SUMMARY

Electrical Engineer with 23 years of experience in project management.

JULY 2008 to PRESENT - LEADING ALL ELECTRICAL WORKS

IN THE INSTALLATION OF A 28 MW EXPANSION TO

EXISTING 38 MW POWER PLANT IN PIMENTEL,

DOMINICAN REPUBLIC, 2 MILLIONS

Leading the electrical team in all installation and

construction job

which include PLC, 13.8 kv switchgear, 480 volt switchgear, and

plant extension buildings electrification. Additional

responsibility

included the qualification, selection, and supervision of local

contractors.

2007 TO JUNE 2008 - PROJECT ENGINEER TO LE$$ (LEAN

ENERGY SOLUTION SYSTEMS) A CERTIFIED

AFFILIATE OF EASI,INC.

Responsible of plant top surveys to correlate electrical invoices

and justified savings commitment. Conduct engineering study

and design custom energy conservation sytems to reduce energy

consumption and lower electricity bills. As a turn key project

engineer installation, measurement, and verification are

activities

under our management responsabilities.

2006 - LEADING ALL ELECTRICAL WORKS IN THE

INSTALLATION OF A NEW 38 MW POWER PLANT IN

PIMENTEL, DOMINICAN REPUBLIC, 2 MILLIONS

Effective coordination of three electrical contractors resulted

in complying to a very tight schedule to complete the job in six

months as committed with the Compania Dominicana de

Electricidad. A 50 crew in 70 hrs per week schedule made all

electrical construction and wiring(control, instrumentation,

power, 13.8 KV transmission cables, and site electrification)

to integrate four 9.2 MW Generators, a Fuel treatment Plant, a

Heat Recovery Unit, Middle Voltage Switgear, 480 volts Load

Centers, 9 PLC based controllers(Modicon), and a 4

workstation control center.

2005 - INSTALLATION OF TWO STATIC EXCITATION

SYSTEM FOR TWO 216 MW GENERATORS AT

PALO SECO STEAM PLANT, 2.5 MILLIONS

Three major components integrated mechanically and electrically

were the ECS2100( microprocessor based controller), 600 KVA

Power Potential Transformer, and a

collector assembly coupled to the generator rotor.

Field engineering and all electrical protection and control

interfaces were developed by our local resources; rotor

machining and collector assembly balancing were supervised and

performed by Siemens with the support of our personnel.

The complete installation installation was ready for start up

two weeks ahead fron the schedule.

2003-2004 - INSTALLATION, START UP AND COMISSIONING OF

TWO BOILER CONTROL SYSTEMS FOR TWO 85 MW

UNITS AT GUAYANILLA STEAM PLANT, 2.6 MILLIONS

A 100% retrofit to the boiler control system to replace the

original

pneumatic control system with microprocessor based distributed

control system including all field instrumentation, actuators,

and valves. Field engineering, start up,validation and

commissioning were performed by our team in a dynamic

interaction with the customer.

2001-2002 PRODUCT SUPPORT ENGINEER IN A LOCAL

MANUFACTURE REPRESENTATIVE

Technical support to sales and field engineers as well

as to customers in process related problems. Conducting

load studies to determine the need of power improvement

devices.

1984-1999 PROJECT ENGINEER, AND GENERAL MANAGER

OF ENGINEERING PROJECTS AND CONTRACTS

IN THE MAINTENANCE DIVISION OF THE ELECTRICAL

SYSTEM, PUERTO RICO ELECTRIC POWER AUTHORITY

Leading the Electric / Instrumentation Department in charge of

developing technical specifications, bid analysis and contract

awarding recommendation, contract management as well as

project supervision and acceptance. Major retrofitting of

control systems for all PREPA power stations have been

succesfully completed, updating the power generating units

with digital microprocessor based control systems and

equipments.

1990. Project Manager in charge Instrumentation and Controls in the

Electrical / Instrumentation Department.

1984. Head of the Electronic Instrumentation Section at the South Coast

Thermoelectric Power Plant, Guayanilla. In charge of maintenance

of electrical / electronic instrumentation systems in the plant.

1972-1977 Maintenance Engineer in the Electronic Instrumentation Section of

South Coast Thermoelectric Plant, Guayanilla, Puerto Rico.

1969-1972 Electronic Engineer at the Tele-Comunications Department of the

Atlantic Fleet Weapons Range Development Department in

Roosevelt Roads Navy Base, Ceiba, Puerto Rico.

1967-1969 Engineer / Scientist at Douglas Aircraft Manufacturing Plant in

Long Beach California.

EDUCATION

Bachellor in Science of Electrical Engineering

RUM ( Recinto Universitario de Mayaguez ) 1967

MEMBERSHIP

Colegio de Ingenieros y Agrimensores de Puerto Rico

Ingeniero Licenciado, Licencia Num. 12233 PE