Post Job Free
Sign in

Project Manager Engineer

Location:
Rancho Cucamonga, CA, 91730
Posted:
September 20, 2010

Contact this candidate

Resume:

Martin Ackerson Home :

909-***-****

**** ******* ****

Mess : 909-***-****

Rancho Cucamonga, CA 91730 EFax:

760-***-****

OBJECTIVE

To pursue a technical career within a Construction Management, Engineering,

General Contracting, or City Utilities Organization. I would like to grow

with a company eventually taking on leadership responsibilities as a Senior

Project Manager, Jobsite Superintendent, Chief Program Manager / Project

Controls, Scheduling Engineer, or Lead Services Director.

EDUCATION

Bachelor of Science Degree in Construction Engineering (September 1993 -

June 1997)

California State Polytechnic University, Pomona, California Emphasis

in Construction Management - Structural Civil.

Associate of Science Degree in Construction Technology (September 1984 -

June 1989)

Don Bosco Technical Institute, Rosemead, California

Completed five years of technical education. The training consisted of

comprehensive knowledge in Carpentry, Plumbing, Electrical, Architecture &

Design, Construction Surveying, Concrete Masonry and HVAC. Completed

support courses in Project Management, Blue Print Reading, Cost Estimating,

Applied Statistics, & Strength of Materials.

PROFESSIONAL EXPERIENCE

Consultant Scheduling Engineer/ Schedule & Program Development; JD

DIFFENBAUGH (Aerotek); Riverside, CA (07/08 - 11/09)

Project(s): 08-252 St Thomas Moore Parish Church, Irvine, CA \\

Hilton Garden Inn, Ontario, CA \\ 08-212 Cambria Suites Hotel \\

07-265 Birtcher at Bellagrave, Riverside, CA \\ 08-236 Vista Del

Sol, Redlands, CA.

Responsible for hands on schedule development from small to large

projects in various types of construction. Supports Estimating, Manages

Operations and Incorporates Staff on planning of high level Project

Schedules & Review Analysis Reporting. Generates initial construction

schedules of assigned projects, incorporating permit and prelim schedules

from staff & project history and implements new strategies / procedures

from startup thru to completion for project success. Develops and

implements Work Breakdown Structure, Work Item Lists, CPM Timetables,

Prelim Master Schedule, CPM Development, Resource and Cost Load Reports

as required per specification. Generates Final Construction

schedule based on construction drawings in coordination with operations

dept and general superintendent. Performs schedule monthly reports

and forecasting, Time Impact Analysis and As-Built Development for

closeout.

Consulting Engineer / Scheduler; Hal Hays Construction, Riverside, CA

(10/07 - 06/08)

Project(s): Army Corp of Engineers: # 8006-ASCE-MATOC CONUS New Entry

Point, Offutt AFB, NE

Develop the EVMS baseline - project schedule and track activity during the

project phasing and stages regularly. Schedule required resources,

identify project risk factors, and develop contingency plans forecasts with

GC-Project Managers Army Corps. Track resource requirements across multiple

projects ranging in 10 - 150 million dollar range. Communicate project

status and technical issues to the customer Track and coordinate

engineering, manufacturing and purchasing activities related to projects to

GC and Military OAR representatives accordingly. Manage and report abnormal

conditions and alternate activities on-going at military base -

installation. Ensure that all applicable system documentation, including

service/training manuals, is available and accurate as schedule. Coordinate

customer acceptance / testing at factory and customer sites with General

Contractor / Army Corp of Engineers personnel. Resource and Cost Load

schedule by CSI Division / WBS Structure specification, requirement all in

Primavera format.

Construction Inspector ; PBP Consulting; AEROTEK, Ontario, CA (03/07 -

09/07)

Project(s): Retro-fit New expansion joints at water tanks. Victor

Valley Water District, Victorville, CA.

Inspect General Contractors work in progress for conformance, materials to

be used, monitor Heavy Equipment usage for Safety, and that all daily

activities are per Contract Specifications at site. Investigate GC work as

necessary to insure compliance with all Federal, State, and local laws.

Maintain the required diaries, daily reports, as built DWG's and other

similar records for each phase of retro-fit / expansion joint upgrade(s)at

construction project office routinely. Provided liaison with residential

communities and business owners within vicinity of project.

Project Engineer ; Dynalectric - KDC Systems (EMCOR GROUP) Los Alamitos,

CA (07/06 - 02/07)

Project(s): California Department of Transportation: 91/215/60 Interchange

Freeway Widening (EA 08-334844)

Build and provide construction baseline schedule using Primavera

Suretrak. Monitor, control, and update monthly project schedules.

Maintain current schedule information for project controls. Prepare all

Change Order Requests and Agreement Change Orders, maintain Change

Requests documents, files, and log. Review Change Order Requests pricing

status, and shop drawing status with project manager, Superintendent, and

Owner. Purchase Orders and work orders as directed by Project Manager and

Jobsite Superintendent. Maintain a complete and current set of

"As-Built" Drawings reflecting all changes from the base contract

documents, including approved Change Orders, Addenda, Field Orders,

Clarifications, correspondence, and field conditions.

