L-*** County Rd * Grelton, Ohio *****● 419-***-**** ●**********@*****.***
Scott Burchfield
Objective Interested in the Maintenance Profession and Mechanical/ Electrical Engineering.
Educatio Northwest State Community College Archbold, OH
n
Industrial Maintenance Certificate
Industrial Electrical Certificate
A.A.S. – Mechanical Engineering Fall 2005 – Present
Seeking B.S. – Electro/Mechanical Engineering
Moline High School Moline, IL
Illinois Department of Education GED Mt. Sterling, Illinois
G.E.D. Certification
Experien Cutting Edge Countertops Perrysburg, Ohio
• Complete daily machine and building
ce maintenance.
• Create PM program to keep the CMS, Speed,
Napol
Shoda, and Burbana CNC’s functional.
eon, OH
Campbell Soup Company
Maintenance Supervisor October 2006 - June 2009
• Worked as an off shift maintenance supervisor with dual role responsibility as a
Production Supervisor as well.
• Oversee and Supervised 15-50 personnel in their day-day Manufacturing
procedures.
• Implemented everyday maintenance tasks like Preventative, Corrective, and
Scheduled Maintenance.
• Closely worked with SAP engineers with implementation in our processing
environment.
• Worked with the employees, as a power user, improving the training
environment in the Maintenance department.
Diehl Inc. Defiance, OH
General Maintenance Technician 2006-2006
• Did all areas of maintenance; mechanical, electrical, pneumatic,
welding- both tig and mig, and plumbing.
• Worked briefly with refrigeration, ammonia, and boiler systems.
International Beef Production Joslin, IL
Processing Maintenance Technician 1999-2001
• Maintained multiple sizes of conveyors both hydraulic and
pneumatic.
• Did setup for and ran the production floor before the first
shift change.
• Worked with minor manufacturing of aluminum and stainless
conveyor systems.
• Installed and troubleshot miscellaneous electrical circuits.
Tri-City Fabrication & Welding Davenport, IA
Bench Grinder - Robot Welding Operator 1997-1999
• Began as a Bench Grinder and moved up to a Robot
Welding operator shortly after being hired.
• Worked on a water cooled Prima Industries CNC laser.
• Moved to a fork-lift driver on 1st shift in their receiving dock.
Schaefer Construction 2001-2003 Marengo, IL
O ther
• Worked with a subcontractor and did all aspects of
Experien
carpentry; mainly rough framing and some miscellaneous finishing carpentry such
ce as ceilings and drywall.
• Familiar with power tools in many different environments
and heights.
Premiere Contractors 2000-2001 Crystal Lake,
IL
• Worked as a carpenter on a six man union crew doing mass
production building.
• Worked year round in all different types of weather