Post Job Free
Sign in

Sap Manager

Location:
1752
Posted:
August 04, 2010

Contact this candidate

Resume:

EXPERIENCE SUMMARY:

Expert in solution design, architecture and implementation of SAP products

with focus on helping customers size, migrate and host their SAP landscapes

at lowest TCO and highest standardization. I provide systems support to

different functional process with a proven track record of helping clients

improve company profitability, revenues and customer satisfaction with the

rapid implementation of SAP solutions and enabling technologies,

establishing and maintaining good communication, collaboration and

cooperation between customer, SAP and hosting providers. Over the last 12

years, I have assisted many companies size, migrate and implement SAP

successfully across multiple platforms and providers with global experience

in all sized companies across many cultures.

RELEVANT EXPERIENCE:

VCE June'10- Till Date

Solutions architect for different customers private cloud

implementation.

. Major Financial services customer with 1000 +servers on varied

landscaped is architected to a private cloud implementation.

. Capgemini AOS private cloud architecture as a multi tenant

solution.

. Deloitte SAP private cloud implementation architecture.

Capgemini

Manager for Customers BBH, DFA, S&N, Performance Fibers, Propex, HMH

and Goss July'09

- June'10

Key Responsibilities included:

. Project planning and implementation of migration plan for BBH

. Project planning and new install for DFA.

. Sizing, design of SAP systems including SCM system for S&N.

. Participation in Cloud computing solution evaluation and

implementation team.

. Presentation of new technology and applications to current

customers.

. Program Management of simultaneous projects, work streams for

multiple customers.

. Managing multiple customer accounts and programs on a regular

basis.

. Managing direct reports in NA and Right shore India

. Implementation of Test Data Migration Server (TDMS).Separate system

was used and a system refreshed QA was used as the source system.

. Migration of Goss HP-UX 11.23 PA_RISC SAP systems to IA64 11.31 SAP

System.

. Migration of Goss SAP systems by copying the SAP Data files and

opening them with the IA64 Kernel installation.

. Performance issue troubleshooting and performance parameter update

on Customer HMH - SCM Instance. The Data Cache and OMS Heap were

tuned along with other parameters.

. Redesign and Re Architecting of the PFI and Propex customers

landscape including SCM Instance for Hosting contract renewal and

hardware refresh

. Virtualization of the hardware using VM Ware ESX and AIX VIOS for

SAP.

. SAP OS/DB Migration from AIX 5.3 / Oracle 9.2 to RHEL 5 / Oracle

10.2 for Performance Fibers. Complete Landscape Migration of the

old hardware and platform to the newly designed platform.

. R3load, Distribution Monitor and Migration Monitor were used to

perform the migration of different systems. Java Systems were

migrated with SAP Installer.

. SAP OS Migration from Aix 5.3 to Aix 6.1 for Customer Propex.

Complete landscape was migrated keeping the database at the same

Oracle 10.2 level. Migration of Propex SCM, ECC, BW, GRC, CRM,

Solution Manager Landscape.

. Two Major customer Migrations completed in 3 months timeframe.

. Preparation of SOP's for the migrated platform SAP implementations.

. Preparation of SLS reports for new migrated platform SAP

Implementation.

. Managing Direct Reports of 4 Sr. Basis Administrators in North

America and 8 Basis Administrators in Right shore India team.

. Managed Performance, Assessment, Revenue Management of the

Resources.

. Managed Recruitment and Separation of Resources from the Team.

. Key Process Indicators (KPI's) for the Resources were managed.

. On going off shoring effort with Team in India. Arranged People,

Recruited Consultants, Process and Procedures for Sharing the Job

load to the Indian Team.

Manager for SAP Implementation project at American Greetings, Ohio

Mar'09 - July'09

Key Responsibilities included:

. Sales of remote support to the customer. AG is now remotely

supported from our Marlborough Datacenter

. Preparation of Quotes for Remote support.

. Customer Presentation and Interaction for Remote support.

. ACC implementation on Training & Sandbox Systems.

. Installation of Portal EP 7, BI 7 and CRM 7.

. System copy of Portal EP 7, BI 7, CRM 7 to Sandbox.

. Redesign of the landscape to reduce the number of Application

servers in LPAR.

. Configuration of SSO between Portal and BW system.

. Setup of the Federated Portal Network between BI 7 and Portal EP 7

. Re-architect the JFS2 file system to improve performance of the

system.

. Work with testing team to do performance and load testing with HP

Load runner.

