Post Job Free
Sign in

Project Manager

Location:
Jackson Heights, NY, 11372
Posted:
August 14, 2010

Contact this candidate

Resume:

EDDY G. VITERI

**-** **** ******

Apt.*K

Jackson Hts., NY

11372

347-***-****

********@*****.**

m

CAREER OBJECTIVE:

( Seeking to be part of an architectural team that offers a

challenging opportunity to utilize my proven skills, progressive

experience and creativity for successfully accomplishing the

projects.

WORK EXPERIENCE:

Apr. 2009- ( BRONX LEBANON HOSPITAL CENTER, Bronx, NY

Dec. 2009 Project Manager

- 1276 Fulton Division - 1650 Grand Concourse Division

- 1650 Selwyn Division

. Responsible for (1) expediting, (2) LL violations removal,

(3) building codes research and compliance as per NYC / NYS

building laws, (4) tracking, correcting & disposing of

construction, elevator & boiler violations (5)heavy interface

with regulatory agencies DOB (Dept. of Buildings) and ECB

(Environmental Control Board). Plan and design interior

building alterations for the hospital facility and prepare

architectural, electrical and mechanical construction

documents to execute the scope of the alteration. Reviewed

and approved construction costs / competitive bids and

supervised execution of the work.

Jan. 2005- ( CETRA RUDDY INCORPORATED, New York, NY

Jan. 2009 Job Captain / Architect

- 133 W, 22nd Street, NYC

. Collaborated on reviewing the DD set and producing CDs for

this 150M, luxury residential building that is a 160.000 SF,

13-story structure with a curbed glass fa ade,100-units condo,

a 2-Fl underground garage, 9'-4" windows, a ground level gym,

open courtyard with pool & a rooftop park like area. Worked

reviewing & detailing some of the two elevations elements ie.:

storefronts, balconies, terraces, parapets, windows, railings,

ornamental columns, panelized facades and the underground

parking. Coordinated the CDs with all disciplines & trades

during the design, bidding, pre / construction phases. In

charge the CA phase and producing the Offering Plans, DOB set,

egress plans and all documents to secure parking permit & COO.

- 77 Hudson, Jersey City, NJ

. Contributed to the DD & CD phases of this 451M, 1.3M SF mixed

use complex that is 2-faceted 48- story rental & condo towers

with 901units, sit atop an 11-story commercial parking & a

35.000SF rooftop park. Responsible for the design & details of

the vertical transportation ie: garage / towers core / egress

stairs, elevators, connecting ramps, corridors & egress paths.

Detailed the railing systems for the garage ramps & parking

perimeter. And collaborated in the development of the

exterior garage facade & parking design

- 303 3rd St.,Cambridge, MA

. Worked in producing CDs for a 253M, 841.000sf co-op project

that is dual 8-story residential towers with 531-units, a

200,000SF underground parking, a one-acre open garden

courtyard & a complex eight-finish material facade. Designed /

detailed the entire roof system, stair / mechanical bulkheads

and coordinated with all engineering disciplines. Plus, I

developed & detailed the storefront system for the ground

floor retail space and the railing systems for all balconies,

terraces, building setbacks & all interior duplex units

- 63 Barbizon, NYC

. Assisted on the DD phase of a 150M conversion luxury condo

project of this 210,000 SF, 1927 structure that is a 23-story

neo-gothic tower with 66 units. Its scope included relocation

of building core, double height penthouses, terraces, 7'-0"

French casement & some 14'-0" rosette windows added to the

historic facade. Worked on the interior layout development &

detailing of the reflected ceiling / flooring systems.

Proposed solutions to address the sensible issue of replacing

all windows to a well known NYC landmark.

May. 2003- ( TPG ARCHITECTURE, New York, NY

Dec. 2004 Project Architect /Architect

- Robeco, NYC

. In charge of producing and reviewing the CDs set for a 4

floor, 2M-office renovation project for Robeco. Duties

included site surveying, on-going work inspection, addressing

CO/RFI and contract administration.

- The Grumman Headquarters, NY

. Assisted on the CD phase of a 15M, 2-floor renovation project

for the largest U.S. defense contractor, Grumman. It's scope

included design & detailing of an interior elevator, 2 lobbies

& one new egress exit.

- H & M International, NYC

. Collaborated on the DD & CD phases of the first H&M store in

the U.S at 5th Ave. Developed and detailed the store vertical

transportation system including escalators, elevators &

stairs for this 3 story, atrium like, 35,000 SF retail space.

Contributed to the design of the exterior / interior store

facade & store sections.

. In addition, I worked on the SD phase of a 2M-apartment

renovation in the famous Chrysler building. The scheme

included combining 4 dwelling units on the 59th Fl. & (1) on

the 60th Fl. into a single duplex unit.

Mar. 2002- ( WASA & ASSOCIATES, New York, NY

Apr. 2003 Staff Architect

- JCAL, Queens, NY

. Responsible for editing and detailing the CD set for this

NYDDC, 4M renovation project that is a 4 story cultural

center with music, educational and art display spaces. In

charge of handling the filing process of projects for DOB's

approval. The scope included: preliminary zoning analysis,

site surveying, as-built & fire protection drawings

production, architectural design updates, DOB's review & code

compliance.

. Additionally, I worked in the conceptual & schematic design

phases of David Z, a 6,000SF high-end shoe store. Also,

detailed all costume millwork for The Norfolk Medical Center

in the Bronx.

