Post Job Free
Sign in

Project Manager Assistant

Location:
2135
Posted:
August 11, 2010

Contact this candidate

Resume:

Nick Vaks

*** ******** **** **** *

Brighton, MA 02135

617-***-****

****.****@*****.***

Professional Summary:

Strong project manager with the technical and personal skills to lead a

team through complicated and schedule driven projects while maintaining the

given budget. Able to plan and execute projects from renovations to new

construction while maintaining and expanding relationships with key clients

such as Owners and Architects.

Education:

Rensselaer Polytechnic Institute, Troy, NY, Class of 2004

Bachelor of Science in Industrial and Management Engineering with a Minor

in Psychology

Professional Experience:

Suffolk Construction Company, Inc., Boston, MA - (June 2007 - April 2010)

. Project Manager, December 2008 - April 2010

Boston Medical Center - Newton 8 North ICU/CCU Addition ($14M - 20,000sf)

o Eighth floor addition to the seven-story North Wing of the Newton

Pavilion to house new ICU/CCU suites without excessive disruption to the

adjacent occupied spaces as they remained open for daily use. These state

of the art suites utilize some of the industries latest technology

including new Strobic Isolation Room fans, LIKO patient lifts, and

Modular Services articulating medical gas boom arms equipped with power

and data outlets.

Boston Medical Center - Preston 3rd and 4th Floor Renovation ($4.6M -

9,000sf)

o Upgrade two floors of the Preston Family Building which included areas

such as Vascular Exam Rooms, Patient Holding areas, and Outpatient

facilities.

Boston Medical Center - Isolation Fan Replacement Project ($2.5M)

o Design-build project replacing outdated isolation fans atop the Newton

Pavilion with new redundant fans which include new HEPA filter boxes as

well as incorporating new TSI valves at each of the 26 isolation rooms.

Boston Medical Center - SICU Air Handler Installation ($1.9M - 3,200sf)

o Installation of a 20K Ton AHU on to the 5th floor of an occupied nine-

story building with associated electrical infrastructure upgrades

including new switchboards and distribution panels for existing areas and

future use.

Boston Medical Center - Endovascular Holding Renovation ($1.3M - 2,700sf)

o Phased renovation of an Inpatient Holding area for the adjacent Operating

Suite and Catheterization Lab. This project had to be a level 4 ICRA

making the coordination of the trades extremely important during

preconstruction and even more so throughout its execution.

Beth Israel Deaconess Needham Expansion ($30M - 44,000sf)

o One of three PM's responsible for managing the South Wing Expansion

Project which added a state of the art Emergency Department with 19

treatment bays, separate area within the Emergency Department for

pediatrics, 20 private inpatient rooms, new MRI suite, and two acres of

site upgrades.

. Preconstruction services provided as PM for SCCI include the following

projects: Occupational Health & Urgent Care Renovations ($1.6M), Hybrid

Operating Room ($4.5M), and Ophthalmology Dept. Renovation ($7M).

. Assistant Project Manager, June 2007 - December 2008

Boston Healthcare for the Homeless Program ($24M - 84,000sf)

o Complex 80,000sf gut and rehab of the historic Mallory Building including

demolition of interior walls, adding structural steel to create new

floors and lend additional support, repointing of the exterior masonry,

replacing all the windows, and numerous historic renovations. The new

facility specifically geared for homeless patients now houses exam rooms,

patient rooms, HIV clinic, dentist office, pharmacy, and a full kitchen.

One of the biggest challenges was the building's location which is in a

dense and heavily traveled area of the city.

. Other notable projects worked on as APM while at SCCI include: Sharon

Hospital, Sharon, CT (33,000sf) - MRI addition, Emergency Department

renovation and addition, and Women's OB Center. Caritas Norwood Hospital

Endoscopy Suite, Norwood, MA (1,600sf) - Endoscopy suite including prep

room, recovery space, and exam rooms. BMC Preston 5th Floor Renovation,

(5,500sf) - Physical Rehab Dept. renovation.

Shawmut Design and Construction, Boston, MA - (May 2004 - June 2007)

Construction Management Skills Training (CMST) Program

CMST is a unique program focused on developing the three main areas

of construction in young professionals - Project Management, Site

Supervision, and Estimating. The program allows recent college grads to

gain a comprehensive understanding of how to run high profile projects

seamlessly through on-the-job training.

