GREGORY C. GREEN, P.E.

**** ********* ******

Missouri City, Texas 77459

Phone- Home : 281-***-**** Cell: 713-***-****

Email: *******.******@*******.***

OBJECTIVE

Sr. Project Manager / Project Director

Where proven project management, coupled with precise coordination and

communications skills, will complement effective negotiations, analytical,

leadership, and organizational aptitude will foster company growth and

diversification through business development. Where keen and innovative

management techniques will improve processes and contribute directly to the

bottom line.

PROFESSIONAL SUMMARY

Senior Project Manager with more than 25 years of diversified leadership

with EPC and operating companies in design engineering, project management,

and construction of domestic and international projects, with project cost

up to $1.0 billion. Excelled on projects included refinery, plastics,

chemicals, power, commercial facilities, air separation plants, medical

facilities, cogeneration power plants, offshore platforms, and pipeline

design. History of emphasizing teamwork between owner, EPC, and contractor

with a unique blend of' "root cause" problem solving, organizational, and

interpersonal skills that achieve project success and significantly

contributed to the bottom line with a focus on cost, schedule, quality, and

safety. Received one year of specific training from Rice University in

Executive Management.

BACKGROUND SUMMARY

Maintenance Engineering Resource and Material Planning &

Develop International Labor Agreements Management

Lump Sum / Turnkey Contracts Customer Service / Satisfaction

Proposal Planning and Preparation Develop Policies and Procedures

Strategic Vision and Mission Planning Preventative Maintenance Planning

Budget Development / Management / Multi-site Management

Execution Review all Bid Documents

Contract Development Business Development

Staff Managed over 1000 Transportation Analysis / Planning

Staff Training / Development / Safety Training

Mentoring

International Experience: Suriname, Facilities Development

Jamaica

Maintain Overall Project Budget Develop Project Schedule

Supervise all QA/QC Activities Develop Project Specifications

Secure Land Lease Agreements Secure all Permits

Familiar with all codes including ASME

B31.1, B31.8, B31.3, OSHA, IEEE, etc.

SELECTED ACHIEVEMENTS

. Successfully directed the engineering, construction and commissioning of

the first cogeneration power plant built within an existing operating

refinery (LCR). The total allocated budget was $352 million. Streamlined

the engineering effort, without sacrificing quality, increased

construction productivity and bettered the completion schedule by one

month. I was also responsible for engineering, procurement and

construction of OSBL directional drilled piping to supply natural gas in

two locations. This included metering stations, and compression

terminals. ISBL, I was also responsible for EPC of two miles of above

grounding piping from the metering stations to the gas turbines. Result:

cost saving and additional revenue of more than $20 million.

. Developed an execution plan that streamlined the engineering,

construction and commissioning activities on a cogeneration expansion.

Mobilized the engineering effort at the plant site instead of the home

office. Utilized modular construction to minimize erection man-hours.

Result: a profit of $1.1 million on an $8.5 million contract.

. Supervised the engineering and construction activities on Unocal Oil's

crude processing unit expansion in southern California. The total

allocated budget was $300 million. By minimizing engineering revisions

and construction rework with a strong QA/QC program. I was responsible

for the engineering and construction of undergrounding and above

grounding piping to supply product from the units to the tank farm.

Result: completed the project under budget and ahead of schedule.

. Supervised the engineering and construction activities of the Amerada

Hess Refinery in St. Croix, the US Virgin Islands. The total allocated

budget was $1.3 billion. The engineering design and construction

specifications along with modified design criteria exceeded any then US

design codes. However, with strict supervision and a strong QA/QC

program. I was also responsible for engineering and construction of over

100 miles of undergrounding piping throughout the facility and 100 miles

of above grounding piping. Result: completed the project under budget

($100 million profit) and ahead of schedule.

. Hand picked by the Executive V.P. of Project Management and Construction

to take over a 550 MW cogeneration project that was in complete disarray.

The total allocated budget was $300 million. I was also responsible for

engineering, procurement and construction of OSBL directional drilled

piping to supply natural gas to the plant in two locations. This included

metering stations, and compression terminals. ISBL, I was also

responsible for EPC of one mile of above grounding piping from the

metering stations to the gas turbines. Executed the contract language

and prioritized construction activities:

a. Eliminated the OSHA violations.

b. Improved the quality scores from 65% to 95% (on a 100% scale).

c. Recovered excessive cost from the contractor.

d. Completed the project three (3) months ahead of the extended schedule.

e. Project cost savings exceeded $17 million.

. Supervised the engineering, procurement, construction, contract

negotiations and commissioning activities for twenty-three (23) projects,

ranging in cost from $50,000 to $30 million. Project Manager for the

Alcoa Alliance located in Suriname South America and Jamaica. Chosen by

branch President to succeed the first Project Manager, due to strained

client relations. Improved the overall strength of the alliance by

completing scopes of work with client involvement and increasing

personnel moral through empowerment. In addition, the client was

intimately involved in selecting vendors and contract development.

EMPLOYMENT HISTORY

Shell Oil

Sr. Project Manager 2006 -2010.

WorleyParsons, Deer Park, TX 2005 - 2006

Senior Project Manager

CALPINE CORPORATION, Houston, TX 2000 -- 2005

Senior Project Manager

PARSON'S POWER, Chattanooga, TN.

1999 -- 2000

Project Manager

KVAERNER ENGINEERING & CONSTRUCTION, Houston, TX.

1995 - 1999

Project Engineering Manager (1998 - 1999)

Project Manager/Sr. Project Engineer (1996 - 1998)

Project Engineer/Lead Structural Engineer (1995 - 1996)

LITWIN E&C, Houston, TX.

1992 - 1995

Senior Structural Engineer

ABB LUMUS, Houston, TX.

1987 -- 1992

Senior Structural Engineer

FITTZ & SHIPMAN, Beaumont, TX.

1983 - 1987

Structural Engineer

EDUCATION

Executive Management - Rice University, Houston, TX

B.S., Architectural Engineering, University of Texas, Austin, TX

LICENCES AND PROFESSIONAL MEMBERSHIPS

Registered Professional Engineer - State of Texas #73956

Chi Epsilon Honorary Civil Engineering Society