Post Job Free
Sign in

Control Project

Location:
Corsicana, TX, 75110
Posted:
September 23, 2010

Contact this candidate

Resume:

Raymond Hubert

*** ****** *****, *********, ***** 75110 Email: *********@***.*** Ph# 903-

***-****

Highlights

. Fitting operations, shipping and receiving, knowledgeable of Maximo SAP

and document controls.

. Effective written and oral skills with emphasis on multi-level management

and peers

. Several years of tracking and reporting to ensure we are within standards

. Self-motivated, proactive, and precise

. Excellent time management and resource usage skills

. Proven ability to adapt and be flexible in an ever changing work

environment

. Over 22 years experience in demanding and responsible positions in a very

diverse organization.

Experience

KELLOG, BROWN & ROOT (KBR) Houston, Texas

LOGCAP III Project Baghdad, Iraq

Materials Control Specialist, Senior

10/07-Present

. Administers production control, inventory control, shipping and

receiving of materials.

. Checks parts and materials for damage and verifies quantity, part

number, and serial number of shipped items.

. Records and prepares status reports of requested and received items.

Under general supervision, solves complex problems requiring detailed

knowledge of field and industry best practices.

. Uses experience and problem solving skills to develop and improve

processes. May provide guidance to less experienced team members.

. Compute amount of material required to complete jobs. Compiles and

maintain manual or computerized records, such as material inventory,

in-process reports, and status and location of materials.

. Duties also include installation and implementation of the Maximo,

SAP, PSR.

KELLOG, BROWN & ROOT (KBR) Houston, Texas

LOGCAP III Project Baghdad, Iraq

Warehouse Foreman

11/06-10/07

. Warehouse Foreman responsible for project management/operations,

procurement, and engineering to maximize material availability and

minimize surplus. Duties include installation and implementation of the

MAXIMO database at various sites around Iraq

. May assist in the preparation, accumulation, and maintenance of materials

control files, such as requisitions, purchase orders, etc.

. Assists in materials control cost control and training. Works under

general supervision of the Materials Control Supervisor or Senior

Materials Control Specialist.

KELLOG, BROWN & ROOT (KBR) Houston, Texas

LOGCAP III Project Baghdad, Iraq

Labor Foreman

11/05 - 11/06

. Responsible the conduct, training and welfare for 12 Local Nationals.

Duties include: Providing Force Protection by Constructing Bunkers,

fighting positions, Triple Strain Concertina wire Obstacles.

. Maintained accountability of all assigned Tools and Equipment. Provided

Base Camp Support for over 1800 Soldiers. Worked over 35,000 Man hours

without a lost time accident.

. Requisition Processing in a timely manner in accordance with strict

Governmental guidelines.

. Document Control Functions for all G-Sites in Iraq (Coalition Sector).

. Ensured that all documentation was completed in accordance with strict US

Government guidelines.

. Performed unbiased internal audits to verify procedures and

documentation.

. Coordinated local Iraqi subcontractors to ensure all materials were in

accordance with contract specs

. Maintained costs for equipment and materials held in inventory, issued to

site and returned unused

.

Elcor Corporation 1998-2005

Ennis, Texas

Control Room Operator:

. Monitoring and Quality controlling the process of making actual

Fiberglass Materials.

. Collected data to ensure that quality was kept in accordance with

Specifications.

. Coordinated with Sales and Marketing departments to ensure that we met

time standards for the delivery of our products

. Planned and directed a safe and productive operation for over 40 assigned

personnel.

. Trained and motivated each member of my group to the highest of all

standards.

. Placed Safety number one in each and every assigned task. Worked over

50,000 Man hours without a lost time accident.

Kellogg Brown & Root

1997-1998

Houston, Texas

Pipe Fitter Helper

. Prepared pipe to be assemble and installed for both and over head and

underground operations.

. Cut and drilled holes to permit passage of pipes using pneumatic drills.

. Very knowledge of specified types of pipes, brackets, couplings and other

fittings.

Kirby's Garage

Camden, Texas

Mechanic

1980 - 1997

Vehicle Mechanic Lead

In the fast paste of a family owned establishment I repaired and maintain a

variety of motor

Vehicles, my duties required several skills such as.

. Internal combustion automobiles, buses, trucks, or tractors.

. Install specified new or reconditioned parts.

. Disassembles engines and mechanical units to inspect parts and

operating defects.

. Reconditioned parts and made required adjustments and reassembles

complete unit.

. Received assignments, instructions, and direction from the Foreman or

General Foreman.

. Provide leadership instruction and guidance to lower level craftsmen

and may reassign work delegated from supervisor.

. Promotes teamwork and actively.

. Complete records, maintain tools and equipment, and performs various

clean-up and housekeeping activities.

. Observed and followed all safety rules and procedures, including

wearing required personal safety equipment.



Contact this candidate