Post Job Free
Sign in

Plant Manufacturing

Location:
Fenton, MI, 48430
Posted:
July 13, 2010

Contact this candidate

Resume:

Steven M. Stokes

**** ********** *******

Fenton, Michigan 48430

Cell: 810-***-****

SUMMARY: Results-oriented, hands on Material/Inventory professional. Highly

adaptable to different types of manufacturing environments. Proven ability

to develop creative solutions to Inventory/Material Flow challenges.

QUALIFICATIONS:

. 10 Years Materials/Logistics Experience

. 10 Years Lean Manufacturing Experience

. QS 9000 Internal Auditor Certification

. 10 Years Experience GM MGO System

. 10 Years Sequencing Experience

. MRP/QAD Experience

. HazWopper Certification

EDUCATION:

ABA/Concentration Accounting-3.49 GPA

EMPLOYMENT:

2010-Present Ryder Logistics-Operations Floor Supervisor (Contract)

Direct supervision of 35 Union Receiving employees. Responsible for the

timely loading/unloading, distribution and receipt of incoming material

into the Lansing Facility. Responsible for Safety Management and reporting,

training of new employees assigned to department. Manage the movement of

material throughout the plant in order to ensure daily production schedules

are being met.

2005-2010 Kay Automotive Graphics-Shipping and Receiving Manager

Direct supervision of 35 Shipping and Receiving Department employees.

Responsible for sourcing and procuring all material required for final

assembly lines. Assure daily cycle counts and FIFO processes are being

performed. Coordinate and implement new product introductions, product

transfers, and engineering improvements. Responsible for analyzing and

reporting of inventory levels of both finished goods and raw material on a

quarterly basis. Monitoring and Analyzing Lean Manufacturing principles.

Interface with Production Supervisors and Material Control personnel on a

daily basis on material availability in order to insure shipping schedules

are met. Responsible for all Logistics aspects of both inbound and outbound

movement of freight, including International, Domestic and HazMat shipping

requirements.

ACCOMPLISHMENTS:

.Control inventory levels of more that 1000 parts both finished goods and

raw materials by implementing radio frequency scanning to maintain 98%

inventory accuracy.

Team leader for Toyota Manufacturing Kaizen project to implement and manage

the flow of material into the plant along with line side production, also

the restructuring of the warehouse for storage of raw material, to reduce

the flow of material from storage to production lines.

2002-2005 GM Lansing Grand River-Material Flow Coordinator-(Aerotek)

Interface with suppliers on materials issues/inventory levels in order to

support daily production schedules. Responsible for material/inventory flow

at multi-facilities of more than 10,000 parts in order to support all

manufacturing departments. Manage and coordinate material flow on

engineering changes. Maintain suppliers shipping schedules including

over/under shipments, Min/Max conditions, and Packaging/Labeling issues.

Analyze and investigate material losses/gains, material history to identify

misuse, specifications problems, and plant scrap. Monitor and Manage

inventory control levels at Suppliers/Sequencers along with the LLP in

order to comply with Lean Manufacturing standards. Responsible for the

scheduling and tracking along with inventory management of all overseas

Powertrain suppliers. Responsible for all daily material operations to

include dock/line side production. Direct supervision of 40 UAW union

employees.

ACCOMPLISHMENTS:

.Maintain 98% inventory accuracy at plants and off site manufacturing

facilities of more than 10,000 parts.

.Reduced and maintained cost of material inventory obsolescence to less

than 3%.

.Set up and managed materials storage areas according to inventory levels

and point of use at plants and line side production areas to insure 100%

flow of material on a timely basis.

2000-2002 Comprehensive Logistics-Production Control Coordinator (GM

Lansing Car Plant)

Maintain balance of trucking/material flow throughout daily production.

Ensure material inventory at plant/off site manufacturing facilities is

sufficient to run daily production without interruption. Responsible for

developing material handling solutions for the effective movement of raw

materials through production. Implementation of KanBan system of more than

10,000 parts from start to finish to reduce and control inventory levels

following Lean manufacturing and JIT processes. Plan and develop lean

logistic measures in order to develop cost saving initiatives to include

restructuring of existing logistic lanes and development of new lanes.

ACCOMPLISHMENTS:

.KanBan implementation to reduce inventory cost and maintain 98% inventory

accuracy.

.Redesigned warehouse facility of raw materials and finished goods to

reduce the flow of materials from storage to production.

1997-2000 Lear Corporation-Buyer/Scheduler

Buyer for the General Motors program, including all components and raw

materials from 50 suppliers. Responsible for receipt, control, and delivery

of raw materials for production, control, packaging, and shipment of

finished goods. Responsible for daily production scheduling and production

control of assembly lines. Maintain cost efficient inventory levels

throughout the plant, by implementation KanBan systems, and cycle count

programs from start to finish in order to maintain accurate inventory

levels. Responsible for cost reduction initiatives of all logistic freight

movements. Responsible for the scheduling and shipping of finished goods.

Managing of receiving docks to ensure steady material flow into the plant.

Direct supervision of 40 Material Department employees.

ACCOPLISHMENTS:

.Led a KanBan parts flow implementation from start to finish, which reduced

production downtime by 90% and maintain inventory accuracy at 98% while

reducing inventory cost by 75%.

.Restructured production assembly lines to improve run efficiency by more

than 80%.

.Cut freight cost by 25% by consolidating inbound freight movements into

the plant.

1995-1997 Mackie Automotive-Materials Supervisor

Responsible for production schedules, and achieving high inventory accuracy

by incorporation of KanBan Min Max and cycle count programs while insuring

production schedules are met. Responsible for materials flow from storage

to line side to support production assembly lines. Direct Supervisor of

both Shipping and Receiving docks which includes 30 employees and 5

materials control follow-up personnel.

ACCOPLISHMENTS:

.Implementation of KanBan and Cycle count programs to reduce production

downtime by 90% and maintain inventory accuracy at 98%

.Restructuring of Manufacturing facility both storage and assembly lines to

improve flow of material with in the plant and enable production lines to

run more effectively, and reduce production downtime.



Contact this candidate