Email: **************@*****.***

PAGE: 1 OF 2

Martin Ackerson Home :

909-***-****

7468 Addison Road

Mess : 909-***-****

Rancho Cucamonga, CA 91730 EFax:

760-***-****

PROFESSIONAL EXPERIENCE (continued)

JOBSITE SUPERINTENDENT ; PAC WEST Construction Company, Burbank, CA

(07/05 - 04/06)

Project(s): Los Angeles Harbor College-Prop. A/AA Bond Nursing &

Humanities Bldgs (ID# 03H.6307.03 / DSA# 10734)

Run the day to day field operations at site. Worked and improved all Field

activities, Re-built Construction Schedule as well as submitting on

monthly updates using primavera for approval. Implement forms for jobsite

control and utilized construction methodologies for timeliness and cost

reductions to school. Forecast and planned for weather conditions and

called on Inspections Requests regularly. Also, improved on "TIA" time

impact analysis reports for time re-gained to overall contract completion

date. Provided Estimates of Work, Field Work - Job bulletins and Change

Orders where needed. Inspected work for conformance with building and

local city codes. Improved project relations with OAR & School officials

by completing project on time & under budget.

Construction Engineer / Scheduler; Olivas-Valdez - Harris & Assoc (Joint

Venture),Corona, CA (02/01- 12/04)

Project(s): Caltrans : 71/91 Santa Ana River Bridge Widening (EA 08-

3564U4); 91 Magnolia to Arlington (EA 08-4353U4);

and 91 Mary to 60/91/215 Interchange (EA 08-4221U4).

Manage the operational aspects of multiple projects assuring quality,

budgets, scheduling, and clients needs are met, Caltrans specs are

followed, and that accurate and timely documentation is maintained. Review

and perform Baseline Schedule review analysis. Develop and maintain

schedules, labor forecasts, and PC reports. Manage schedule variances,

verify project progress thru each submittal update, and communicate early

problems to senior management. Gather, enter, update and analyze Progress

Updates for Schedule Reviews. Supply Project Forecasts and Monitor Project

performance. Work with other departments as required to update internal As-

Built schedules.

Project Engineer, Parr Contracting Company, Hawthorne, CA (06/99 - 01/01)

Project: Walt Disney Concert Hall, Downtown Los Angeles, California

Track and Log all contract documents, DWG's, submittals, RFI's, COR's and

verify all info on. Disbursement of contract docs and material to ALL

parties (i.e. SUPT., Field, PM's, subs). Prepare submittal and field/

Office TEAM schedules for procurement and sequence. Stay current with AS-

Built drawings for weekly updates. Alleviate Project Coordinator and Supt.

on WDCH Team meetings to maintain Field / work schedule overload. Estimate

and cost COP's as necessary from generated AWA's for control.

Project Manager / Scheduling Engineer, William Yang & Associates, Burbank,

CA (011/98 - 06/99)

Project: LAUSD BB Bond Construction Repair Program, California

Oversee and manage development of BB Bond Construction projects per LAUSD

cluster # 6/ M & O area 4. Develop, coordinate and implement job site

usage plans, and review school site conditions. Monitor Construction

progress and contractors adherence to work schedule. Assure work is

performed to construction standards and shop drawings, submittals are

processed. Determine when change orders are required and assist in the

finalization/ negotiation of charges. Monitor enforcement of all

contracts, request for reduction in retention amounts, liquidated damages,

monthly & final payment requests. Review school site safety programs and

conduct jobsite visits. Administer closeout, post acceptance and

occupation activities including final equipment and system tests.

Senior Construction Inspector, Freeman Alternative Resources, Newport

Beach, CA (09/97 - 10/98)

Project: LA County Dept. of Public Works, Alhambra, CA / Project # 149.

Storm Drain Program & Flood Control

Assist Department's contractor in understanding intent of contract

documents, codes and safety orders per specs. Inspect work in progress

for conformance of work, materials, and equip. with contract docs.

Investigate as necessary to insure compliance with Federal, State, and all

local laws of work by contractor. Maintain required diaries, daily reports,

as built / bench DWG's and other similar records for each project.

Project Manager, Oltmans Construction Company, City of Whittier, CA (07/95

- 09/97)

Project: The California Speedway, Fontana, California

Responsible for soliciting subcontractor proposals and awarding sub-bids.

Prepared subcontractor scopes of work per DWG's and project manual

criteria. Track and control Field work crews to maintain schedule and on

time planning. Submit monthly office budget and processed change order

proposals. Coordinate sub-contracts with structural architectural plans.

Review shop drawings and submittals from subs. Attend meetings and process

minutes topics and critical issues. Control field JWO's and signed on

changes, building permits regularly.

RELATED SKILLS

* Familiarity with projects from Remodels, Tenant Improvements, Tilt-Ups,

Bridge and Highway to New Specialty Type Construction.

* Supervise Multiple projects from design phase development through

Construction management.

* Proficiency in development of resource loaded design, construction

schedules, WBS, & Time Impact Analysis.

* Experience using Primavera P3e (P5/6) Project Planner, Suretrak,

Expedition, Claimdigger & Microsoft schedule.

* Strong Construction Scheduling, Field Inspection, Estimating, & Blue

Print reading skills for Project Controls.

* Able to prepare, present, & defend status reports and communicate

schedules to Project TEAM members.

* PC literate with all Windows, Prolog, Timberline, Adobe, MSOffice, Works,

Excel, Lotus, & diagnostic programs.

* Excellent Organizational Skills and Job completion within Time Schedules.

Possess oral & written Bi-lingual skills.

PROFESSIONAL REFERENCES Will be submitted upon request.

Email: **************@*****.***

PAGE: 2 OF 2



Contact this candidate