for product distribution

Environmental Cleanup Crew Member (1998 - 2001)

MPS Environmental Services - Detroit, MI

Dismantlement of tanks, liquid waste containment, high

pressure washing of entire site, and transportation of

contaminants to certified waste disposal facility.

Machinist (1996 - 1998)

DieCo Corporation - Sheffield, AL

Interpreted blueprints for assembly of die cast dies using

engineering design drawings

Machinist (1993 - 1996)

South Central Tool and Die Corporation - Florence, AL

Interpreted blueprints for assembly of die cast dies using

engineering design drawings

EDUCATION

August 1998 - May 2000 Northwest Shoals Community College, Muscle

Shoals, AL

Drafting and Design AAS

Degree

GPA - 3.6

Specific Responsibilities

2000 For six months, I worked with welders laying

water and field lines.

2000-2001 Bechtel Power Corporation- Brown's Ferry Nuclear Plant

Responsibilities

1. Using previously issued engineering documents,

created and revised As-Built drawings for

structural, pipe support, piping and electrical

disciplines. One of my responsibilities there was

to produce detailed pipe support drawings for

fabrication, working directly with engineering.

2. I worked with contractors laying out barricades

and parking lots for 800 cars.

3. I worked with engineers directly on site for

building and substation piping, new and relocation

projects making changes to new and old drawings.

4. Drew pipe hangers an located them in the plant

and made the proper elevation changes

2006-2006 North American Fab Houma LA

Responsibilities

1. I worker with foremen's, engineers, and

electricians to create new drawings. I also took

field measurements.

2. I worked in electronic drafting create drawing

for electrical raceways and control consoles for

navigation systems.

2006-2008 Premier Trucks Centers

Responsibilities

Shop maintenance and driver

2008-present Progress Energy

Responsibilities

1. Recreate and update exciting drawing on M.S.R AND

STEAM GENERATORS FOR POWER UPGRADE.

2. Created drawings for lay down areas for heavy

equipment and components Heavy haul paths for moving

large components and piping and valve replacement.

3. Point of contact for onsite project. Preformed field

engineering to develop hand sketches for

fabricating parts.

4. Create drawing for engineering markups to make weld

maps.

5. I have generated drawing from hand sketches for all

crafts.

6. Made new drawings from vendor drawings that were

previously in PDFs format a usable cad drawing

7. Maintained file system for them project drawings and

living documents. I used pass port to research drawing

history and plant drawings.

This is one of drawings I created from the turbine

generator at CR3 group

8. Create 3-D drawings of large components of the

turbine building and piping.

9. Preformed field walk downs to verify interferences

for work to be performed during the R17 outage for

major projects. Put the verification and elevations

of piping, hangers, electrical raceways, and pumps

in 3-D on a new drawing.



Contact this candidate