Post Job Free
Sign in

Manager Construction

Location:
Green Cove Springs, FL, 32043
Posted:
July 28, 2010

Contact this candidate

Resume:

**** ******** ***** . ***** **** Springs, Florida 32043

Phone 904-***-**** . E-mail abl7z9@r.postjobfree.com

Darryl Wayne LaBranche

Education

Florida State College of Jacksonville

Jacksonville, FL

Forrest High School Jacksonville, FL

High School Diploma

SOFTWARE EXPERIENCE

Microstation, Geopak, InRoads, AutoCad, ArcGIS,

Fli-Map, 3D Studio, Pedds FDOT, Long Range Estimates

FDOT, Office Network Administration, SmartBoard, Cadd

Manager, Adobe Professional, Powerpoint, Proposal

boards and design

Professional experience

11/12/2001 - 04/21/2010 HNTB Corporation

Jacksonville, FL

Senior Designer/CADD Manager/Network Administrator

Greater New Orleans Hurricane and Storm Damage Risk

Reduction System (HSDRRS) - Senior Lead Designer for

numerous levees, canals, pump stations and sector

gates. My responsibilities included Inroads Civil

design layouts and sections, DTM modeling, floodwall

layouts, Structural design layouts and sections,

rebar layouts, Mechanical design layouts and

sections, plan production, CADD standards and

coordination between design teams and the Army Corp

of Engineers New Orleans, Rock Island and Vicksburg

districts. I was also embedded with the Army Corp New

Orleans District for several months working on the

Gulf Intracoastal Waterway (GIWW) project. I handled

canal dredging, cofferdam design, DTM modeling,

earthwork calculations and site layout. With this

project, I also did work with the Civil, Structural,

Mechanical, Relocations and Electrical departments.

Daytona Speedway Improvements, Volusia County, FL -

Senior Lead Designer for design of the $62 Million in

improvements for the in-field garage area and new

tunnel under Turn 1 at the Daytona Speedway. My

responsibilities included the civil site layout, site

drainage and dtm modeling of all the new buildings,

Lake Lloyd improvements, 516 foot tunnel beneath Turn

1, RV parking improvements and new "FAN-ZONE"

attraction area. The project was a design-build

project with The Haskell Company. Design completed

July 2004. Construction completed Feb. 2005.

I-10 @ Marietta Interchange, FDOT District 2, Duval

County, FL - Senior Lead Designer for the new

interchange to replace the existing Marietta

Interchange with I-10 in western Duval County.

Project included the reconstruction of Hammond

Boulevard and Devoe Street. My responsibilities

included alignment design layout, dtm modeling, cross

sections design, utility relocations, quantities,

plan production and coordination for the plans.

I-10 Widening, FDOT District 2, Duval County, FL -

Senior Lead Designer for approximately seven miles of

interstate widening. My responsibilities included

alignment design layout, dtm modeling, cross sections

design, utility relocations, quantities, signing

pavement marking, plan production and coordination

for the plans. Construction is currently ongoing.

Martin County Rest Areas, FDOT District 4, Martin

County, FL - Senior Lead Designer for reconstruction

of the Martin County Rest Areas. My responsibilities

included alignment and design layout, cross section

design, site drainage, plan production and

coordination for the plans. Design completed in 2004.

Construction completed in 2005.

Hodges Boulevard Widening, City of Jacksonville,

Jacksonville, FL - Senior Lead Designer for

approximately two miles of roadway widening from

rural two-lanes to urban four-lanes divided. My

responsibilities included alignment and design

layout, cross sections design, site drainage, plan

production and coordination for the plans.

Construction is currently ongoing.

7/26/1999 - 11/9/2001 Transystems Inc.

Jacksonville, FL Senior Civil Designer/CADD Manager

Carolina Bays Parkway, SCDOT, Myrtle Beach, SC -

Senior Civil Designer/CADD Manager on this 21 mile,

$232 million design/build project. My

responsibilities included designing and drawing

contract drawings for the roadway, site drainage,

environmental restoration and cross sections all in

Geopak in less than a year during 2000. Construction

completed in July 2001.