NICK VAKS - Professional Experience (continued)

. Assistant Project Manager - Assisted in the management of multiple

projects simultaneously while managing ongoing changes and maintaining an

accurate record of the jobs for repeat clients such as Montblanc, Shane

Co., Longchamp, and Van Cleef & Arpels on 5th Ave in NYC.

o Key deliverables in addition to world class client service include

submittals, RFI's, procurement logs, cost management logs, Owner and

Subcontractor meeting minutes, Owner and Sub Rider packages, project

schedule review, billings, collections, cost to complete reports, job

close-out, and punchlist management.

. Assistant Field Engineer - Established and maintained control lines,

elevation benchmarks, utilities layout, and column lines & heights for

subcontractors by using the Builder's Level, Transit, and Total Stations.

o Provided layout and final engineering certification for steel bearing

piles at projects such as Boston Children's Museum, MIT, Tufts, Harvard

Medical School, and New England Baptist Hospital.

o Assisted in developing Topographical Site Surveys using Carlson Surveying

and AutoCAD programs on projects such as the Andover Newton Theological

School, Sovereign Bank, and Noble & Greenough School.

. Assistant Estimator - Responsible for drawing/document review to develop

an understanding of the project scope of work, generate bid books, and

relay all information to the incoming Project Management staff.

o Managed the reprographics process in new national markets to ensure all

documents are made available to all Subcontractors invited to bid for

fair, accurate, and comprehensive bid evaluation.

o Created Bid Books for existing clients such as Apple Computer,

Nordstrom's, and McCormick & Schmick.

o Successfully bid on new accounts such as Cartier, Tiffany's & Co., and

Salvatore Ferragamo resulting in new client acquisition and subsequent

projects even after many prior failed attempts.

Jay Cashman Incorporated, Dorchester, MA

. Assistant Superintendent, Summer 2003

Boston Harbor Gas-line Project ($12.2M)

o Coordinated the distribution of approximately $12,000 of daily quarry

rock material delivery according to the existing layout to improve

logistical production efficiency for our barge loaders and the incoming

dump trucks.

o Processed field documentation such as daily superintendent reports,

stockpile tickets, and provided daily pier settlement calculations.

Massey Construction Corporation, Swampscott, MA

. Assistant Project Manager & Field Supervisor, Summer of 2002

Participated in all aspects of Construction Management from researching

potential commercial projects to obtaining bid bonds, plans and

specifications, and providing complete and comprehensive estimates for

public bid projects. Once a project was awarded to us, I was responsible

for the complete buy-out, project management, representing the company at

Owner's meetings, payroll, and accounting from start to close-out.

Comfort Station at Harold Parker State Forest, Andover ($.6M - 3,000sf)

o Managed and provided field supervision for the out-of-ground bathroom

facility at a HPSF campground area for the MA Dept. of Conservation and

Recreation.

Addition to Field House at Phillips Park, Swampscott ($.3M - 1,800sf)

o Managed and provided field supervision for the out-of-ground expansion of

an existing High School sports complex including locker rooms, showers,

medical training office, and coaches' offices.

. Assisted with hands-on carpentry & labor along with the management in

completing the renovations of the Veterans Home Project for the Chelsea

Housing Authority and the Brookline Swimming Pool and Bathrooms

Renovations for the Town of Brookline.

Kokusai Semiconductor Equipment Corporation, North Billerica, MA

. Purchasing Agent Internship, Summer 2001

o Requested the expedition of components for Digitally Controlled Diffusion

Furnaces while maintaining solid customer base with vendors.

Richard Dedrick Carpentry Incorporated, Lynn, MA

. Carpenter's Apprentice, Summer 1997 - Summer 2000

o Performed a variety of residential construction carpentry work including

demolition, concrete foundations, wood framing, drywall, flooring, finish

carpentry, kitchen remodeling, decks, roofing, shingling, and painting.

Computer Software/Systems:

Microsoft Word, Excel, PowerPoint, Quick Books Contractors Edition, C++,

SolidWorks (AutoCAD), Netscape Web-design, Carlson Surveying, Prolog,

Timberline, Primavera Expedition, Oracle, and VELA.

References available upon request



Contact this candidate