MICHAEL W BECKMAN Portland, OR ***** 503-***-****
*******@*******.***
PROFESSIONAL EXPERTISE
Materials Quality Supply Chain New Product Development
Engineering Management
Project Management Manufacturing Design Engineering Management
Engineering
SUMMARY OF CAPABILITIES: Root Cause Failure Analysis ? Design for
Manufacturability Analysis, Assembly and Test (DFx) ? ASME Y 14.5 GD&T ?
Statistical Process Controls (SPC) ? Quality Business Reviews ? Total
Quality Management; ISO9001 Quality Mgmt Systems ? Lean Manufacturing ? Six
Sigma ? Gauge R&R ? Measurement Capability Analysis (MCA) ? Product/Process
Yield Improvement ? Supply Chain Management ? Supplier Audit and Corrective
Action Management ? NPI to HVM Product Transfer ? Configuration Management
and Release Management ? Manufacturing Engineering ? Non Conforming
Material Resolution ? Facilitation MRB process for defect disposition ?
Project Life Cycle Management ? Cross-functional Team Leadership ?
Negotiation and Influencing Skills ? Project Cost Benefit Analysis ?
Service Level Agreements (SLA's), Terms & Conditions (T&C's) ? SAP AG
custom application ERP/MRP ? MS Office suite ? Technical presentation
development & delivery
WORK HISTORY
Fastlane Design Services - 2008 to Present, Folsom California
New Business Development - Consultant
. Performed outside sales function and lead generation for a small in-house
design engineering business.
. Provided coordination of quoting activity, prepared weekly reports
detailing meetings held and phone calls made. Prepared monthly reports
detailing activity with current and prospective customers.
. Researched and developed /maintained business relationships with
current and prospective customers.
. Assisted Operations and Project Management with understanding customer
needs and requirements to determine feasibility of performing projects
and accurate timely quotation development.
. Increased book to bill ratio by 1.07 % monthly in 2008 requiring the hire
of additional design resources.
Volt Technical Services - 2007 to 2008
Under Contract to Intel Corporation, DEG; Digital Enterprise Group, Design
Validation, Hillsboro, OR
Supplier Quality and Manufacturing Engineer / Project Management
. Formed and led product development teams and led NPI projects through
full life cycle from planning phase; development to product
certification. Launched platforms within constraints of time, cost and
performance.
. Selected suppliers, audited their fabrication process capability, quality
management systems, developed cost benefit analysis, evaluated,
reliability, materials, properties and techniques used in production and
made recommendations to management resulting in increased capability and
yields at reduced costs.
. Developed a cost benefit analysis and negotiated reduction of validation
collaterals purchased, resulting in savings of $190K of a $1.1M project
budget.
. In collaboration with supply base, developed assembly processes resulting
in enhanced throughput at reduced cost.
. Received employee of the month; September 07' for outstanding performance
and dedication.
Intel Corporation, SMO; Systems Materials Operations, Hillsboro, OR - 2003
to 2007
Global Supply Chain Management / Project Quality Management
. Developed and executed material program plans/qualifications, developed &
managed corporate supply chain through quality performance management and
contract compliance administration resulting in cost reduction & value-
engineering strategies for tier one offshore and domestic suppliers.
. Key contributor for root cause and corrective action planning that
resulted in approximately $800K cost avoidance of $4M project budget.
. Improved supplier performance resulting in reductions in defect rate by
15% year vs. year
. Team membership which obtained cost savings of $8M in 2007 & $10M in 2006
fiscal years through managing "Key Performance Indicators", Allocation
Management, and Suppliers' early design involvement.
. Developed visual inspection criteria and yield report format for builds
of Intel's 10GHz Optical Transponder at Contract Manufacturer resulting
in (300 DPM ( 90 DPM) reduction.
. Developed Qualification plans and performed statistical analysis on (CTF)
Critical to Function parameters resulting in launch readiness of Intel's
first 10 Gbps DWDM optical transceiver module.
Intel Corporation, PAE; Platform Applications Engineering, Folsom,
California - 2000 to 2003
Supplier Quality Management / Project Quality Management
. Supported new product/process development programs through the
application of concurrent engineering/ manufacturing engineering
processes - Performed Design for Manufacturability (DFM) on new products.
. Drove cost reductions, materials risk analysis, materials qualifications
through management of supplier quality activities and product development
processes. Excursion mitigation/prevention by driving initiatives such
as: early supplier involvement in new product development, design for
manufacturability.
