Post Job Free
Sign in

Engineer Project Manager

Location:
2601
Posted:
August 09, 2010

Contact this candidate

Resume:

[pic]

B I O D A T A

LEOPOLDO TAMARGO SOBREMONTE

Position Applied For: wireless technician

EMPLOYMENT HISTORY

March 2010 to June 2010

Telecom Field Engineer

Avecs Corporation

Functions Included:

. Installation and commissioning of Huawei /BTS 3900/ BTS 3900A (2G/3G)

equipment

. Coordinates with RNC regarding any technical problems regarding site

integration and testing.

. Conducts sweep test (ANRITSU/AGILENT) for feeder cables before and after

swapped out

. Conducts PAT(provisional acceptance test)/FAT(final acceptance test) with

client.

March 2009 to February 2010

Field Telecom Technician

Infratel Networks Limited

New Zealand

Functions Included:

. Installation, commissioning, integration and testing (BER TESTER) of

microwave links.

. Installation and commissioning Nokia Flexi BTS equipment for Vodaphone

Telecom Project

. Coordinates with network monitoring center during integration,

troubleshooting and repair for proper transmission parameters and putting

sites on air.

June 2008 to February 2009

Installation and Commissioning Engineer

Avecs Corporation

Functions Included:

. Installation, commissioning, integration and testing (BER TESTER) of

pdh/super pdh microwave C) links..

. Installation and commissioning of NOKIA/ ERICSSON (BTS 2G and 2.5G)

ultra site/metro site equipment including integration with the existing

network

. Installation, commissioning, integration of 3G NOKIA including

functionality test upon integration in coordination with RNC

. Conducts provisional/final acceptance of integrated sites (2G/3G) with

client.

. Coordinates with RNC regarding any technical problems regarding site

integration and node B testing.

. Conducts sweep test (ANRITSU) for RF cables used during installation.

Aug 2007 to January 2008

Installation and Commissioning Team Leader

Down to Earth Ltd., Tanzania, East Africa

Functions Included:

. Installation, commissioning and integration of microwave links using the

ERICSSON mini link equipment (TN)

. Installation, commissioning and integration of RBS (Ericsson ) and BTS

(Alcatel) equipment

. Conducts sweep test for feeder cables using the site master (BIRD) test

equipment

May 2003 to July 31,2007

Telecom Engineer

AVECS Corporation(Telecom Contractor), Quezon City, Philippines

Functions Included:

. Installation, commissioning, integration and testing (BER) of pdh

microwave (NERA/ALCATEL/SIEMENS/ ONECOM/NEC) links.

. Installation of electrical and external alarm systems for cell sites

. Supervision of installation of cell sites both in civil and electrical

works.

. Installation and commissioning of NOKIA (BTS 2G and 2.5G) ultra

site/metro site equipment including integration with the existing

network

. Installation and commissioning of VSAT (AGILIS)

. Installation, commissioning, integration of 3G Siemens Node B (880,881)

including functionality test upon integration in coordination with RNC

. Conducts provisional/final acceptance of integrated sites (2G/3G) with

client.

. Coordinates with RNC regarding any technical problems regarding site

integration and node B testing.

. Conducts sweep test (ANRITSU) for RF cables used during installation.

. Termination using fusion machine (FUJIKURA) and testing (OTDR) of fiber

optic cables.

June 1999 to April 2003

Self Employed

. Involved in the telecom installation works (mobile/handheld radios,

PABX).

September 1998 to May 1999

Electronics Technician/Radio Officer (Designate)

Qatar General Petroleum Corporation, Qatar

Functions Included :

. Operation and maintenance of telecommunications equipment and facilities.

. Installation/repair of UHF and VHF transceivers (Skanti, Parkair,

Electronics, Sailor,Tait Electronics, Ericsson)

. Troubleshooting and repair of communication and electronics equipment

upto component level

. Control and carry out the daily activities in the Halul

Telecommunications centre on an assigned shift ensuring that messages are

relayed accurately and log all major operational daily events

. Maintain constant watch on all radio channels, monitoring transmissions

and promptly responding to radio calls or to abnormal/emergency

situations immediately alerting concerned authorities for action

. Undertake daily operational checks on all communication and alarm

equipment used in the Centre, including radio, telephone and hotline

communication channels and supervisory and alarm systems

November 1997 to April 1998

Senior Communication Technician

Waha Oil Company

Tripoli, Libya

Functions Included:

. Operation and maintenance of telecommunications equipment and facilities.