SR 9A from St. Johns Bluff to JT Butler Boulevard,

FDOT District 2, Jacksonville, FL - Senior Civil

Designer for final design services for new

construction of a four lane divided roadway including

drainage, interchanges and street improvements.

Construction completed 2007.

9/22/1997 - 7/23/1999 TYLin Inc.

Jacksonville, FL Senior Civil Designer

SR 10 (US-90), Beaver Street Viaduct Replacement,

FDOT District 2, Jacksonville, FL - Senior Civil

Designer responsible for producing the contract

drawings for the roadway, maintenance of traffic, and

signing and pavement marking plans. Utility

Relocations that required design of new water mains,

sanitary sewer and force mains that had to be built

under the new bridge construction over a CSX Railroad

Yard. Construction completed in 2003.

US 17, FDOT District 2, Duval and Nassau Counties, FL

- Senior Civil Designer responsible for producing the

contract drawings for the roadway construction plans,

including the horizontal and vertical alignments,

traffic control plans, cross sections criteria and

signing and pavement marking. Construction completed

in 2001.

8/22/1994 - 9/19/1997 Pitman & Hartenstein Inc.

Jacksonville, FL Civil Designer

SR 13 from South of Race Track Road to Roberts Road,

FDOT District 2, St. Johns County, FL - Civil

Designer for replacing a two-lane rural road with a

four-lane urban section including a bridge, bike

lanes, and sidewalks. The project encompassed

approximately 2,500 ft of waterlines, approximately

2,200 ft of sanitary lines and approximately 1,800 ft

of force mains. Construction completed in 1999.

5th and McDuff Replacement & City Rehabilitation,

City of Jacksonville, Jacksonville, FL - Civil

Designer for services for the infrastructure

improvements along 5th Street and McDuff Ave,

including roadway, drainage, water and sewer

improvements, major storm sewer outfall, and an

off-site water detention facility.

2/3/1988 - 8/19/1994 Morales & Shumer

Jacksonville, Fl. Civil Technician

Baymeadows Road from Phillips Highway to San Jose

Boulevard, FDOT District 2, Jacksonville, FL - Civil

Technician for services to replace a two-lane rural

roadway with a four-lane divided urban roadway with

curb and gutter and sidewalks, project encompassed

over 1,000 ft of buried telephone cable,

approximately 2,300 ft of sanitary lines,

approximately 4,200 ft of waterlines and

approximately 2,000 ft of gas lines. Construction

completed in 1997.

Old Middleburg Road from Wilson Boulevard to 103rd

Street, City of Jacksonville, Jacksonville, FL -

Civil Technician for improving a two-lane rural

roadway to a three-lane urban section with sidewalks

and a bike lane. This 1.9-mile improvement involved

extensive coordination with existing utilities and

the accommodation of sanitary sewers and waterlines

for public utilities. Construction completed in 1997.

Professional memberships

American Society of Highway Engineers (ASHE) member

since 1993

Community activities

Member of Fleming Island Presbyterian Church

Baseball coach for Clay Police Athletics League

REFERENCES

Bill Cowdrey, Civil Engineering Technician - Civil

Section,

US Army Corps of Engineers - Jacksonville District

904-***-****

Manuel "Nholie" Tablante, Civil Engineering

Technician - Structures Section, US Army Corps of

Engineers - Jacksonville District

904-***-****

David P. Lovett Jr., P.E., Structural Engineer -

Structures Section, US Army Corps of

Engineers - New Orleans District

504-***-****

Troy Jeanfreau, Product Manager, HNTB Corp.,

Metairie, LA 504-***-****

Dave Evans, Western Division Leader, HNTB Corp.,

Atlanta, GA 904-***-****



Contact this candidate