. Move of SLD to Solman Production system.

. Performance tuning of DB2 9.5 Databases associated with Netweaver

and Portals.

. Configuration of Wily Introscope Enterprise Manager.

. Performance Metrics for Wily Workstation was setup.

. Troubleshooting and resolving issues for the BI & CRM Project team

developers.

. Management and Coordination of 3 Basis and 2 Portal Administrators

of American Greetings.

. Knowledge Transfer to AG's Administrators.

Manager for Customers Performance Fibers, Synthetic Industries, HMH,

Tweeter

Dec'06 - Mar'09

Key Responsibilities included:

. Preparation of presentations to customer every quarter on

achievements and future projects.

. Managing Direct Reports of 4 Sr. Basis Administrators in North

America and 8 Basis Administrators in Right shore India team.

. Managed Performance, Assessment, Revenue Management of the

Resources.

. Managed Recruitment and Separation of Resources from the Team.

. Key Process Indicators (KPI's) for the Resources were managed.

. Move of P690 for PFI from CSC datacenter to Moncure Datacenter.

Project Planning, Failure plan with P550 Systems. Backup and

Restore on P550 and then Execution of the move of P690 from CSC to

PFI Datacenter in Moncure.

. System Refresh of Quality and Development system for Tweeter with

DB2 Database and Documentation.

. On going off shoring effort with Team in India. Arranged People,

Recruited Consultants, Process and Procedures for Sharing the Job

load to the Indian Team.

. Redesign and Architect PFI landscape for Contract Renewal with P6

systems.

. Preparation of SOP's for all 5 clients

. Preparation of SLS reports for all clients

. Configuration of SSO between Portal and BW system.

. Restore of Legato Production Backup on Shadow system for

verification.

. Management of the Basis Team comprising of Five SAP Basis Resource.

. Preparation of documentation, resource planning, problem resolution

documents.

. Crash recovery of Suse Linux 9.3 by rebuilding the corrupted kernel

and including the initial load modules SCSI and reiserfs with the

kernel.

. Reorganization SAP/Oracle 9.2 Database using brtools and releasing

Lun at SAN Level in a 48 hour nonstop operation.

. Crash recovery of a Linux Root Partition on reiserfs from Backup

for Versa Production SAP system.

. Helping with SAP/Oracle side of HACMP Installation, Tweaking HA

scripts, Oracle recovery during a HA Switch testing crash on PFI.

. Installation of NWDI and EP 7.0 for Propex on Windows 2003 Blades.

. Building a reference system with TSM 3590 tapes on 3584 library -

SAP system of the acquired company.

. VMware install - 4 partition of windows created + Moved CRM Mobile

station to the VMware partitions to free up blades for Enterprise

portal installation.

. Enterprise portal Installation and configuration.

. Installing shadow systems for ECC 6.0 Upgrade.

. ECC 6.0 upgrades from R/3 4.6D for Customer Propex (SI). (D/Q/Prod

systems) with Oracle 10.2 Upgrade.

. Setup of the Indian Offshore Centre of Excellence and transfer of

competencies to the COE. Procedures and management of COE

resources.

. Installation of TSM server, restore of node and recovery of

database to build a Reference SAP system for Invista - PFI.

. Hardware Sizing, Installation of P550, Configuration of IBM 3590

tape drive for Invista Reference system.

. Upgrade of HMC and Firmware update on AIX servers.

. AIX 5.3 TL05 latest patches update.

. Installing Sudo and SSH on all AIX systems.

. SCM 5.0 Performance tuning and Parameter changes.

. Legato Backup utility client installation on AIX systems.

. Reorg of SAP table spaces to release LUN's.

. EMC CX500 - SP B non responsive error troubleshooting with EMC Lab.

Senior Principal Consultant for Performance Fibers and Synthetic

Industries

May'06 - Dec'06

Key Responsibilities included:

. Crash recovery of Oracle with one copy of the control file being

corrupted.

. Upgrade of SCM version 5.0 with live cache upgrade and Oracle 10.2

upgrade.

. Installation of WAS 7.0 with Virsa Firefighter and Compliance

Calibrator. J2EE only standalone instance.

. Installation of Suse Linux 9.3 on IBM Blade Server HS20 with EMC

SAN configuration and Installation of MAXDB 7.6 for WAS 7.0 on

Linux.

. Crash Recovery of EMC array with all the systems involved.

. AIX 5.2 restored by installing on a temporary external SCSI disk to

avoid overwriting of AIX 5.3 Migrated kernel.