. Installation, troubleshooting and repair of (VHF,HF)/ mobile radios and

navigational equipment.

March 1991 to October 1997

Electronics and Communication Equipment Technician

(Promoted To) Telecommunications Engineer (Engineer II)

Department of Transportation and Communications

Cordillera Administrative Region (DOTC-CAR)

Baguio City, Philippines

Functions Included:

. Operated, maintained and repaired a variety of mobile radio (Icom,

Motorola) electronic equipment upto component level

. Undertook installation, maintenance, repair and restoration of

subscriber radio systems (SRS), telex systems and accessories

. Kept log of circuits and frequency of equipment and accessories.

Coordinated, if necessary, with other stations of the network to

ensure normal flow of communications

. Designated as Assistant Project Engineer (APE) for the Municipal

Telephone Projects Office (MTPO) in Abra province of the Region.

As APE of Abra MTPO, functions included:

. Identified the coordinates of the proposed network sites and measured

the altitude using survey equipment ( compass, altimeter, theodolite

satellite receiver, drawing equipment, tape-meter camera, binoculars)

including path clearance, vegetation and surrounding and existing

obstacles, existing stations, buildings and towers including

technical information for any existing radio equipment with in the

sites.

. Upon identification of the sites we conducted line of sight

propagation (LOS) with other identified proposed sites.

. Prepared path profiles for the proposed links.

. Coordinated with field representatives of the Contractor; monitored

the contractor's work and checked same against specifications/terms of

contract

. Checked, inspected, monitored progress of project and submitted

reports thereof to the PE or the Project Manager (PM)

. Acted as liaison officer to local government offices in connection

with the project requirements

. Attend to the installation, commissioning and provisional acceptance

tests (PAT) of all facilities completed

TRAININGS AND SEMINARS

. Radio Technician Course

o Radio Communications of the Philippines Incorporated (RCPI)

o Baguio City

o June - November 1988

. Digital Telephone Switching Technician Course

o Telecommunications Training Institute (TTI)

o Metro Manila, Philippines

o April - June 1990

. Digital Telephone Switching Operation and Maintenance of NEAX 61

o Filphone Incorporated

o Binalonan, Pangasinan, Philippines

o March - April 1992

. IRT 2000 - Engineering, Operation and Maintenance

o TRT-Philips (now Lucent)

o Paris, France

o September - October 1992

. IRT 2000 Corrective and Preventive Maintenance Training

o DOTC - CAR, Baguio City Philippines

o July 27 - 30, 1994

. GSM Essentials

o Ericsson Training Institute

o Pasig City

o March 10, 2001

. Nokia 2G Installation and Commissioning (Ultra site/ Metro site)

o Nokia, Philippines

o February 8-10, 2006

. Agilis VSAT Installation and Commissioning

o One Commerce Commercial

o Sucat, Paranaque

o February 7, 2006

. Siemens PDH Installation and Commissioning

o Siemens Philippines

o Sucat, Paranaque

o March 13, 2006

Alactel BTS Installation and Commissioning

o Alcatel East Africa

o Dar es Salaam, Tanzania

o December 13, 2007

. Huawei SDR BTS 3900/3900A Installation and Commissioning

o Huawei Philippines

o April 12-13, 2010

MAILING ADDRESS : MA 161 Puguis

La Trinidad, Benguet

2601 Philippines

: *************@*****.***

TELEPHONE NUMBER : +637********/+639********* (mobile)

DATE OF BIRTH : 18 December 1964

PLACE OF BIRTH : Baguio City, Philippines

NATIONALITY : Filipino

SEX : Male

CIVIL STATUS : Married

HEIGHT : 5' 4"

WEIGHT : 120 Lbs.

REFERENCES

Engr. Celestino D. Baldonado

President

AVECS Corporation

Quezon City, Philippines

*********@*****.***

Mr. Philip Bowyer

President

Down To Earth Limited

Tanzania, East Africa



Contact this candidate