. Acted as an Owner, Architect, Interior Designer, Project &

Construction Manager by designing & detailing all

architectural & engineering documents to construct two

private residences of my own, in S.A. Ecuador

Nov. 1999- ( STV GROUP, SILVER & ZISKIND, New York, NY

Jan. 2002 Project Architect /Architect

- Curtis HS, Restoration & Preservation, Staten Island, NY

. Assisted in designing, specifying, and detailing the 800-

drawings CD set needed to preserve and restore the elaborate

gothic architecture of this 100 years old, 6-building complex

landmark. The scope of this 26.5M, NYSCA conservation & re-

habilitation project included material & construction methods

research.

-In-Tech Academy, MS /HS 368, Bronx, NY

. Teamed up to create an entire design scheme and to produce

the 300-drawings CD set for a new 72M, pilot Middle / High

School facility that is a 168,000 SF, 3 story state of the

art school on a fast track, 5.5-month schedule. Responsible

for assisting in all the phases from conceptual design to the

actual bid set.

. Also, produced full architectural CD bid sets for a citywide

NYC Boiler Replacement Project. The scope called for

architectural & structural works to accommodate a new heating

system for 20 school buildings.

. And as PA, I managed the renovation of four NYC homeless

center projects. The scope extended from drafting reports &

budgets, producing CD sets, and coordinating their

construction until their final sign-off.

Nov. 1998- ( ROCKWELL ARCHITECTURE, New York, NY

Oct. 1999 Architect

- The Kodak Theater, Hollywood, CA

. Collaborated on the DD and CD phase of this 94M venue, home

of the "Academy Awards", ceremony, The Oscars. The design is

part of the new Trizechan Centers and consists of the

forecourt, the orchid walk, the Grand Rotunda & a 60,000SF

auditorium. Responsible for developing: the theater access

ramps & corridors sections, circulation & egress

interior/exterior/stage stairs and stage house cross

sections. Assisted in creating and further exploring theater

transversal / longitudinal sections, and interior elevations,

Contributed to elaborating lobby/grand stair elevations,

sections and conceptual details. - Also worked on (2) theme

restaurant projects for the Playdium Co. at Canada.

Feb. 1998- ( MANCINI * DUFFY, New York, NY

Oct. 1998 Project Architect

- ING Barings Headquarters, NYC

. Collaborated on the construction documents phase of this 100M

that is 350,000 SF, 10-floor renovation of office space to

suit the merge and house the headquarters in NYC. Responsible

for the production and elaboration of the entire pricing,

bidding, and CD sets for two floors (2nd & 7th floors) as

well as the CA phase. Also, assisted in the DD phase of

other two floors (33rd & 35th). Coordinated with ING-BARING's

brokers, and partners, building management, mechanical,

electrical, structural, building code, security, audio /

video, and architectural millwork consultants. Also,

coordinated with Mancini's interior design staff in order to

produce design alternatives and new schemes at owner's

representative request.

Aug. 1997- ( MELTZER MANDL ARCHITECTS, PC, New York, NY

Jan. 1998 Staff Architect

- The Cambridge House, NYC

. Assisted in the design development and construction documents

phases of this residential conversion project. Responsible

for field surveying, updating floor plans and elevations, and

detailing solutions for new design and remedial work.

Coordinated with structural and interior design disciplines.

Worked on the design development phase of a new 7 story,

60,000 SF housing project.

- Hughes Ave. Condominiums, NYC

. Worked on a 25,000SF, 30M residential conversion project.

Contributed to the design of its interior elevations,

exterior access ramps / stairs as per ADA, and building

transversal sections.

Jul. 1996- ( HIGHLAND ASSOCIATES, PC, New York, NY

Jul. 1997 Cad Architect

- XEROX Showroom & Headquarters, NYC

. Collaborated on the DD phase of this 20.000 SF renovation

project for a 15M Virtual Showroom designed to display and

educate about XEROX products. Prepared layout alternatives in

2D and 3D formats. Also, worked on the 75M NYC Xerox

headquarters that is 100,000 SF, 3-floors of office space.

Responsible for surveying all floors, assisting in the

conceptual design of a 3 floor circular atrium (prepared a 3D

model, a rendering, and a walk thru); drafting & editing

design alternatives for bid & construction documents.

- ChemNetwork, Data Center, NJ

. Assisted on the DD & CD phase of this 55.000 SF space

conversion into a 25M high-tech Data Center for the Chase

Manhattan Bank, The high security design included a 15,000sf

command center, a 2,500sf cafeteria & bullet resistant glass

/ walls. Responsible for editing, drafting, & detailing

designs alternatives.

- AT&T Care Center, PA

. Worked on a 2 floors renovation project for AT&T Co. Also,

surveyed 250,000sf of office and warehouse space to create as-

Built drawings for code review & building upgrade for the

Nobody Beats the Wiz Corp.

EDUCATION:

( CITY COLLEGE OF NEW YORK

Bachelor degree in Architecture

Bachelor degree of Science in Architecture

CAPABILITIES:

( Proficient in AutoCAD 2008-2010, MS:Office Suite 2007.

Professional training in Revit 2010, Sketchup 5.0

( Computer Graphics i.e.: 3D-modeling / rendering / walk-through

& graphics presentations. Photoshop CS4

( Project Management i.e.: coordination, scheduling, cost

estimating, field surveying, drawings take-off.

( Construction Administration i.e.: addressing COs, RFIs,

reviewing materials/trade shop drawings, high-end construction

inspection, knowledge & preparation of NYC agencies requirements

for Condo Declaration.

( DOB Experience i.e.: filing for TC of O / C of O, tracking,

correcting & disposing of DOB/ECB violations

( LEED Accreditation: on progress



Contact this candidate