. Preservation Install of AIX 5.3 and loading of device drivers.

. Troubleshooting and Migration to AIX 5.3 kernel for the entire

landscape

. AIX P Series 630/620 Microcode update for AIX 5.3 Migration.

. ORA600 Crash of Oracle. Session Event Parameter for memory leak

tuned.

. Installation of Solaris 10 on an old Sun SPARC Ultra machine to

configure an Intranet file server.

. Installation of SAP WAS 640 on Suse Linux 9 / Max DB 7.5 on IBM

Blade Server

. Post Production refresh of Quality, Development and Sandbox

systems.

. Replacement of Crashed Internal Hard disk on P Series system.

. Installation of J2EE add-on Engine on existing ABAP system.

. Tuning of Parameters for Live Cache and APO SAP Systems.

. Abap/shared_objects_size_MB Parameter tuning for BW systems.

. Disaster recovery of all Propex systems at SunGard Facility in

Philadelphia

. Installation of Intranet Knowledge portal using Suse Linux /Apache.

. CUA configured for these two clients on the solution manager

systems.

. BI_JDBC_SDK Installation and troubleshooting. Connection containers

problem resolved.

. J2EE Server 640 add on installation.

. Installation of support packs 16 for J2EE Server.

. Installations of BW UDI connect for J2EE Server.

. Scheduling of QBLOCKDELETION for CRM Mobile Client Recovery.

. Oracle Performance Analysis and Parameter Update.

. Enabling CIO option on the SAP/Oracle/DB2 JFS2 File systems.

Direct Industry Experience and Accomplishments

Horizon Computer Services Inc

Client: Publix Super Markets, Florida, USA Mar'06 -

May'06

Sr.SAP Basis Consultant

Canadian Pacific Railway, Calgary, Canada Nov'05 -

Mar'06

Sr. SAP Basis Analyst

Horizon Computer Services Inc

Client: Lincoln Electric, Cleveland Ohio July'05

- Nov'05

Sr.SAP Basis Consultant

BWH, France

Client: IBM Global Services July'01 -

June'05

Senior SAP Basis / Oracle / DB2 UBD Database Administrator

HCL TECHNOLOGIES LTD.,

Client: Hewlett Packard, Brussels, Belgium Dec'00 -

Aug'01

Sr. SAP Basis Administrator

MAARS Software Ltd Dec '98 -

Nov'00

SAP Basis Administrator / Database Administrator

Incite Technologies Ltd Sept '96 -

Dec'98

Oracle DBA

SPIC Ltd, Chennai Aug'93 -

Aug'96

Programmer

TRAINING:

. Training at HP for Matrix Orchestration - Cloud computing solution,

USA, Mar 10.

. Training at IBM for Cloudburst - Cloud computing solution, USA, Mar

10.

. Training and Certification in SAP OSDB Migration, USA, Dec 09.

. Internal training in VM Cluster Run and Maintain, USA, Nov 09

. Training in VIOS at IBM, USA, Nov 09.

. SAP Insider Conference, USA, Mar 08 & 09.

. Training in IBM Dynamic Infrastructure and SAP ACC Concept, IBM US,

Feb 07.

. Training in Oracle RAC and SAP, Oracle Corporation, USA, Apr 07.

. Training in IBM AIX 5.3 Problem determination and troubleshooting,

IBM US, Mar 07.

. Training in Web AS Java Administration at SAP America, August 2006.

. Training in Informatica power center 7 Data Warehousing at IBM,

April 2005.

. Training in Basis D346BC at SAP Europe, March'02.

. Training in Basis Administration Dec'98- April'99

. Training in Oracle 7.3 Administration on Solaris Platform Sept'96-

Feb'97

. Training in Unix, C, Oracle 7.x Aug'93 - April'94

AFFILIATIONS/CERTIFICATIONS:

. PMI Certified Project Management Professional

. SAP Certified OS DB Migration Consultant for Netweaver 2004s.

. IBM Certified Specialist for eServer P5 and pSeries - Aix 5.3

Administration

. SAP Certified Netweaver 2004 Basis Consultant (Unix and Oracle) for

Netweaver 2004s.

. SAP Certified Technical Basis consultant (Unix and DB2 UDB) for

Version 4.6D

. IBM Certified DB2 UDB Administrator for Version 8.1 and 9

. Sun Certified Java 2 Programmer

HIGHER EDUCATION:

Bachelor of Engineering



Contact this candidate