Post Job Free
Sign in

Sales Quality

Location:
El Paso, TX, 79938
Posted:
September 22, 2010

Contact this candidate

Resume:

Jos G. Barraza

***** ***** **** . ** ****, Texas 79938 . ************@*******.***

915-***-**** (cell) . 915-***-**** (office)

Objective and Career Summary:

My goal is to use my Lean expertise to develop effective Engineering and

Operations teams that can effectively launch, sustain, and improve

production processes driving operational excellence.

My expertise is developing / optimizing Production and Molding processes.

This includes program management of new automation, the production launch,

and process improvements. For 12 years I have also led operations teams

sustaining long-term operational effectiveness and ensuring the delivered

quality to the customer. My ability to implement Lean principles has been a

key to my success. Automation was designed to provide a robust process

unable to deliver defects. Teams were developed to follow a Lean culture

of urgency and irreversible corrective action. For 3 years I have developed

molding processes using scientific molding (Decoupled Molding) and

monitoring these processes with RJG technology.

Key Accomplishments and Qualifications:

. De-bugged and optimized new assembly automation for manual and

automated processes.

. Launched more than 10 new lines and 20 products in last 8 years,

process robustness, process controls, process capability, and quality.

. Plastic Injection Molding: fully understand scientific method for

developing injection process. Certified as Master Molder by RJG.

. Strong welding back round that includes, precision resistance &

compaction and ultrasonic. Have applied welding to stand alone manual

station and automated station applications. In depth knowledge of weld

parameter development.

. Certified by Q & M Consulting on Production Control Plan (PCP) 2nd

edition and Measurement System Analysis (MSA) 3rd edition.

. I been part of 2 Launches of new focused factories in Juarez, Mexico

with the last 2 companies I worked for.

. Had a Lead role on ISO/TS-16949 certification and re-certification,

implementing MWIs, process set-up documentation and preventive

maintenance.

. Project management leading PFMEA, Quality Control Plan, and process

validations.

. Met operational budgets for scrap, labor, and inventory.

. Developed self-directed teams with effective hiring, conflict

resolution, and relationship building.

. Developed individual team members with vision of future state,

expectations, and accountability.

. Led production operations training supervisors and maintenance, and

scheduling production floor.

. Trained teams on principles and implementation of Lean concepts of

pull system, one piece flow,

Kan ban, poke-yokes, and irreversible corrective actions to drive a

zero defect rate.

. Responsible for culture of safety: machine validation and workforce

expectation /participation.

. Fully Bilingual: English-Spanish

Stoneridge Corporation April 2006 - Present

Engineering Supervisor - Juarez, Mexico

Cabled Wheel Speed Sensors: $14 million annual sales, 14,000

parts/day, 3 shifts, 140 people

. I was part of the team that started Hi Stat Division operations in

Mexico.

. Reviewed product designs for manufacturability and design robustness,

and optimized with 20+ DOEs

. Using PFMEA, conceptualized process flows, poke-yokes, and production

control plans

. Integrated processes into existing Quality System and led resolution

of warrantee issues

. Developed system for daily analysis of all scrap, providing immediate

feedback of process controls

. Precision resistance welding: Electrode and process development using

DOEs. Have made several changes on electrodes design to improve

performance.

. Wire processing: stripping, crimping and process handling techniques.

. Led long term operational effectiveness: 3 ppm defect rate delivered

to customer.

. I was responsible for the implementation of RJG in molding machines.

. Scrap at .2% of sales (Goal is under .8%), Overall Equipment

Efficiency (OEE) at 89% (Goal is 80%).

Valeo Motors and Actuators Apr 2002 - Apr 2006

Manufacturing Supervisor - Juarez, Mexico

Compressors and Electric Motors: $18 million annual sales, 5,000

parts/day, 2 shifts, 90 people

. I was part of the team that transferred Compressors area to Mexico.

. Reached quality and production goals by reduction of PPM's process, as

well as scrap and down time

. I have successfully implemented Self directed Work Teams

. Used several methodologies and tools such as 5 "S", Kan Ban, multi-

skills, one piece flow, SMED, TPM, QRQC (Quick Response Quality

Control), Problem Solving Groups, all this focused for continuous

improvement.

. Ultrasonic welding of plastics.

. Developed of processes, work instructions and First piece inspection

check list.

Yazaki North America May 2000 - Apr 2002

Quality Assurance Divisional Engineer - Juarez, Mexico Jun 2001 -

Apr 2002

Automotive Harness: $120 million annual sales

. Received and followed up quality complaints of harnesses from 8

Chrysler assembly plants.

. Managed quality alerts, Non Conformance Tickets (NC s).

. Leaded the responsible harness' plant to solve the customer complaint

or problem.

. Evaluated the corrective actions effectiveness for the customer's

complaints.

. I coordinated the Process Sign-Off (PSO) of all the 8 harness plants.

. Auditor of Quality systems for each of the plants.

. Developed an Intranet file to reach the standard of measurement tools.

Program Supervisor - Juarez, Mexico Sept 2000 - Jun 2001

. Coordinated production programs.

. Responsible for circuit inventories, budgeting, and assurance of

circuit quantity in the production lines.

. Provided support to continuous improvement efforts.

. Responsible and successfully transferred the wire cutting area to

another Yazaki plant.

. Supervised and directed 7 Programmers and 8 people in-charged of

materials.

. Responsible for cycle counts

Production Supervisor - Juarez, Mexico May 2000 - Sept 2000

. Supervisor of different production areas

. Developed self-directed teams with effective hiring, conflict

resolution, and relationship building

. Introduced strategies to reduce personnel rotation and absenteeism.

. Enhance and oversee production programs.

. Repeatedly recognized for developing strong, positive culture on the

production floor.

. Planned and utilized strategies to improve quality and meet production

requirements in the wire cutting area.

. Planned machinery maintenance schedules.

. Monitored machinery set up and production processes and improved the

cutting machines' efficiency.

Education:

-Universidad Aut noma de Cd. Ju rez. Industrial Engineering, - currently

enrolled on my 8th semester.

-Instituto Tecnol gico de Cd. Ju rez. Electromechanical Engineering, - Up

to the 7th Semester

-Master Molder by RJG.



Contact this candidate