Christopher Wassam *******@*****.***
**** ***** **, ******, ** 14850 623-***-****
Education
Arizona State University Tempe, AZ
Bachelor of Science in Mechanical Engineering December 2006
Cumulative GPA: 3.04/4.0 Dean's List: 2 semesters
Departmental GPA: 3.34/4.0
Objective
Self-motivated, highly organized, EIT certified Mechanical Engineer with
solid skills and hands-on experience in mineral processing facility design
seeks to make an impact at growth-oriented organization that welcomes
drive, dedication, and creativity. Adaptable, career-oriented individual
has demonstrated ability to work independently as well as in a team
environment under high pressure.
Relevant Work Experience
AMEC E&C Services, Inc. Phoenix, AZ
Phoenix, AZ
Associate Engineer 6/2007-6/2009
. Underground Mine Design Criteria (1/2009 - 6/2009)
o Created generic design criteria for use in underground mining
applications.
. Ruby Creek Molybdenum Project (8/2008 - 12/2008)
o Evaluated and revised design calculations and drawings to restart
project.
. Bagdad Tailings Thickeners Feasibility Study (3/2008 - 9/2008)
o Performed hydraulic calculations, sized pipes, selected equipment,
developed equipment layout alternatives, prepared cost estimates for
each alternative, performed alternatives analysis to determine lowest
cost solution
. Ajo Sewer Upgrade Project (5/2008 - 8/2008)
o Performed field survey of existing sewer system
o Researched testing and permit requirements, prepared permit and
construction drawings
. Ajo Potable Water Distribution Project (4/2008 - 6/2008)
o Researched testing and permit requirements, prepared permit and
construction drawings
. Tyrone Sewer Feasibility Study (4/2008 - 6/2008)
o Prepared cost estimates for several design alternatives, performed
alternatives analysis to determine lowest cost solution
. Mercator Mineral Park Mill Project (8/2007 - 5/2008)
o Performed hydraulic calculations, sized and selected pipes and pumps
o Performed equipment weight calculations used to design foundations and
structural supports
o Produced piping and instrumentation diagrams in AutoCAD
. Pinto Valley Heap Leech Aeration Project (1/2008 - 4/2008)
o Performed primary design work, including basic aeration module layout,
performed hydraulic calculations, sized and selected air blowers,
prepared technical specifications and design criteria
. Kennecott Bulk Flotation Upgrade Project (9/2007 - 1/2008)
o Reviewed shop drawings of structural members prior to fabrication.
o Obtained quotations from equipment vendors, performed equipment bid
analysis and selection.
. Pinto Valley Restart Project (6/2007 - 8/2007)
o Performed asset evaluation including cataloging of existing piping,
equipment and instrumentation, supervised labeling of existing assets
Computer Skills
AutoCAD, MATLAB, PDMS, SolidEdge, MS Excel, MS Word