Post Job Free
Sign in

Manager Plant

Location:
Gainesville, GA, 30506
Posted:
July 28, 2010

Contact this candidate

Resume:

RICHARD A. LOTTER

BSME / MSA

**** **** ***** *****

Gainesville, GA 30506

678-***-****

PROFILE

Director / General Manager / P&L Responsibility / Lean Manufacturing

Engineering Management / Start-ups / Turnaround Management / Business

Owner

Dual degreed professional with twenty years experience in engineering and

manufacturing management. Throughout my career I have directed engineering

and manufacturing teams responsible for new facility start up, program

management, process improvement, and JIT manufacturing. I have performed

in large automotive environments and a variety of supplier organizations. I

am a detail oriented leader with the ability to empower a team to achieve

great results, emphasizing culture as well as actions. I am experienced

with Microsoft office tools and posses a BS in engineering from General

Motors Institute and a Masters Degree in business from Central Michigan

University.

PROFESSIONAL EXPERIENCE

November 2008 to Current ANCHOR RESOURCE MANAGEMENT

Atlanta, GA

General Manager

Contract General Manager responsible for operations improvement for tier

one automotive supplier. Directed staff at four manufacturing locations for

cost reduction in areas of labor, scrap, material usage, and MRO. Achieved

$12 million in annualized savings.

September 2006 to October 2008 PLANTE MORAN

Atlanta, GA

General Manager

Contract General Manager responsible for multiple plant consumer products

injection molding operation turnaround. Evaluated readiness for lean

manufacturing culture and implemented work cell based operations for

improved quality, productivity, and material yield. Improved Key

Performance Indicators for an annualized savings of 1.3 million dollars.

April 2004 to September 2006 MARINE MAX

Atlanta, GA

Operations Manager

Responsible for marine retail operations including delivery, service, and

parts. Reorganized delivery operation to achieve enhanced customer

satisfaction. Improved service operation through equipment upgrades and

personnel training. Expanded parts operation to provide greater customer

selection and reduced repair lead times.

June 2000 to January 2004 ANDROID INDUSTRIES

Atlanta, GA

General Manager

Responsible for automotive sequence and assembly operation start up and

optimization. Led departmental managers to meet corporate objectives for

P&L, customer satisfaction, engineering, quality, staffing, and union

negotiations. Utilized state of the art error-proofing systems to deliver

defect free JIT product to General Motors-Doraville Assembly Plant.

Improved defective parts per million (DPPM) rating by 200% to world class

levels while increasing profitability by 30% and productivity by 50%.

January 2000 to June 2000 AFME

Atlanta, GA

Plant Manager

Contract interim Plant Manager at Peregrine in Oshawa, Canada responsible

for automotive operations improvement. Focused on cost and quality issues

to position this Peregrine facility for purchase. Reduced scrap and PRR's

to acceptable levels.

January 1999 to December 1999 IMC PLASTICS, INC.

Atlanta, GA

Director of Program Management

Responsible for corporate engineering management for consumer products

injection molder. Staff included six program managers in multiple

locations. Developed and implemented corporate wide procedures for program

management. Trained staff in Advance Product Quality Planning. Redesigned

quoting system. Supported marketing activity to improve corporate image and

growth potential.

July 1998 to December 1998 IBM CORPORATION Atlanta,

GA

Senior Consultant

Responsible for Re-Engineering Design Flow Team at Lockheed Martin.

Formulated strategic objectives for business transformation initiative.

Interviewed key client department managers to develop procedural changes to

implement effective organizational improvements.

August 1996 to April 1998 KEY PLASTICS, INC. Novi, MI

Director of Program Management

Responsible for corporate engineering management for automotive injection

molder from product development through production launch and optimization.

Staff included four product group managers and sixty project engineers.

Directed staff to meet departmental objectives for program cost, timing,

and quality. Implemented Advance Product Quality Planning system for

QS9000 certification. Developed engineering program management system

(EPMS) to achieve real time database for program monitoring. Supported

sales activity to achieve corporate growth goals.

April 1995 to July 1996 BECKER GROUP INC.

Sterling Heights, MI

(New owner of Chivas Products Ltd.)

Engineering Manager - Technology Group

Responsible for new technology and process improvement for Becker

Manufacturing Divisions with an annual sales of $1.4 billion. Managed

staff in the areas of material cost reduction and productivity

improvements.

March 1987 to March 1995 CHIVAS PRODUCTS LTD

Sterling Heights, MI

Program Manager

February 1993 to March 1995

Responsible for product and manufacturing engineering for Urethane

Division. Hired and trained engineering staff. Launched interior trim

programs for Mitsubishi Motors in Normal, Illinois. Managed the

implementation of product improvement programs to reduce cost and increase

quality ratings.

Program Manager

August 1991 to January 1993

Responsible for construction and operations start up for new Urethane

Division. Procured state-of-the-art capital equipment, tooling, and

process systems including robotic work cells for interior trim manufacture.

Hired and trained staff for production launch.

Corporate Engineering Manager

October 1989 to July 1991

Managed corporate engineering staff in the quoting, tool procurement, and

manufacturing implementation of company programs. Computerized quoting

system, increased tooling margins to 18%, achieved 97% first time sample

submission status, incorporated process capability verification procedure,

and trained staff in program management.

Plant Manager

March 1987 to September 1989

Responsible for assembly plant operations. Utilized MRP II for production

planing, revised plant layout to facilitate product based work cells, and

negotiated labor contract. Implemented high volume door panel assembly

line to supply JIT delivery system.

February 1986 to February 1987 LIGNOTOCK CORPORATION Troy,

MI

Facilities Engineering Manager

Responsible for construction of new manufacturing facility in New Jersey

including architecture, general contractors, manufacturing process and

layout, equipment and tooling procurement, and utilities/power systems.

Implemented a $1.3 million vision robotic system for interior trim

assembly.

September 1980 to January 1986 GENERAL MOTORS

Warren, MI

FISHER BODY

DIVISIONAL OFFICE

Senior Manufacturing Project Engineer

June 1981 to January 1986

Responsible for manufacturing feasibility and cost analysis for advanced

product design. Participated in Value Analysis Technique Seminars to

improve manufacturing operations. Responsible for formed interior trim

manufacturing including program planning, cost analysis, manufacturing

concepts, tool design, tool construction, plant tryout, and production

start up.

Senior Process Engineer

September 1980 to May 1981

New technology and automated systems engineering. Investigated and

proposed automation concepts for interior trim products.

February 1976 to August 1980 GENERAL MOTORS Euclid, OH

FISHER BODY - EUCLID PLANT

Skilled Trades Supervisor

Supervised skilled tradesman for the maintenance of machinery and

facilities repair. Responsible for installation and personnel training for

N/C cutting equipment. Received supervisor awards for contributions to

Operations Improvement Program.

ACADEMIC ACHIEVEMENT

August 1971 to January 1976 General Motors Institute

Bachelors Degree-Mechanical Engineering

August 1983 to May 1987 Central Michigan University

Masters Degree - Business

Excellent references available upon request



Contact this candidate