...Continued...
Michael W. Beckman Portland, Oregon, 97229 503-***-****
*******@*******.***
. (DFM), acquisition and analysis of supplier in-process data, including
output yields and overall performance evaluation and assessment of
process capability. Developed quality metrics to evaluate supplier
performance.
. Communicated directly with vendors on material sourcing, qualification,
and performance issues.
. Provided project definition and metrics, resource allocation, budget
analysis, task prioritization, contingency planning, and project/program
reviews for transitioning of products from design into fabrication and
assembly.
. Obtained three patents from the creation of intellectual property.
. Received a (DRA) Divisional Recognition award for "Demonstrated success
for the ability to analyze problems, recommend solutions and implement
procedures to achieve operational objectives".
Intel Corporation, ATTD; Assembly Test Technology Development Group,
Chandler, Arizona - 1997 to 2000
Desktop & Enterprise Server Products' Package Engineering / Project
Management
. Sr. Packaging engineer; focused on all aspects of chipset (MCH/PCH)
Memory Control Hub/Platform Control Hub and (CPU) Central Processing Unit
packaging for Intel desktop and enterprise server chipset packages.
. New product development included: design process development, physical
design, mechanical/thermal constraints, power delivery, signal integrity,
laminate material and assembly of semiconductor packages.
. Represented manufacturing interests to substrate suppliers; obtained 3%
qtr vs. qtr supplier cost reductions of a <$6M budget for interposer
mechanical design collaterals.
U.S. Robotics (3Com Corporation) Personal Communications Division, Skokie,
Illinois - 1994 to 1997
Corporate Commodity Management - Supply Chain Quality / Project Management
. Planning and Management of Commodities; responsible for all activities
involved in supplier selection, sourcing, raw materials and/or components
needed for manufacturing. Coordinated with purchasing to ensure reliable,
cost efficient delivery of materials to the production line.
. Acted as the primary escalation point between R&D, Manufacturing and
Procurement with respect to NPI.
. Negotiated cost reduction of all Telephony prototype PCBs procured
resulting in 42% cost reduction over 3 yrs. ($580K annual spends).
. Developed commodity and supplier strategies for long-range business
direction.
. Spearheaded the implementation of keypad conductive ink in lieu of gold
plating resulting in BOM savings of $0.78, translating to $410K over 3
yrs.
Barnes Engineering (EDO Corporation) Military and Space Borne Products,
Shelton, Connecticut 1990 to 1994
Product Design Services Manager / Technical Project Management
. Managed, coached and motivated a diverse group of design engineering
professionals; oversaw departmental objectives including design resource
allocation, project coordination, task definition, timeline development
and milestones in a highly dynamic environment for design activities of
Space Shuttle qualified programs.
. Created and implemented design and checking processes that increased
efficiencies, accelerated throughput and reduced error rate.
. Managed project objectives including design resource allocation, project
coordination, definition of tasks, development of timelines and
milestones for design activities
. Coordinated with machine shop and manufacturing engineering for the
release of data/documentation to ensure successful new product launch of
space qualified products/equipment into production.
. Performed incoming and (FAI) First Article Inspections to print, drove
corrective actions.
. Procured a (CMM) Coordinate Measuring Machine, developed measurement user
interface and training for quality technicians resulting in reduced
inspection times of 75% over manual process.
Responsible for establishing and leading corrective actions team to
determine root cause and corrective action on Space Shuttle qualified
programs
EDUCATION
AAS; Associate of Applied Sciences, Arizona Institute of Design
Engineering, Glendale Arizona.
BSET; Bachelor of Science Engineering Technology; pursuing undergraduate
courses; 75% of core credits completed; Arizona Institute of Design
Engineering, Glendale Az.
Diploma, Cleveland Institute of Electronics and Technology (Distance
Learning).
Continuing Education: Intel University; 220 hours completed of technical
and business courses.
PROFESSIONAL COURSEWORK
cAPM Associate in Project Management (Intel corporate business coursework)
- Project Management Fundamentals
- Leadership in a Project Team Environment
- Structured Problem Solving
- Constructive Confrontation
cSCP Supply Chain Management (Intel corporate business coursework)
- Supply Chain Fundamentals
- Supplier Relationship Management
- Manufacturing Resource Planning
- Source Selection and Fair Value Techniques
- Ethics in the Workplace / Business Practice Excellence