Post Job Free
Sign in

Construction Engineering

Location:
Hialeah, FL, 33015
Posted:
July 23, 2010

Contact this candidate

Resume:

Oscar R. Zelaya

**** ** *** ******, *****, Florida, 33015 – 305- 308-0323 - ***********@***.***

O BJECT I VE

Seeking a challenging position that will utilize my skills and knowledge gained through education, hard

work and extensive experience in manufacturing, planning and management.

WORK EXPER I ENCE :

July 1999 – November 2008 Senior Production Control Analyst - Bertram Yacht Inc. –

M iami, Fl.

Performed / coordinated detailed planning, scheduling. Expedited materials for product

l ines/boats to meet master schedule and customer order requirements.

Maintained cost report of standard models and options including sub-contractors external

operations and value of working process.

Provided study for cost of new models and quarterly budgeting and business forecast.

Created configuration and management of all company jobs and work orders.

Maintained inventory levels supporting production and service departments’ requirements while

maintaining economic control of inventories; coordinated the efficient movement of materials

w ith purchasing, production, and engineering.

Responsible for production database: created analysis and report to production data. Created Bill

of materials, work centers, phase, operations, internal & external work orders, issued materials

for production, processed labor hours, pick lists; created manufacturing codes, maintained

master i tems.

Responsible for Production Control Reports: labor hours, production progress, boats in

p roduction cost, Bill of materials cost. Collected, analyzed and interpreted manufacturing data in

order to make decisions about production, personnel or processes.

Coordinated operations with other Departments: Accounting (Costing/Work in Process), Finance

(budgeting/forecasting), Purchasing (MRP/inventory levels), Sales (shop orders and production

P lan), Engineering (Bill of materials, master i tems and ECO’s), warehouse (materials

movements, quantities on hand, pick list), Production (progress/efficiency and manpower).

July 1991- May 1999 Estimator and Engineering Assistant Consolidated Yacht Corp.,

Dania, Fl.

Performed Estimation for new construction, repairs and retrofit ting of boats up to 200’LOA.

Coordinated contracting, payment schedule according to work in progress and interfaced with

p roject managers, captains, brokers and boat owners.

Created jobs standard manufacturing codes and configuration for each job and monitored

p rogress.

Surveyed boats to be repaired in mechanical, electrical and other systems.

Estimated cost of new molds for boats and prototypes for boat builders

Performed ACAD drafting, lofting, and sketching. Coordinated labor, materials,

subcontractors for new jobs, opened work orders, verified costs, reported progress, invoiced

reconciliations, closed jobs.

May 1989 – June 1991 Engineering-draftsman - Denison Marine Inc. Dania, Fl.

Drafted for new construction: profiles and general arrangements, structural components and

s tandard details.

Created Engineering Materials Take Off and systems specifications.

Drafted systems, assemblies, modules and foundations for shop fabrication.

Maintained Engineering documentation of major components.

Assisted foreman during construction stage.

April 1987 – Ma rch 1989 Planner/loft man/draft man - B urger Boats of Lantana,

L antana, Fl.

Performed Lofting/ planning/scheduling: 87’ Burger project, 57’ Striker Fishing Boat, 50’ Striker

f ishing Boat and 64’ High speed cruiser.

Reviewed Engineering drawings and created part numbers and bill of materials.

Performed break-down of projects into sub assemblies, assemblies, operations, sequence, created

p ick lists.

Coordinated loft f loor to made full size lines from tables offsets provided by designers.

Made wood, cardboard or metal templates to be used in construction.

Developed production charts, key events, hours required by departments.

Assisted foreman during construction stage.

Made shop fabrication sketches by operations construction Drawings

August 1984 – Ma rch 1987 P lanner/Scheduler - L antana Boat Yard Inc., Lantana, Fl.

Projects: 106’ Guardian Patrol USGC., 68’ Patrol Boats, 35’ & 30’ River Patrol boats.

Prepared schedule by departments, projects and plant maintenance.

Kept records of job schedule t ime and checked work packages.

Assisted production manager in proposal and new projects.

Assisted Loft man in making templates and lay-out of parts for boat – nesting diagrams, etc.

Estimated man-hour and production materials cost.

ED UCAT ION :

1978 B achelor D egree i n Li terature & Mass Media - Universidad Catolica - San Salvador, El

Salvador

Yacht Design Program - Westlawn Insti tute of Marine Technology

1986

2006 Certificate - Lean Manufacturing

S K I L LS AND AB I L I T I ES:

Proficient in W indows 98, 2000 professional, ME and XP, Auto CAD 2004, Proman-Pro, Win project,

M icrosoft Office - Excel, Proj – AS400, Word, and Power Point

Fluent in Spanish and I talian.

A bility to work independently and manage multiple tasks and projects in fast paced and stressful

environments.

Excellent organization, communication, administrative and team skills.



Contact this candidate