Post Job Free
Sign in

Engineer Maintenance

Location:
Long Beach, CA, 90808
Posted:
August 05, 2010

Contact this candidate

Resume:

Julie Ann Soria Cell

562-***-****

**** ********* ******, **** *****, California 90808

Email *****.*****@*******.***

CORE COMPETENCIES

Continuous Process Improvement 5S, Visual Factory Black Belt Certification

(Aug 2010)

Data Driven & Standardization Root Cause Analysis Green Belt Certification Feb

Skills 2009

EMPLOYMENT

Kroger Manufacturing - Compton Creamery, Compton, California Sept 2007 -

Present

Maintenance Engineer

. Leading Department Standardization, Parts Optimization, PM & PdM

Improvements & Schedule Compliance

. Initiated Team Member conduction of RCA and Kaizen Activities

. Involvement with GSFI, HACCP and GMPs

. Team Member Development, Succession Planning and Training.

TABC, Inc., Subsidiary of Toyota Manufacturing, Long Beach, California 1998

- 2007

Project Engineering, Maximo Administrator, Facility Maintenance

Department, June 2007 to Sept 2007

. Lead on Plant Conversion of CMMS local Maximo

4.1.1 to Centralized Corporate Web-based Maximo

5.2.

Production/Maintenance Engineer, Stamping and Tool & Die Department,

March 2007 to June 2007

. PM and PdM Improvement and Schedule Compliance.

. Modify Management of Change system for

communicating work performed on vehicle

stamping dies.

. Improve and Drive Standard Operating Procedures

with emphasis on Quality and Safety key points.

. Report to Executive Management and Supervise

Team Members.

Production/Maintenance Engineer, Catalytic Canning Process Department,

2004 to March 2007

. Lead on Relocation of 2 Production Lines;

Steering Column and Catalytic Converters

. Kaizen Parts Inventory System and Optimization

. Maintenance and Operation Standardization of

Procedures.

. Report to Executive Management

. Production Engineer, Catalytic Coating Process Department, 2003 TO

2004

. Implement Fail Safe methods for minimizing

operator error (loading wrong precious metal is

very costly)

. Kaizen Precious Metal Coating: Consolidation of

2 lines improved Material Loss & Process

Simplification

Production/Maintenance Engineer, Paint Department, 1998 to 2004

. Significant Increase in Throughput by Kaizen

activities and upgrade Controls (PLC and

Wonderware)

. Lead on installation of (2) FANU Paint Robots

for material reduction, quality of more

throughput

. Total Productive Maintenance, TPM Coordinator

. Lead on Environmental and Safety Compliance of

Regulations.

. Confirm and maintain oven and incinerator

operations and safety interlocks

Toyota Motor Sales, Torrance, California 1997 to 1998

Engineer Associate

. TPS Department - Learned from experts on Toyota Production

System (TPS), Practical Problem Solving (PPS), Quality Circles,

Kaizen Events, and 5S

. Collaborate with Vehicle Accessory Supply Chain to develop

vehicle accessories and installation Instructions

. Train Port Installers on installing accessories

EDUCATION

Graduate June 2011 University of Phoenix, Gardena, California

Master of Business Administration

Graduated May 1995 CSU Long Beach, Long Beach, California

Bachelor of Science, Mechanical Engineer

COMPUTER PROFICIENCIES

Word, Excel, Access, Outlook, PowerPoint, Project, AutoCAD, Maximo, PLC,

Infinity, EMPAC, Business Object

References available upon request



Contact this candidate